WEEKLY ENGINEERING PROGRESS REPORT NO #06 WEEK ENDING: 9th NOVEMBER 2012
0 R
9 D
DESCRIPTION
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
TOTAL CUMULATIVE
2.0 PROGRESS ACHIEVED FOR THE WEEK a. Process List down the redundant equipment for Tapis-A base on master equipment list
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
Locate all the redundant equipment for Tapis-A listed in master equipment list with the equipment layout. Finding: some of the equipments cannot be find in the equipment layout Need conformation from SEEN Finding: Some of the process drawings related to redundant equipment not provided. SEEN to provide the remaining drawings.
Compare the redundant equipment for Tapis-A listed in master equipment list against process drawings.
b. c.
Structural Literature Review for Structural Mothballing Pipeline Preparing Make Safe and Mothballing of Redundant Pipeline report
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
d.
Electrical Drawing review and information interpretation. (continue) Discussion with engineering team leader for the data findings. (continue weekly basis) Identify and listed of equipment/facilities to be preserved/mothball. (continue) Finalized for the report format (draft) for E&I and other discipline.
e.
Instrument Drawing review and information interpretation. (continue) Discussion with engineering team leader for the data findings. (continue weekly basis) Identify and listed of equipment/facilities to be preserved/mothball. (continue) Finalized for the report format (draft) for E&I and other discipline.
f.
Mechanical
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
g.
Piping
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
3.0 WORK PLANNED FOR NEXT WEEK Process Finalize the list of redundant equipment for Tapis-A List down the redundant equipment for Tapis-C Locate all the redundant equipment for Tapis-C listed in master equipment list with the equipment layout. Compare the redundant equipment for Tapis-C listed in master equipment list against process drawings.
Pipeline
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
Electrical Discussion with team leader regarding the SOW in details. (continue) Information review and study for further understanding (continue) Finalized and preparation on the draft format report for E&I.
Instrument Discussion with team leader regarding the SOW in details. (continue) Information review and study for further understanding (continue) Finalized and preparation on the draft format report for E&I.
DEMOLITION STUDY FOR TAPIS EOR PROJECT TAPIS A, B, C AND D WEEKLY PROGRESS REPORT NO #06 WEEK ENDING : 9th NOVEMBER 2012
Piping
5.0 ATTACHMENT