Professional Documents
Culture Documents
OUR
COMPANY
PROFILE
LOT 3426A, KG KECIL KUALA LUKUT,
BATU 3½, JALAN SEREMBAN,
71010 PORT DICKSON,
NEGERI SEMBILAN.
TEL : 06 – 651 1699 / 06 – 651 0198 FAX : 06 – 651 0199
E-MAIL : kksoh88@pd.jaring.my WEBSITE : ssecengineering.blogspot.com
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
CONTENTS
NO Description Pages
CERTIFICATE OF APPRECIATION
7 22 - 28
8 PHOTOGRAPHS 29 - 47
Page 2 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
OUR
COMPANY
ESTABLISHMENT
Page 3 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
SSEC Engineering & Construction (M) Sdn Bhd formerly known as Syarikat Soh Engineering & Construction
has been vibrantly and steadily progressing in the competitive engineering and construction environment since its
establishment in 1975. It has accumulated a wealth of expertise in engineering and construction industry in major business
sectors such as Oil & Gas Industries, Oil Refineries, Power Generation Plants, Chemical Process Plants, Mechanical and
Electrical, Etc.
It has its own in house workshop facilities in Lukut, Port Dickson, with a coverage roof area of 25,000 sq.ft and open
fabrication yard of about 4.1 acres.
It has an enviable track record of safety and quality in construction works evidenced by an accident free construction history
and repeat orders from our continue us esteemed clients.
» Building M & E Works: Plumbing, Chilled Water Piping And Sprinkler Systems
» Electrical Equipment Installation, Testing & Commissioning: Isolated Phase Bus Ducts, Transformers,
Switchgears, MCCs
» Cabling Works (HV, LV, Telecom) : Laying, Splicing, Testing And Termination
Page 4 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
SSEC has a team of Experienced Project Manager, Project Coordinators, QA/QC Inspectors, Supervisors,
Foreman, Qualified High Pressure Welders (Arc, Tig, Mig And CO2), Fitters (Mill Wright, Pipe And Structural Fitters),
Riggers, Heavy Machinery Op erators, Electricians and General Workers. It also has ongoing arrangements with a pool of
reliable manpower suppliers, equipments and specialist service providers for Non Destructive Testing, Testing of
Transformers, Switchgears, Protection relays, MCCs and cables, Blasting and Heavy equipment transportation.
As part of its expansion and consolidation, SSEC has recently entered into two agreements; a Technical Consultancy
Agreement with a team of highly experiences Professional Engineers who will provide technological inputs to its
procurement, construction and commissioning work and undertake market development and marketing efforts for SSEC.
And a smart partnership with Fabricontrol (M) Sdn Bhd, a building design and engineering company.
SSEC is also in the process of bringing its quality management system within a formal structure and taking the step
forward Towards Achievement of ISO 9002 Certification.
Thus SSEC is poised to grow from strength to strength into new pastures.
Commitment towards a quality and excellence era…………..To Determine to scale new heights………..Strive towards a
total customer satisfaction …….that is SSEC’s guiding philosophy in a nut shell.
Page 5 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
6. E-mail kksoh88@pd.jaring.my
ssec88@gmail.com
Page 6 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
OUR
QUALITY
POLICY
Page 7 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Q U A LI TY P O L ICY A N D O B J E C T I V E S T A T E D
E F FE C TI VE N ES S RE GU L AR LY .
Page 8 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
QUALITY OBJECTIVES
TO FULFIL IT’S CONTRACTUAL
OBLICATIONS IN A PROFESSIONAL
A N D E T H IC A L M AN N E R.
TO ELIMINATE
ACCIDENTS AND
SAFETY HAZARDS .
Soh Koi Ke
Managing Director
Page 9 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
LAY OUT
FABRICATION, FACILITIES AT LUKUT,
PORT DICKSON, NEGERISEMBILAN,
MALAYSIA
Page 10 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
MANAGING DIRECTOR
SOH KOI KE
PROJECT MANAGER
ETRIK SOH
CONTROLS &
CNC - SPECIALIST QA / QC
INSTRUMENTATION
Page 11 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
EQUIPMENT AND
TOOLS
Page 12 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
1. Heavy Equipment
1.1 20 Ton Truck Mounted P & H Hydraulic Crane 1
1.2 16 Ton Ford Mobile Crane 1
1.3 Overhead Crane 5 Ton 1
1.4 Forklift 6 Ton 1
1.5 Forklift 3 Ton 1
2. Lifting Tools
2.1 Winches ( 3 to 10 Tons) 1
2.2 Chain Pulley Blocks (10 Tons) 1
4. Air Compressors
4.1 365CFM 1
4.2 275CFM 2
4.3 300CFM 1
5. Machine Tools
5.1 Radial Drilling Machine 1” 2
5.2 Portable Magnetic Drill 3-32mm 5
5.3 HS Abrasive Cutting machine 40mm 1
5.4 Pipe Threading Machine Max 2.5” 4
5.5 14” Cut Off Saw 8
7. Grinding Tools
7.1 HIV Driver And Electric Grinders (7” x 4”) 5
7.2 Angle Grinders 19
7.3 Pneumatic Grinder 3
7.4 Needle / Pencil Grinder 14
8. Welding Equipment
8.1 Submerged Arc Welding machine (x 1000A) 3
8.2 MIG Welding Machine (CO2) 3
8.3 Argon Welding Machine 10
8.4 Arc Welding Machine 18
8.5 Automatic Welding Set 1
8.6 Diesel Generator Welding Sets (400A) 10
8.7 Transformer Welding Sets 12
Page 13 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
15. Vehicles
15.1 Lorry 8 Ton 2
15.2 Lorry 3 Ton 2
15.3 Lorry 1 Ton 4
15.4 4 Wheels Drive 3
15.5 Van – 12 Seats 1
Page 14 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
16. Miscellaneous
16.1 Scaffolding Pipes And Clamps 1 Lot
16.2 Steel Wires, Ropes, Slings and D Shackles 1 Lot
16.3 Roofing / Hoarding Sheets 1 Lot
Page 15 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
UNDER TAKING
PROJECTS
Page 16 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Approx. Value Of
Year Brief Description Of Project Client / Owner Contract In RM
2009 To design and Constructio n Of Storage Building For Scheduled Waste Storage JIMAH O &M Sd n.Bhd 186,000.00
Maintenance work
a. To Provide Material For Fabrication a nd ins tallation of Sta inless Steel Cabinet
i. Provide Labour, Material, Equip ment, Painting a nd Co nsumab le for Netting for Safety
Cover At Canteen
To Provide manpower, consumable and tools for installatio n of tray - FMT 50 -Deethanizer KNM Ogpet (East Coast)
2009 135,000.00
Tower for 8 various tower for SPT Recovery Project, Singapore Sdn Bhd
— To Provide labour, necessary tools and equipment for the touch up welding, repair
welding, grinding to make sure vessels are acceptance by AI & QC for hydro test (4056-D &
4054-D catus) for Catofin Reactors For Propylene & Catofin Propane For Dehydrogenenatio n
Project - Petrologistics
— To Provide labour ,necessary tools and equipment for the pre-fabrication and installa tion of KNM Ogpet (East Coast)
2009 250,000.00
lifting assembly on catus for Catofin Reactors For Propylene & Catofin Propane For Sdn Bhd
Dehydrogenenation Project - Petrologistics
— To Provide manpower for modification of internal vapor baffle for 8 units of catofin reactor
for Catofin Reactors For Propylene & Catofin Propa ne For Dehydrogenenation Project -
Petrologistics
To Provide all labour ,consumables, too ls and s upervision necessary for the satisfactory
completion all works a t shop fabricatio n and assembly works includ ing no zzle, support lugs,
KNM Ogpet (East Coast)
2009 piping, ring, gussets, clip ,all internal & external attachments a nd etc. and to perform all 400,000.00
Sdn Bhd
activity relating to hydrotesting a nd other related works up to fina l delivery for the equipment
for Vessels For Abatovy project-DMSA (Sulphide Precipitatio n Reactor Vessel - 4 Units)
To Provide all labour ,consumables, too ls and s upervision necessary for the satisfactory
2008- MTTJ Engineering
completion all works a t shop fabricatio n for Mels No.2 Line Project (STF Plant Area C, 580,000.00
2009 Sdn.Bhd
Bagging Process Center & Warehouse)
To Provide all labour ,consumables, too ls and s upervision necessary for the satisfactory
2008- MTTJ Engineering
completion all works a t shop fabricatio n for Spec - Meg Project (Area GG1, GG2, GG3, GG4 & 320,000.00
2009 Sdn.Bhd
GGS Pipe rack, GC1 & GA1 Pipe Support)
Page 17 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Approx. Value Of
Year Brief Description Of Project Client / Owner Contract In RM
To Provide, Fabrication and Deliver of Support Base For The Capp ing Pipe at The Jetty Head,
Guide Plate(Including Painting) to T he Capping Pipe, Base Plate for Pile Plug and T ie Beam
2008 Taisei Corporation RM 859,480.49
Between Raked Pile and Pipe Pile / Sheet Pile To Temporary Jetty for Tuanku Jaafar Power
Statio n Port Dickson Rehabilitation Project - Phase 2
To Supply Labour, Co nsumable, Tools And Supervision For The Satisfactory Completion Of
Shop Fabr ication And Assembly Works I ncluding Its Nozzles, Support L ugs, Piping, Rings,
2007- Gussets, Clip, All Internals & External Attachments And etc, And To Perform All Activity KNM Ogpet (East Coast)
1,680,000.00
2008 Relating To Hydro testing And Other Related Works Up To Fina l Delivery Of Equipment Sdn Bhd /
Listed In Appendix 2 And With The Scope Of Work Listed In Appendix 1 At Goro Nickel,
Caledonia Project, Kua ntan.
2007- Installa tion For Mechanical Piping And I nstallatio n Work At Segamt, Comp ressor Station Sime Engg (M) Sd n Bhd / 985,000.00
2008 Expansio n Project. Petronas, Segamat
Provision Of Supervisor, Manpower, Eq uipment, Tools And Cons umable Of Fabricate, Install,
2007- Algotech (M) Sdn Bhd /
hydro test And Flus hing 1 Lot Of Aboveground Pip ing For EMSB CGC & RD Project, Kertih, 5,800,000.00
2008 Polythelene
Terengganu.
2006- - Supply Fabrication Of Stainless Steel Embedded HRA Teguh Sdn Bhd / 2.380,000.00
2008 TNB, Port Dickson.
- Supply Manpower For I nstallatio n Of Embedded Metal, Anchor Bolt Inclus ive All
T Tool Generator Set, Manpower And Welding Machine Including Consumable.
2006 Supply Of Cabin & Equip ment. Pump Supp lies Sdn Bhd / 80,000.00
Jimah Power Plant
2006 Fabrication And Installation Of Piping, Pla tform And Steel Str ucture Works – TPC 1 Liq uid Algotech (M) Sdn Bhd / 180,000.00
Dryer Package. Titan
To Provide Manpower, Equipment & Machinery For Installation Of Instrument And Electrical DL Electrical Sdn Bhd /
2006 1,340,000.00
Work For MMHE Bunga kikeh EP SO TOP-SIDES MODULE Project Unit No 9,13 And 14. MMHE Johor
2005- To Provide Manpower And Equipment For Maintena nce Work At Shell Refinery, Port UMC Services Sdn Bhd /
280,000.00
2006 Dickson, Negeri Sembilan. Shell Port Dickson
ApprewealthEngg &
2005- To Provide Machinery & Equipment For I nstallatio n Of Piping, Values, Steel Str ucture Works,
Const Sdn Bhd / UOP / 1,300,000.00
2006 Testing & Commissio ning For Bunga Raya E (BR-E) C.O.2 Removal, Johor Bahru.
Sime Engineering
2005 Supply Of Machinery To Sudan Pro ject. Peremba Intec – Sudan 80,000.00
2005 Rental Of Welding Machine At Thaila nd Project. P.C Indus trial Supply Ltd 90,000.00
/ Thailand
2005 Fabrication And Installation Of Closed Drain Tra nsfer Pump Skid Including Co mmissio ning. OGPC Sdn Bhd / RNZ 230,000.00
Intergrated (M) Sdn Bhd
To Provide Manpower, Equipment And Machinery For
2004 Supply Of Manpower For Fab rication & Insta llatio n Of Structure Steel Including Supply Of Hwa Sia ng Engg (M) Sd n 750,000.00
Material. Bhd
Constr uction Of Building Including Pump, Motor, Piping Works Fo r Water Treatment And Soon Seng Aquaculture
2004 630,000.00
Equipment. Sdn Bhd
Page 18 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Approx. Value Of
Year Brief Description Of Project Client / Owner Contract In RM
Manpower Supp ly For Valves Servicing And Mod ification Of Piping Work s For YAHO FSO Apprewealth Engg &
2004 450,000.00
At M.S.E, Jo hor Ba hru. Const Sdn Bhd
Fabrication, Erection And I nstallatio n Of Piping Works And Eq uipment Insta llatio n For Fuel Apprewealth Engg &
2003 230,000.00
And Seal Gas, MSE MISC Fuso Project. Const Sdn Bhd / M SE
Fabrication Of The Pipe Ties And Roof Bracings For Airport Termina l – New Bintulu Airpor t, Shin Evershinda i
2002 158,735.00
Sarawak. Engineering Sdn Bhd
Fabrication And Erection Of Steel Structura l Works (GAZEBO) For Malaysia Nature Society, Shin Evershinda i
2002 98,000.00
Kuala Lumpur. Engineering Sdn Bhd
Kvanrner Proccess
2001- Fabrication Of Vario us Processing Skid s, Piping, I nstallatio n & Eq uipment, Testing And
Systems Asia pacific Sdn 1,650,000.00
2002 Commissio ning.
Bhd
2001- Manpower Supp ly For Ins trument Works For OPI, Optimal At Kertih, Terengganu. Technip Geoproduction 1,800,000.00
2002 (M) Sdn Bhd
Electrical & Instr umentation Works I ncluding Vario us Test, Commissio ning Assis tance To
2000- Algotech (M) Sdn Bhd /
Foster Wheeler On Effluent Treatment Plant, Condensate Polishing Plant And ASU II At 4,328,000.00
2001 Petronas Gas Bhd
CUF-Kertih, Terenngganu.
2000- Manpower Supp ly, Materials, machinery & Equipment To Carry Out Mechanical And Piping Algotech Sdn Bhd /
3,905,000.00
2001 Works, Testing And Commissioning HRSG – A, B And C At Gebeng, Kua nta n. Petronas Gas Bhd
1999- Fabrication And Erection Of Piping Works, Commissio ning Assis tance To Foster Wheeler On Algotech Sdn Bhd /
2,250,000.00
2000 Demine Water Plant, Centralized Utility Facility At Kertih, Terengganu. Petronas Gas Bhd
1999- Vessel Fuel Oil Unloading Piping Works At Kapar, Jetty For Sulta n Sala hudd in Abd ul Az iz
Fabrication (M) Sdn Bhd 2,330,000.00
2000 Power Station, Kapar. Kla ng.
Installa tion Of One 55T/Hr Boiler (Mechanical, Electrical, C & I) At Tita n Petrochemicals Vickers Hoskins (M) Sdn
1998 358,500.00
Sdn Bhd, Tanjung Lang sat, Johor Bahr u. Bhd
1998- Installa tion Of Cooling Water, Fire Fighting Pipe Line In BPC Arcylics Complex Gebeng, Perwira Crest Sdn Bhd / 2,160,000.00
1999 Kuanta n. BASF
1998 Installa tion Of Fire Fig hting System Piping At Cabot, Port Dickson, Negeri Sembilan. Kartz Engg Sdn Bhd / 160,000,00
Cabot (M) Sdn Bhd
Kartz Engg Sdn Bhd /
Procurement And Erection Of Underground Chiller Water Pipelines System Fo r Multimedia
1998 Projess-TNEC JV / 1,750,000.00
University, Cyberjaya (14” to 2” API 5L Pipes)
Telekom Malaysia
1998 Manpower Supp ly For Ins tallatio n Of Auto matic Fare Collection System STAR L RT, Phase II, Cegelec (M) Sdn Bhd / 2,800,000.00
Kuala Lumpur. STAR LRT
Manpower Supp ly For Electrical & Instrumentatio n Works For In-flight Catering System At Cegelec (M) Sdn Bhd /
1997 650,000.00
KLIA, Sepang Malaysia Airports Bhd
Page 19 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Approx. Value Of
Year Brief Description Of Project Client / Owner Contract In RM
1996- Fabrication And Installation Of Chilled Water Piping And Eq uipment For Pha se I & II At York (M) Sales &
1,600,000.00
1997 Kuala Lumpur City Center (KLCC). Services Sdn Bhd / KL CC
Fabrication Of 2 Units Gas And Co ndensate Metering Sk ids Includ ing Co ntro ls & Cegelec (M) Sdn Bhd /
1995 1,300,000.00
Instrumentatio n System For MLNG Dua Platform For Central Luconia – M1 & M3. Sarawak Shell Bhd
1994- Installa tion Of All Electrical Equip ment – MCC, Transformers, Circuit Breakers, Cts / CVTs, Cegelec (M) Sdn Bhd /
1,200,000.00
1995 Isolators etc, And All Cabling Works, Fabrication And I nstallatio n Phase Bus D ucts. Powertek Sdn Bhd
Installa tion Of All Mechanical Equipment & Pip ing I ncluding Cons tructio n Of Metering Cegelec (M) Sdn Bhd
1994 680,000.00
Statio n Building, P ipelines etc. At Gas Metering Sta tion, YTL Power Sta tion, Pas ir Gudang. /Petronas Gas Bhd
Installa tion Of All Mechanical Equipment & pip ing I ncluding Cons tructio n Of Metering
Cegelec (M) Sdn Bhd /
1995 Statio n Building, P ipelines etc. At Gas Metering Sta tion, YTL Power Sta tion, Paka, 920,000.00
Petronas Gas Bhd
Terengganu.
1993- Instrumentatio n Works Fo r New Fur naces On Platform 2 For ICS And Safeguarding System Cegelec (M) Sdn Bhd /
Boccard Oil & Gas / 680,000.00
1994 At Shell Refinery, Port Dickson.
ESSO Malaysia Bhd
Installa tion Of Fire Protection System, PA, Telephone, Lighting And Alarm System And All Cegelec (M) Sdn Bhd /
1993 Electrical And Ins trumentatio n Works For D ulang C Topside Offshore Platform At Pasir Sime Sembawang Engg / 1,850,000.00
Gudang Yard. Petronas Carigalli
Rehabilitation & Moder nizatio n Of 2 Complex Instrumenta tion At Shell Refinery, Port Cegelec (M) Sdn Bhd /
1993 Dickson (Conversion From P neumatic To Electronic Instruments, Co nversion Of Hardwired Shell Refinir ing Co 450,000.00
Control System To PLC Based System). (FOM) Bhd
Installa tion Of All Electrical & Ins trumentation Works For T he 2 x 30MW Gas Turbine Pla nt Cegelec (M) Sdn Bhd /
1993 380,000.00
At Kapar Power Station, TNB, Por t Kla ng. Tenaga Nasional Berhad
1992- Electrical (6.6 Kv / 415V) And Instrumenta tion (Plcs & Co nnected Field Instr uments) And Cegelec (M) Sdn Bhd /
1,350,000.00
1993 Lighting Works For T he Modernizatio n Of Kiln No 1 At Cement Ind ustr ies Malaysia Plant At Cement Indus tries
Kangar, Perlis. Malaysia
1992- All Electrical & I nstrumentatio n Works Fo r Stainless Steel Cold Rolling Plant At T hainox Cegelec (M) Sdn Bhd / 3,500,000.00
1993 Steel Plant, Thailand Thainox Steel Ltd
Replacement And Upgrading Of Air Co nditioning And Ventila tion System And Ho t Water
1992- Cegelec (M) Sdn Bhd /
System Including Insta llatio n Of Chillers, Fan Coil Units, Ducting / Piping, Electrical Works 4,500,000.00
1993 Thainox Steel Ltd
etc. And Constr uction Of Chiller Plant Rooms At Club Mediterranean, Kuantan.
Page 20 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Approx. Value Of
Year Brief Description Of Project Client / Owner Contract In RM
Fabrication Of Gas Cus tody Transfer Metering Skid With All Ins trumentation And Contro l CEGG Alsthom (M) Sdn
1990 450,000.00
Panel For Baronia BNG – B Platform. Bhd / Sa rawak Shell Bhd
Haven Automatio n
1989 Installa tion Of Complete Spr inkler System On Ship M V Fa ust. (S’pore) Pte Ltd / 1,600,000.00
Sembawang S’pore
Replacement Of Economizer Coil, Insta llatio n Of Cladding And Supply Of Skilled Workmen Bharat Heavy Electricals
1974-
And Supervisors For Testing, Commis sioning And Maintenance In 110 Mw Boilers 5,6 And 7 Ltd / Lembaga Letrik 180,000.00
1975
At Tuank u Jaafar Power Station, Port Dickson. Negara
Erection Of Roof And Cladding Work I n Turbine And Bo iler House In P hase II, 2 x 60 MW, Texmaco India Ltd /
1975 450,000.00
Tuanku Jaafar Power Station, Por t Dickson. Lembaga Letrik Negara
Page 21 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
CERTIFICATE OF
APPRECIATION
Page 22 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 23 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 24 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 25 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 26 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 27 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 28 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
PHOTOGRAPHS
Page 29 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 30 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 31 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
SELIGI “B” AND “D” OFF CHORE PLOTFORMS WELL HEAD CONTROL PANEL
AND IMPULSE TUBING
Page 32 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD
Page 33 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 34 of 47 [SSEC/PROFILE/08/REV-0]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 35 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 36 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 37 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 38 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 39 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 40 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 41 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 42 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 43 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 44 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 45 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 46 of 47 [SSEC/PROFILE/09/REV-1]
SSEC ENGINEERING & CONSTRUCTION (M) SDN BHD.
Page 47 of 47 [SSEC/PROFILE/09/REV-1]