Professional Documents
Culture Documents
The Exchange is a multi use, mixed program building. The Exchanges main principle is based upon the interaction between creative professionals and the general public. The idea is based on the intertwining of three programmtic typologies: Showcase, Exchange and Production, and the benets which can be drawn from this system. The buildings form is a functional expression of the behaviour of soil particles during liquefaction. Through utilising its natural vertical process as a circulation language and a way to arrange space The Exchange principle is meshed with the liquefaction properties to generate a concept based around changing conditions. The site connects High Street to Hereford Street, within the compact core of the Christchurch Central Business District. The concept draws its potential from a previous laneway location, asserting the importance of the development and reopening of these iconic sites throughout the city. The structure terminates at the north and south facades with cantilevered segments over the streets. The building is bound on the west and east by neighbouring buildings. The building is a steel structural grid of columns and beams, with two reinforced concrete service cores and a sandblasted glass curtain wall facade. The ground oor provides a largely open, uninterrupted space for convenient pedestrian access between the two main roads. Coupled with open-plan concept retail space, the ground oor aims to make use of a potentially high level of pedestrian trafc and entice visitors up through the buildings higher levels. The rst and second levels have spaces for both work, production and the exhibition of the various creative projects generated by the tenants. The idea is to have exible space so that it can be used for a range of purposes depending on the event that day or night.
CONTENTS
7 13 23 31
RESEARCH: SOIL
LIQUEFACTION
BEFORE EARTHQUAKE
The young sediment Christchurch is built on means the city is prone to the effects of liquefaction during an earthquake event. Liquefaction variation is determined by the epicentre location, magnitude, depth, duration and geological conditions. Flat areas such as this, where the water table sits only a few meters under the surface, release a build up of pressure through sand boils and waterspouts in many areas and in lateral spreading and cracking near rivers. This occurs as waters are removed from the lower lying saturated loose sediment underground during the shaking. The water is forced up through weak points in the denser sediment just below the surface. As this occurs the loss of water in the lower layers gives way to compaction, producing a variety of effects to the natural and built environment.
LIQUEFACTION
AFTER EARTHQUAKE
SETTLED FOUNDATIONS Weakened soil can cause buildings to sink or tilt as compaction occures. this results in deformation or cracking of the building.
SUBSIDED LAND As the lower sediment compacts and moisture is forced upwards, large chunks of land subside, damaging buildings above and leaving large steps in the landscape.
FLOATED SERVICES As the pressure increases pipes become buoyant and oat up through the ground. manholes are pushed up out of the roads and pipes become damaged and severed in places, leaking their contents into the earth.
SAND BOILS Strong surface evidence that liquefaction has occured. the pressure in the ground forces the liquied silt upwards and out of the ground covering the surface in mud and water.
WEAKENED SOIL Trees, power poles, lamp posts and similar objects are unable to be supported properly by the liquied ground.
LATERAL SPREADING Earth on river banks slide towards each other under the pressure causing signicant cracks to open up. this may extend quite some distance back from the river itself.
SOIL
SOIL
LIQUEFACTION POTENTIAL
BASALT FLOWS ANDESITE POST-GLACIAL ALLUVIUM AND DUNE SAND GREYWACKE AND AGRILLITE FLOW RHYOLITE, BRECCIA AND OBSIDIAN SANDSTONE, SILTSTONE AND CLAYSTONE
HIGH LIQUEFACTION POTENTIAL MODERATE LIQUEFACTION POTENTIAL LOW LIQUEFACTION POTENTIAL HIGH LIQUEFACTION POTENTIAL EXPECTED LOW LIQUEFACTION POTENTIAL EXPECTED NO LIQUEFACTION PORT HILLS - NO LIQUEFACTION EXPECTED RIVERS CITY BOUNDARY
SCALE: 1:100000 0 2 4 6 8km
10
CBD
11
INVESTIGATION: LIQUEFACTION
13
LIQUEFACTION
SIMULATOR
LIQUEFACTION SIMULATOR A form of shake table constructed to exert lateral shaking / vibrations to a composition of soils. Software on a computer allows for set frequencies to be outputed to the container of soil via a speaker driver. The software allows the amplitude and the frequency of the driver cone to be easily controlled. This can produce an array of different scenarios, with the aim of simulating a quake which would cause liquefaction so that the cause and effects can be closely analysed. EQUIPMENT - Computer - Audiotest software - Amplifer - Simulator with 5 driver - Soil in container
14
15
LIQUEFACTION
SIMULATION
SEQUENCE IN SECTION: 5s INTERVALS SEQUENCE IN PLAN: 5s INTERVALS
SOIL CONDITIONS (LIQUEFACTION PRONE) LOWER: LOOSELY PACKED AND SATURATED SOIL. UPPER: COMPACTED, FINER SOIL
16
17
LIQUEFACTION
EFFECTS
LIQUEFACTION
PRODUCTS
LATERAL SPREADING Soil particles spread laterally under seismic stress, transferring volume from high areas to lower areas, especially near rivers and other bodies of water.
GROUND SETTLEMENT Over the duration of an earthquake the earth subsides as the seismic waves compact and densify the loose, saturated second layer soil.
GROUNDWATER PRESSURE As the soil compacts groundwater is forced out of the saturated particles, surging upwards and breaking through the dense top layer soil.
SAND BOILS / WATER FOUNTAINS Resulting from the increase in groundwater pressure, sand boils and water fountains occur through ssures in the surface layer.
SPREAD
COMPACT
SURGE
ERUPT
18
19
LIQUEFACTION
RATE OF CHANGE
SEQUENCE IN SECTION: 5s INTERVALS
LIQUEFACTION
THRESHOLD
SIGNIFICANT LIQUEFACTION
SIGNIFICANT LIQUEFACTION While the simulation was run for 60 seconds the obvious change from solid to liquid lasted only ~15 seconds. A clear threshold exsists between periods of very little change to the soil.
<
>
20
21
23
CBD BLUEPRINT
SITE PROPOSAL
V IC RIA TO
T RK PA
BEALEY AVENUE
SITE MAP
CATHEDRAL SQUARE
HARPER
AVENUE
ET RE ST
CE RA ER
SALISBURY STREET
HAGLEY PARK
PETERBOROUGH STREET
CAMBRIDGE TERRACE
DEANS
KILMORE STREET
A VE
CRANMER SQUARE
CHESTER STREET
HEREFORD STREET
9
ARMAGH STREET
HI GH
COLOMBO STREET
ST
ROLLESTON AVENUE
GLOUCESTER STREET
RE ET
LATIMER SQUARE
WORCESTER STREET
FITZGERALD AVENUE
HEREFORD STREET
RIC
CAR
TON
CASHEL STREET
AVE
NU
LICHFIELD STREET
OX
FO
RD
TE
A RR
CE
HI
GH
ST
RE
ET
TUAM STREET
CASHEL STREET
HA
Y LE
AV
EN
UE
FER
RY R
OAD
MANCHESTER STREET
BARBADOES STREET
MONTREAL STREET
COLOMBO STREET
MADRAS STREET
WALLACE STREET
DURHAM STREET
STEWART STREET
SELWYN STREET
ATIGUA STREET
SCALE | 1:1000 25
MOORHOUSE AVENUE
24
SITE CONTEXT
PEDESTRIAN CONNECTIONS
CATHEDRAL SQUARE [150m]
BOUNDING BOX
SITE CONTEXT
AVON RIVER [300m] ART GALLERY [750m] HAGLEY PARK (850m] CANTERBURY MUSEUM [950m]
HEREFORD STREET
850SQM
HI
CASHEL STREET
GH
ST
RE
ET
IN
OV AT I
ON
PR
EC
IN
CT
[2
26
00
27
PROGRAM
EXCHANGE PRINCIPLES
PROGRAM
EXCHANGE STRATEGY
NON PUBLIC
PUBLIC
FIXED SERVICES
ADJUSTABLE SPACE
DEVELOPMENT
PRODUCTION
INTERACTION
PRESENTATION
PUBLICATION
STORAGE
TOILETS
STAIRS
EXHIBITION
PRIVATE STUDIO
RETAIL
STORAGE
TOILETS
KITCHEN
CORE OFFICE
OFFICES
BAR / CAFE
28
29
31
CIRCULATION
LIQUEFACTION + EXCHANGE
SHOWCASE | PUBLIC
EXCHANGE
SPREAD
COMPACT
SURGE
ERUPT
PRODUCTION | NON-PUBLIC
32
33
PRODUCTION
CIRCULATION CONCEPT
SHOWCASE
EXCHANGE
EXHIBITION
RETAIL
LIFT
TOILETS
STAIRS RETAIL
BAR / CLUB
CINEMA
EXHIBITION
RETAIL
EXHIBITION
TOILETS
STAIRS
CAFE / BAR
CONCEPT STORES
EXHIBITION
STUDIO
CIRCULATION
FIXED SERVICES
TRANSITION SPACE
PRODUCTION EXCHANGE
RETAIL
STUDIO
TOILETS RETAIL
STAIRS
FILM
SHOWCASE
RETAIL
PERFORMANCE
RETAIL
FIXED SERVICES
TRANSITION SPACE
CATWALK
RETAIL
GALLERY
RETAIL
EXHIBITION
RETAIL
ERUPT
PRODUCTION
NON-PUBLIC
PRODUCTION
34
SURGE
PRODUCTION EXCHANGE
RETAIL
35
SHOWCASE
CIRCULATION DESIGN
FIXED SERVICES
PROGRAMMATIC SPACE
TRANSITION SPACE
SPATIAL ASSIGNMENT
PRODUCTION
DEVELOPMENT
CIRCULATION DESIGN
SERVICES & ACCESS RETAIL SERVICES & ACCESS SERVICES & ACCESS WORKSHOP
EXCHANGE SHOWCASE
EXHIBITION RETAIL
ERUPT
PRODUCTION
NON-PUBLIC
PRODUCTION
LIFT
TOILETS
STAIRS
PRIVATE STUDIO
KITCHEN
CIRCULATION
FIXED SERVICES
SURGE
RETAIL
EXHIBITION STAIRS
CAFE / BAR
RETAIL
CONCEPT STORES
EXHIBITION
STUDIO
GALLERY CIRCULATION
EXCHANGE
INTERACTION
PROGRAMMATIC SPACE SERVICES & ACCESS CONCEPTBAR / CLUB STORES SERVICES & ACCESS OFFICE CIRCULATION / MARKETPLACE
TRANSITION SPACE
LIFT
REHEARSALSTAIRS TOILETS
FILM
TRANSITION SPACE
RETAIL
SHOWCASE
SPREAD
PUBLICATION
CATWALK
ERUPT
GALLERY
RETAIL
36
PRODUCTION
NON-PUBLIC
37
OFFICE
CIRCULATION DESIGN
PROGRAM MASSING
[5]
SERVICES - Service Core - Elevator Shaft - Mens Toilet - Womens Toilet - Stairwell
EXCHANGE - Cafe / Bar - Small Scale Retail Space - Medium Scale Retail Space
PRODUCTION - Open Plan Studio / Ofce - Small Private Studio / Ofce - Medium Private Studio / Ofce
COMPLETE ASSEMBLY
38
39
FLOOR PLAN
GROUND LEVEL
A 0 00 10 B
FIRST LEVEL
FLOOR PLAN
A 0 00 10 B
0 00 10 C 50 00 D
E 5000 F 10000 G 5000 H 10000 SERVICES CORE I 10000 J
0 00 10
E AF AR /B SE
C 50 00 D
E 5000 F 10000 G 5000 H 10000 SERVICES CORE I 10000 J
5000
CONCEPT STALLS
WC
WC
EXHIBITION SPACE
WC
WC
2 5000
5000
SE I RV C ES C O R E W C W C
3 4 1
I RV C ES C O R E W C PR E AT IV U ST D IO W C
40
SCALE | 1:200
SCALE | 1:200
41
FLOOR PLAN
SECOND LEVEL
A
CROSS
SECTION
0 00 10 B 0 00 10
H EX IT IB IO N AC SP E
C 50 00 D
E 5000 F 10000 G 5000 H 10000 SERVICES CORE I 10000 J
PRIVATE STUDIO
WC
WC
5000
KITCHEN / LOUNGE
OPEN-PLAN STUDIO
5000
5000
SE I RV C ES C O R E W C
2 1
STEEL HOLLOW SECTION COMFLOR 210 COMPOSITE FLOOR STEEL I-BEAM STEEL I-COLUMN
W C PR E AT IV ST D U IO
42
SCALE | 1:200
SCALE | 1:100
43
SECTION
LONGITUDINAL
44
45
HEREFORD STREET
46
47
GROUND FLOOR
INFORMAL CINEMA
48
49
SECOND FLOOR
50
51