You are on page 1of 4

HAMMAKPOPP CONSORTIUM

LTD

Project
Client
Location

Made by

Pilecap C10

6 Pile Cap

PILECAP DESIGN to BS 8110:1997


Originated from CiD Pilecaps.xls on CD

DIMENSIONS mm

Checked

Date

Revision

W.O

2001 Concrete Innovation & Design

Page

3-Mar-13
-

27
Job No

P2000

PILECAP

A=
B=
C=
D=
E=
depth H =

COLUMN

= 350
= 500

Rod

350
1300
1300
650
0
650

Concrete Innovation & D

Pile = 375
Min spacing = 1300

COLUMN ACTIONS kN, kNm characteristic


DEAD IMPOSED
WIND
Axial (kN) 612.0
211.0
23.0
Mx (kNm) 18.0
5.0
2.0
My (kNm) 22.0
10.0
5.0
Hx (kN)
1.8
0.5
0.2
Hy (kN)
2.2
1.0
0.5

KEY

PLOT (to scale)

STATUS VALID DESIGN

PILE REACTIONS kN

Gk + Qk
Gk + Qk +Wk

PILE 1

PILE 2

PILE 3

PILE 4

PILE 5

PILE 6

141.2
144.2

153.8
157.9

147.8
151.8

160.3
165.5

154.3
159.4

166.9
173.0

REINFORCEMENT
EW(1/5-2/6) M = 296.6 kNm,

b = 3,300 mm
As = 1,293 mm
14 T16 B2 = 2,815 mm

d = 551.0 mm,

V = 624.4 kN, bv = 3,300 mm


v = 0.343 N/mm, (v-vc)b = 1,320 N/mm
14 Legs T10 @ 350 LINKS = 1,376 N/mm
b = 2,000 mm
d = 567.0 mm, As = 1,857 mm
10 T16 B1 = 2,011 mm

14 T12 24 T2

14 T16 23 B2
Links 14x6 T10 25 350
ELEVATION

NS(1/2-5/6) M = 438.2 kNm,

V = 417.3 kN, bv = 2,000 mm


v = 0.368 N/mm, (v-vc)b = 800 N/mm
10 Legs T10 @ 425 LINKS = 810 N/mm

10 T12 27 T1

10 T16 26 B1
14 Link Legs
ELEVATION

HAMMAKPOPP CONSORTIUM
LTD

Project

Client
Location

0
Pilecap C10

Designed by Date

6 Pile Cap

PILECAP DESIGN to BS 8110:1997


Originated from CiD Pilecaps.xls on CD

Cap load =

101.2

M=
b=
d=
K=
z=
As =
Provide
No =
As prov =
fs =
Max clear S =
Min clear S =
Clear S =

PILE 2
153.8
157.9
198.5
107.1
168.3

BOTTOM

TOP

16

12

296.6
3300
551.0

0.0
3300
582.0

0.0085
523.5
1293
2789
14
2815
141

0.0000
552.9
0
0
14
1583

PILE 3
147.8
151.8
190.0
101.7
161.0

Revision

336.2
374.4
229.4
252.8

N-S STEEL BOTTOM


TOP
16
12
M = 438.2
0.0
b = 2000
2000
d = 567.0
594.0
K = 0.0195 0.0000
z = 538.7
564.3
As =
1857
0
Provide 1857
0
No =
10
10
As prov =
2011
1131
fs =
283 10 T12 T1
Max clear S = 284.0
Min clear S =
25.0
Clear S = 191.1

14 T12 T2

Critical section is 112.5 mm from pile centres


10 links
v = 0.3434
As% = 0.155
.
vc 2d/av = 0.7783
(v - vc)b = 1320.0
No of legs = 14
Spacing = 350
14 Legs T10 @ 350 LINKS

NS (EW plane)

v = 0.3680
vc = 0.3972
No of legs = 10

PUNCHING
V=
v=
v max =

Column Face
1194.4

1.257
4.733

ok

P2000

K' = 0.1558
min As = 0.13%

10 T16 B1

V = 417.3
av = 1187.5

28
Job No

PILE 6
166.9 .
173.0 .
217.7
119.0 .
186.5

1.2(Gk+Qk+Wk)

227.4

V = 624.4
av = 537.5

PILE 5
154.3
159.4
199.6
107.6
170.1

213.0
237.9
144.9
161.1

14 T16 B2
BEAM SHEAR

PILE 4
160.3
165.5
208.1
113.0
177.4

Gk + 1.4Wk

284.0
25.0

EW (NS plane)

W.O

Page

3-Mar-13

OVERTURNING MOMENTS - kNm characteristic


DEAD IMPOSED
WIND
Mx
19.2
5.3
2.1
My
23.4
10.7
5.3

BENDING MOMENTS - kNm


1.4Gk + 1.6Qk
My v of col
397.9
My ^ of col
438.2
My < of col
270.8
My > of col
296.6
E-W STEEL

Checked

2001 Concrete Innovation & Design

kN

PILE REACTIONS kN
PILE 1
Gk + Qk
141.2
Gk + Qk +Wk
144.2
1.4Gk + 1.6Qk
180.4
Gk + 1.4Wk
95.7
1.2(Gk+Qk+Wk)
151.9

Rod

As% = 0.177
(v - vc)b = 800.0
Spacing = 425

10 Legs T10 @ 425 LINKS

No other critical section


m = 6504
d ave = 559
v = 0.000
av = 537.5
vc 2d/av = 0.808
ok

OPERATING
0 INSTRUCTIONS

Fs =

ENTER DATA IN BLUE/MAGENTA CELLS ONLY.

bond L =

40472

81345.68

273

548

RED MESSAGES0 INDICATE ENTRY ERRORS.


THIS
6-PILE CAPS ONLY.
SET PAGE for175
PROJE
CT

35

Bar Marks

650
200

Concrete Innovation & Design


1300

Recommened min H = 625 mm

.
SIGN CONVENTION
Y
X
M

.
.
.
.

T H

0
0
0
0
0

0
0

192 kg per cap

Btm

23

26

23

26

Top

24

27

24

27

Links

25

28

25

28

2
1

d=
b=
K=
z=
As =
Provide
No =
fs =
S=

SELECT MAIN s
EW
NS
537.5
562.5
3300
2000
0.0044 0.0099
510.6
534.4
1326
1872
2789
1872
12
8
307
307
300.0
300.0

1394

845

14
8

10
5

SELECT LINK
EW (NS plane)
NS (EW plane)

112.5

b=
3300
%=
0.076
Av = 537.5
537.5
V = 570.0
624.4
v = 0.3214 0.3520
vc 2d/av = 0.5996 0.5996
(v - vc)b = 1320.0 1320.0
Asv/Sv =
3.0130
Btm S =
243.4
14
Min legs =
14
Legs =
14
Asv (1 leg) =
86.8
-918.2 -817.0

1,376.3

809.6

closest pile from col face = 475.0


1.5 ave d = 838.5
width = 1075.0
height = 2177.0
r = 0.166

537.5
537.5

2000

0.170
1187.5 1187.5
379.0
417.3
0.3369 0.3709
0.3914 0.3914
800.0
800.0
1.8261
207.1
10
10
10
77.0
-109.1
-41.0

You might also like