2013 PSD Tech., Inc. All rights reserved. No part of this document may be reproduced, stored in an electronic database or transmitted in any form by any means, electronic, photocopying, recording or otherwise, without the prior written permission of the copyright holder. For more detailed information, please contact us at:
PSD TECH
Hyundai I Valley #301,223-12 Sangdaewon 1-dong, Jungwon-gu, Seongnam-city, Gyeonggi-do, KOREA 462-714. Tel: 82-31-737-9290 Fax: 82-31-737-9290 Website:www.psdtech.com E-mail: info@pstech.com
Table of Contents
1. Executive Summary 2. Testing Equipment 3. Criteria 4. Test Result 5. Conclusion 6. Recommendation
1. Executive Summary
1.1. 1.2. 1.3. 1.4. 1.5. 1.6. 1.7. Project: Scope: Site: Date: Participants: Measured Target: ALBA 220kV S/S GIS Ultra High Frequency PD Testing ALBA 220kV in Bahrain March 25th & 26th 2013 Dr. Kyoungjun Hwang from PSD Tech., Inc. Total 2 Bay (Reb/Blue/Yellow Phase) 18 points (External Sensor) Purpose of Testing: A) ALBA proposed to inspect condition of Japen AE 220kV S/S GIS. B) ALBA proposed to process detail diagnosis of 2 bays: RST31 & GT62.
2. Testing Equipment
2.1. Sensor
2.2.
PD Measurement Unit
3. Criteria
3.1. UHF PD Testing Assessment Normal Recommendation 3.1.1. Single Identification -Q-N Waver Pattern Analysis (%) Below 50%
Periodical Testing (1 time per every 6 to 12 months) Above 50% Warning Periodical Testing (1 or 2 times per every 2 to 3 months) * Three Days continuous testing is required. * Continuous Online Monitoring System is highly recommended. 3 Days Continuously Alert Periodical Testing (1 or 2 times per very 1 to 2 Same Pattern was months) notified and it was * Replacement might require. above 50% * Continuous Online Monitoring System is highly recommended. Remark: Noise should not be added on any result. 3.1.2. Double Identification -Q-N Waver Pattern Analysis (%) Sub of two identification is below 65% Sub of two identification is above 65% Assessment Normal Warning Recommendation Periodical Testing (1 time per every 6 to 12 months)
Periodical Testing (1 or 2 times per every 2 to 3 months) * Three days continuous testing is required. * Continuous Online Monitoring System is highly recommended. 3 Days Continuously Alert Periodical Testing (1 or 2 times per very 1 to 2 Same Pattern was months) notified and sum * Replacement might require. was above 65% * Continuous Online Monitoring System is highly recommended. Remark: Noise should not be added on any result.
4. Test Result
4.1. Method Statement By using PD Measurement of PSD (PAMoS), check whether there is Partial Discharge at the Gas Insulated Switchgear (GIS). Two bays (RST 31 & GT 62) were tested during two days and for RST 31, Bus Spacer, CB Spacer and Cable Header. Same as RST 31, Bus Spacer, CB Spacer and Cable Spacer of GT 62 were tested. Each point was installed with External UHF Sensor to measure the Partial Discharge. Furthermore, Noise Sensor was installed where would have most external noise at moment. Both Sensors (UHF & Noise Sensors) were connected to the PAMoS and by using hardware noise gating, external noises and real PD inside of GIS were clearly distinguished.
(Testing Points)
4.2.
Test Result BAY RED #1 BUS SPACER YELLOW BLUE RED YELLOW BLUE #3 CABLE HAEDER #1 BUS SPACER RED YELLOW BLUE RED YELLOW BLUE RED PD Measurement No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD No PD Status Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal Normal
RST 31
#2 CB SPACER
GT 62
4.3.
Measuring Point
PRPS
PRPD
RED Phase
BLUE Phase
YELLOW Phase
PRPS
PRPD
RED Phase
BLUE Phase
YELLOW Phase
PRPS
PRPD
RED Phase
BLUE Phase
YELLOW Phase
RED Phase
BLUE Phase
YELLOW Phase
PRPS
PRPD
RED Phase
BLUE Phase
YELLOW Phase
PRPS
PRPD
RED Phase
BLUE Phase
YELLOW Phase
5. Conclusion
5.1. UHF PD Measurement
5.1.1. No PD movement was notified at RST 31 and GT 62 of 220kV S/S GIS. 5.1.2. Site itself includes much of noises, however it is not real PD inside of GIS and it was only external noises.
6. Recommendation
No PD movement was notified for Japan AE 220kV GIS, however, highly recommend for periodical testing. 1 time per every 6 to 12 months should be preferable interval for periodical testing to prevent the potential accident.