Professional Documents
Culture Documents
CS/B.Tech (CE)/SEM-8/CE-803/07
1.
Signature of Invigilator
2.
Signature of the Officer-in-Charge
Reg. No.
CS/B.Tech (CE)/SEM-8/CE-803/07
ENGINEERING & MANAGEMENT EXAMINATIONS, MAY 2007
[ Full Marks : 70
2.
3. 4. 5. 6.
7. 8.
9.
CS/B.Tech (CE)/SEM-8/CE-803/07
{ PAGE }
NO
IT
TH
IS
AG
{ EQ \X( 5823 ) }
CS/B.Tech (CE)/SEM-8/CE-803/07
{ PAGE }
{ EQ \X( 5823 ) }
CS/B.Tech (CE)/SEM-8/CE-803/07
4. 5. 6.
{ PAGE } Define optimum time estimate and permissible time estimate. Describe schedule of quantities and running account. What is Arbitration Act ? Group - C ( Long Answer Type Questions ) Answer any three questions. 3 15 = 45
7.
What are the principles of planning ? Describe all the principles of planning in detail. 4 + 11 Describe properly all the principal requirements of an office building. 15
8. 9.
What are the regulations followed in limitations in height of the building and cover area in plot ? 15 What are the internal requirements for an auditorium ? Describe in detail with a neat sketch. 15 Figure given below shows the network for a construction project, with the three time estimates of each activity marked. Determine : a) b) c) Critical path and its standard deviation Probability of completion of project in 40 days. Time duration that will provide 95% probability of its completion in time 15
10.
11.
Fig.
{ EQ \X( 5823 ) }