You are on page 1of 2

PERUNDING EAGLES ENGINEERS SDN BHD

Consulting Engineer 737562-U


*PLEASE PUT N/A FOR ITEMS THAT NOT APPLIABLE, OR TBA FOR ITMES THAT YET TO GET INFO

PROJECT INFORMATION
1 2 New Project Code : Project Title : PEE 1140 THE DESIGN, CONSTRUCTION, COMPLETION, EQUIPING, COMMISSIONING AND MAINTENANCE OF WOMEN & CHILDREN HOSPITAL (600BEDS) KUALA LUMPUR.

3 4 5 6 A

Main Contractor : (If Any) : Commencement Date : Estimated Completion Date :

NAJCOM SDN. BHD.

CLIENT AND PROFESSIONAL TEAM DETAIL CLIENT Company Name : KEMENTRIAN KESIHATAN MALAYSIA Address : BAHAGIAN PERANCANGAN & PEMBANGUNAN KEMENTRIAN KESIHATAN MALAYSIA
ARAS 6-9, BLOK E6 KOMPLEKS KERAJAAN MALAYSIA PARCEL E 62600 PUTRAJAYA WILAYAH PERSEKUTUAN MALAYSIA

Person In Charge:

E-Mail:

Telephone : Fax : B ARCHITECT Company Name : ARKITEK SAIFULLIZAN OSMAN Address : Telephone : Fax : C No. 22A-3 Jalan Wangsa Delima 11, Wangsa Maju, 53300 Kuala Lumpur. 03 41494770 03 41494670 E-Mail: Person In Charge:

C & S ENGINEER Company Name : PERUNDING REKACEKAP SDN. BHD. Address : Telephone : Fax : 11A-3, JALAN USJ 21/7, 47630 UEP SUBANG JAYA, SELANGOR DARUL EHSAN. 03 80231872 03 80235125 AUTHORITY

Person In Charge: E-Mail: prc88@streamyx.com

QUANTITY SURVEYOR Company Name : Address : Telephone : Fax : PRIMAKOS 3rd Floor, University Heights, 83D -3-17 Jalan Sungai Dua, 11700 Penang. 04 6583111
04 6581696

Person In Charge: -

E-Mail: ADDRESS CONTACT (Tel &Fax) PERSON IN CHARGE

NO 1

PERUNDING EAGLES ENGINEERS SDN BHD


PROJECT MONITORING
NEW PROJECT CODE : PEE 1171
PROJECT TEAM LEADER : LEE YUN PHING PROJECT ENGINEER(S) : CHANG SIAW YI / MUNIRAH PROJECT DRAUGHTER(S) : KAMA AZILA / MAY ONG PROJECT ADMINISTRATOR: VICKY SHANG / RITA LIU

LIF = Lift FIRE = Fire ELE = Electrical SP=Sanitary Pumping D P G


KIV

Done Pending On Going Keep In View

SL = Street Lighting CW = Cold Water AIRCON = Air-Conditioning TEL = Telephone

*PLEASE GIVE REMARKS ON ALL STATUS

DESCRIPTION
SCOPE OF WORKS : (a) Internal & External Electrical Services (b) Internal & External Telephone Services (c) Internal Cold Water & Sanitary Plumbing System (d) Internal Sanitary Plumbing System (e) Fire Protection System (f) Air-Conditioning and Ventilation System PRELIMINARY STAGE (a) Preparing the preliminary design drawings.

SERVICE

START Targeted Actual

END Targeted Actual

STATUS

Variation Start End

OUTSTANDING ISSUE/REMARKS

SL TEL CW SP FIRE AIRCON ELE LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT

P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P P P P P P P P P P P P P P P P P P

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 Archirecture layout yet to finalized 0 0 0 0 0 0 0 0 Archirecture layout yet to finalized 0 0 0 0 0 0 0 Archirecture layout yet to finalized 0 0

DESIGN STAGE (a) Developing the schematic design drawings upon approval of the relevant authority or the client (SU).

(b) Preparing performance specifications and tender drawings in connection with the works

(c) Providing initials cost estimate and project programmes

0 0 0 0 Archirecture layout yet to finalized 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TENDER STAGE (a) Assemble tender document & Call tender on behalf of the Client

(b) Tender evaluation and Conduct tender clarification meeting

CONTRUCTION STAGE (a) Comments on shop drawings

(b) Testing & Commentionning

(c) Issue of CPC

AUTHORITY SUBMISSION
SYABAS - Submission of Drawing Telekom (TMB) - Submission of Drawing - Handover Inspection - Surat Sokongan Tenaga Nasional Berhad (TNB) - Submission of Drawing 1) Substation 2) Cable Routing 3) Meter Details - Borang MAP A MAP B & MAP C - Cas Sambungan - Substation handover Inspection - Surat Sokongan MBSA - Submission of Drawing - Handover Inspection - Surat Sokongan Jabatan Bomba & Penyelamat - Submission of Drawing - Handover Inspection - Surat Sokongan

SERVICE
CW

START Targeted Actual

END Targeted Actual

STATUS
P

Variation Start End


0 0

OUTSTANDING ISSUE

TEL

P P P
TNB

0 0 0

0 0 0

P P P P P P
SL

0 0 0 0 0 0 0

0 0 0 0 0 0

P P P
BOMBA

0 0 0 0 0 0

0 0 0 0 0 0

P P P

You might also like