PROJECT INFORMATION
1 2 New Project Code : Project Title : PEE 1140 THE DESIGN, CONSTRUCTION, COMPLETION, EQUIPING, COMMISSIONING AND MAINTENANCE OF WOMEN & CHILDREN HOSPITAL (600BEDS) KUALA LUMPUR.
3 4 5 6 A
CLIENT AND PROFESSIONAL TEAM DETAIL CLIENT Company Name : KEMENTRIAN KESIHATAN MALAYSIA Address : BAHAGIAN PERANCANGAN & PEMBANGUNAN KEMENTRIAN KESIHATAN MALAYSIA
ARAS 6-9, BLOK E6 KOMPLEKS KERAJAAN MALAYSIA PARCEL E 62600 PUTRAJAYA WILAYAH PERSEKUTUAN MALAYSIA
Person In Charge:
E-Mail:
Telephone : Fax : B ARCHITECT Company Name : ARKITEK SAIFULLIZAN OSMAN Address : Telephone : Fax : C No. 22A-3 Jalan Wangsa Delima 11, Wangsa Maju, 53300 Kuala Lumpur. 03 41494770 03 41494670 E-Mail: Person In Charge:
C & S ENGINEER Company Name : PERUNDING REKACEKAP SDN. BHD. Address : Telephone : Fax : 11A-3, JALAN USJ 21/7, 47630 UEP SUBANG JAYA, SELANGOR DARUL EHSAN. 03 80231872 03 80235125 AUTHORITY
QUANTITY SURVEYOR Company Name : Address : Telephone : Fax : PRIMAKOS 3rd Floor, University Heights, 83D -3-17 Jalan Sungai Dua, 11700 Penang. 04 6583111
04 6581696
Person In Charge: -
NO 1
DESCRIPTION
SCOPE OF WORKS : (a) Internal & External Electrical Services (b) Internal & External Telephone Services (c) Internal Cold Water & Sanitary Plumbing System (d) Internal Sanitary Plumbing System (e) Fire Protection System (f) Air-Conditioning and Ventilation System PRELIMINARY STAGE (a) Preparing the preliminary design drawings.
SERVICE
STATUS
OUTSTANDING ISSUE/REMARKS
SL TEL CW SP FIRE AIRCON ELE LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT SL TEL CW ELE SP FIRE AIRCON LIFT
P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P D P P P P P P P P P P P P P P P P P P P P P P P P
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 Archirecture layout yet to finalized 0 0 0 0 0 0 0 0 Archirecture layout yet to finalized 0 0 0 0 0 0 0 Archirecture layout yet to finalized 0 0
DESIGN STAGE (a) Developing the schematic design drawings upon approval of the relevant authority or the client (SU).
(b) Preparing performance specifications and tender drawings in connection with the works
TENDER STAGE (a) Assemble tender document & Call tender on behalf of the Client
AUTHORITY SUBMISSION
SYABAS - Submission of Drawing Telekom (TMB) - Submission of Drawing - Handover Inspection - Surat Sokongan Tenaga Nasional Berhad (TNB) - Submission of Drawing 1) Substation 2) Cable Routing 3) Meter Details - Borang MAP A MAP B & MAP C - Cas Sambungan - Substation handover Inspection - Surat Sokongan MBSA - Submission of Drawing - Handover Inspection - Surat Sokongan Jabatan Bomba & Penyelamat - Submission of Drawing - Handover Inspection - Surat Sokongan
SERVICE
CW
STATUS
P
OUTSTANDING ISSUE
TEL
P P P
TNB
0 0 0
0 0 0
P P P P P P
SL
0 0 0 0 0 0 0
0 0 0 0 0 0
P P P
BOMBA
0 0 0 0 0 0
0 0 0 0 0 0
P P P