Professional Documents
Culture Documents
Feb 2012/vers.1.6/1
Agenda
01. 02. 03. 04. 05. 06. 07. 08. 09. 10. NKT Holding nkt cables management and sales regions Vision and guiding principles nkt cables world Key figures Expanding sales presence Our customers Major projects Innovations Manufacturing facilities
Feb 2012/vers.1.6/2
NILFISK ADVANCE
NKT Holding is listed on the Danish Stock Exchange Numbers concern 2010
*NKT Flexibles was acquired by National Oilwell Varco on February 3rd 2012. The transaction is excepted to be closed no later than on June 30th 2012.
Feb 2012/vers.1.6/3
CENTRAL & EAST EUROPE SVP Maciej Zajac ASIA PACIFIC, MIDDLE EAST, AMERICA & AFRICA SVP Ercihan Kurt
Feb 2012/vers.1.6/4
OUR VISION: nkt cables is creating value for its customers by providing solutions with cables
OUR GUIDING PRINCIPLES: We supply creative and sustainable products, services and solutions for our customers Our company is built on trust, fairness, courage and passion We say what we do and do what we say
Feb 2012/vers.1.6/5
Feb 2012/vers.1.6/6
35%
mEuro
27% 38%
1500
1000
SALES BY APPLICATION AREAS
500 5% 5% 0 2006 2007 2008 2009 2010 21% 10% 59% Electrical infrastructure Construction Railway Automotive Other
Feb 2012/vers.1.6/7
Sales offices
Cooperation partners
Our Customers
OEMs
WHOLESALERS
CONTRACTORS
UTILITIES
RAILWAY OPERATORS
AUTOMOTIVE
Feb 2012/vers.1.6/9
Major Projects
HIGH VOLTAGE CABLES TenneT Project: biggest project worldwide for 400 kV cable system, 130 km NAan project: 220 kV cable, 50 km part of major upgrade of New Zealands electricity grid Beddington project * : 400 kV cable system in tunnel, 30 km
SUBMARINE CABLES
RAILWAY
Baltic 1 turnkey wind farm connection*: PDL Beijing Tianjin, China*: 150 kV export cables and infield First Very High Speed Line in the world cabling, 61 km 350 km/h, 117 km Baltic 2 turnkey wind farm connection. PDL Wuhan Guangzhou, China*: 150 kV export cables, 60 km Chinas longest high-speed train link 350 km/h, 1,068.6 km Gwynt y Mr project: Beijing Shanghai, China*: 132 kV HV submarine cables for the GyM offshore wind farm, 88 km 380 km/h, 1,318 km Anholt project: 245 kV AC cable, 25 km the cable connects the Anholt Offshore Wind Farm with Jutland Madrid Valencia, Spain*: 350 km/h, 438 km Orense - Santiago de Compostella, Spain: 300 km/h, 87.5 km Gotthard Tunnel, Switzerland: 250 km/h, 57 km
Feb 2012/vers.1.6/10
*In Operation
Innovations
HV cables Submarine cables Dynamic rating solution For economic grid performance HV accessories
Valcond Accessories
Qaddy
nkt instal
nktdoc
Railway insulator with special sheet design for upside down application
Feb 2012/vers.1.6/11
Manufacturing facilities
at highest technological level
Our manufacturing plants are among the most modern, flexible and costeffective in the world
We invest heavily in our manufacturing facilities to keep them at the highest technological level
Feb 2012/vers.1.6/12