DESIGN OFMAIN PUMPING STATION AT NODE NO.

1133 AT EXISTING STP Design of Collecting tank:As the sewerage pipe lines have been designed for the entire project area taking provisions of future development on the adjoining vacant land hence the collecting tank has been designed on ultimate discharge taking provisions of future development on adjoining vacant land also. However the machineries of MPS are to be designed on the prospective population of 2030, which has been derived as shown below. Total population of 2045 as per the design statement = 755875. STP wise distribution of total population of project area as per design statement of 2045: 1. Existing STP : 378964 2. Proposed STP near village Sahdod : 145985 3. Proposed STP near village Khanpur : 230926 Total Population of project area as per the 2011 census = 104833. Percentage increase per year from 2011 to 2045 = x 100 = 18.26 %

Prospective population 2030 = Population as per the 2011 census + increase @ 18.26 % p.a. upto 2030 = 104833 + = 468540

Total Average flow as per 2030 population = 468540 X 135 X 0.85 = 54 MLD or 625 lps Total Peak flow as per 2030 population = 2.25* 625 = 1406 lps STP wise distribution of peak flow as per 2030: 1. Existing STP : 50 % of 1406 = 703 lps

2. Proposed STP near village Sahdod : 19.3 % of 1406 = 272 lps 3. Proposed STP near village Khanpur : 30.6 % of 1406 = 430 lps

MPS at Existing STP Peak Flow as per the design statement of 2045=1089.50 lps (say 1090 lps) Capacity required at STP=5 minutes retention time at peak flow =1090*5*60=327000 ltrs/1000=327 M^3 Capacity of existing collecting tank=56.54 m3 Capacity of Proposed tank=327-54.54=270.46 m3 Taking Working Depth=2.0M Size of collecting tank=270.46/2=135.23 m2=(135.23/.785)^.5=13.125 m (Say13 m) Provide 13m dia and 2.0 Working depth collecting tank. Design of Pumping Machinery:Designed Peak flow at 2030(at 15 years )=703 lps Capacity of existing machinery = 95 lps Proposed size of machinery= 703-95 = 608 lps Provide 6 nos.(4W+2SB) non clog sewage submersible pumping sets each of capacity = 608/4 = 152 lps or 9120 lpm (say 9000 lpm) Head:Static Head =252.76-246.435 =6.325 m Depth of submergence = 1 m Static head from MPS to Inlet of screening chamber = 3 m

Suction and delivery losses =2 m Terminal Head = 1.5 m Total=6.325+1+3+2+1.5=13.825 Say=15 mtrs Capacity of Motors= = 37.79 (say 40 kW)

Provide 6 nos. (4W + 2SB) non clog sewage submersible pumping sets, each capable of delivering 9000 LPM discharge at 15 m head with 40 kW motor each. Design of DG set: In case of failure of electricity provide one Gen Set of 40 KVA to run the machinery.