Review Test Submission: Exercise 1

SKIP TO: COURSE MENUSKIP TO: SYSTEM NAVIGATION

Content
User Course Test Started Submitted Status Attempt Score Time Elapsed Instructions Mr. ROHIT MUKHERJEE . Project Management Exercise 1 10/29/13 6:47 PM 10/29/13 7:27 PM Completed 24 out of 30 points 39 minutes.

Question 1
0 out of 1 points

Which of these is NOT the role of a project manager?


Answer Selected Answer:

Making a team
Correct Answer:

Manage relation with the customer and company

Question 2
1 out of 1 points

Which of the following does NOT form the phases of project management life cycle?
Answer Selected Answer:

System design specification


Correct Answer:

System design specification

Question 3
0 out of 1 points

Which of these are NOT project management processes?


Answer Selected Answer:

Customisation
Correct Answer:

Perform quality control work

Question 4
1 out of 1 points

The analysis and evaluation phase starts with receiving a request to analyze the problem from the manager.
Answer

Selected Answer: Correct Answer:

True True 1 out of 1 points

Question 5

Project feedback analysis and project execution report is done in post completions analysis phase of the projects.
Answer Selected Answer: Correct Answer: True True 0 out of 1 points

Question 6

A detailed project management plan might be necessary to indicate every detail in __________.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer initial stage Case Sensitivity project

Question 7
1 out of 1 points

"Communication and managing expectations effectively with clients, team members and___________."
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer stake holders Case Sensitivity stake holders

Question 8
1 out of 1 points

"___________ is achieved by systematically thinking about possible risk, their impact and ways of limiting their likelihood and impact."
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer Risk management Case Sensitivity Risk Management

Question 9
1 out of 1 points

_____________ deals with ensuring that the changes to the scope of project are decided and authorized with due consideration of all the relevant aspects.
Answer Selected Answer: Correct Answer: Scope Management

Evaluation Method Exact Match

Correct Answer Scope management

Case Sensitivity

Question 10
1 out of 1 points

____________ has the major importance in project management.


Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer Planning Case Sensitivity Planning

Question 11
1 out of 1 points

Any project is undertaken to deliver either a service or a product


Answer Selected Answer: Correct Answer: True True 1 out of 1 points

Question 12

The estimation approaches are the logarithmic and sequential approaches.


Answer Selected Answer: Correct Answer: True True 1 out of 1 points

Question 13

"The five characteristics of a project are resources requirement, funds, probability of completion, risk and design changes."
Answer Selected Answer: Correct Answer: True True 0 out of 1 points

Question 14

"Avoiding areas of problems, which may not be the progress of the project is the only factor to be considered for scoping a project."
Answer Selected Answer: Correct Answer: False True 1 out of 1 points

Question 15

The analysis process is necessary to control the project from deviating and also monitor the performance.
Answer Selected Answer: Correct Answer: True True

Question 16
1 out of 1 points

"In the control process, the progress is _____________ and the changes are managed."
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer monitored Case Sensitivity monitored

Question 17
0 out of 1 points

The entire process of a project may be considered to be made up on number of sub process placed in different stage called the __________.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer breakdown structure Case Sensitivity work breakdown structure

Question 18
1 out of 1 points

"___________ is the amount of time, which a successor task can overlap with its predecessor s task. "
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer Lead time Case Sensitivity Lead time

Question 19
1 out of 1 points

The project manager can also use the process ___________ to get information about risks and risk management database on similar project.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer database Case Sensitivity database

Question 20
1 out of 1 points

__________ requires analyzing the possible effects of the risk event in case it actually occurs.
Answer Selected Answer: Correct Answer: Evaluation Method Correct Answer Case Sensitivity Prioritisation

Exact Match

Prioritisation

Question 21
1 out of 1 points

Responsiveness refers to quickness of response of an individual


Answer Selected Answer: Correct Answer: True True 1 out of 1 points

Question 22

It is possible to improve the pace of the project by reducing the time frame of the process.
Answer Selected Answer: Correct Answer: True True 1 out of 1 points

Question 23

The individual process are linked by inputs and outputs.


Answer Selected Answer: Correct Answer: True True 1 out of 1 points

Question 24

Input refers to the documented that are results of the process.


Answer Selected Answer: Correct Answer: True True 0 out of 1 points

Question 25

Identifying variances from the plan is a part of closing processes.


Answer Selected Answer: Correct Answer: False True 1 out of 1 points

Question 26

It is possible to work according to the project plan only by careful __________ of the project progress.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer monitoring Case Sensitivity monitoring

Question 27
1 out of 1 points

During the _______ the members must keep a track of the project progress and communicate the same to other related members of the project.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer project progress Case Sensitivity project progress

Question 28
1 out of 1 points

_________ is possible if the project members follow the quality charts and norms very strictly.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer Quality control Case Sensitivity Quality control

Question 29
1 out of 1 points

The product obtained after every stage must meet the ________ of that stage.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer requirement Case Sensitivity requirement

Question 30
1 out of 1 points

Project stage reviews and the decision taken and actions planned need to be approved by the top 10 ____________.
Answer Selected Answer: Correct Answer: Evaluation Method Exact Match Correct Answer Management Case Sensitivity management