Name of work

Meeting hall_17.00 lakhs


Date of Measurement Description of work No L

Name of the contractor Agency by which executed Measurements upto date B D

Contents

Set1

Augoring of the 300mm Double under reamed piles to a depth of 3.5m with auger and cutting 2 Nos of bulbs of dia 75cm each with reamer set etc.complete For Gents toilet piles 1 x 4 ------VIP Toilet piles 1 x 4 ------Ladies Toilet piles 1 x 4 -------

----------

4Nos 4Nos 4Nos 12Nos

Augoring of the 375mm Double under reamed piles to a depth of 3.75m with auger and cutting 2 Nos of bulbs of dia 94cm each with reamer set etc.complete For East side portico piles 1 x 4 ------Augoring of the 230mm Single under reamed piles to a depth of 2.50m with auger and cutting 1 Nos of bulbs of dia 35cm each with reamer set etc.complete VIP Toilet dummy piles 1 x 2 ------Ladies Toilet dummy piles 1 x 2 -------

----

4Nos

-------

2Nos 2Nos 4Nos

Pre-Measurement of grills for piles 8 4 8 8 4 8 8 4 8 For 300mm DUR piles main bars---12mm dia Add for laps For stirrups---8mm dia For 375mm DUR piles main bars---12mm dia Add for laps For stirrups---8mm dia For 230mm SUR piles main bars---10mm dia Add for laps For stirrups---8mm dia 12 6 12 4 4 4 4 4 4 x x x x x x x x x 4 2 12 5 1 13 4 1 8 4.45 0.61 0.95 4.85 0.61 1.2 3.1 0.45 0.95 ------------------------------------------------------213.60m 7.32m 136.80m 97.00m 2.44m 62.40m 49.60m 1.80m 30.40m

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH For septic tank 0.785 x 2 0.90 0.90

2.72

3.46Cum 3.46Cum

Cost and supply of 900mm dia RCC rings including transportation to site for septic tank For septic tank 1 x 2 2.74 Set2

----

----

5.48rm

RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges finished item of work for 375mm DUR Piles For East for side portico piles 1 for a x depth 4 of 3.75m ------RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for 300mm DUR Piles for a depth of 3.50m For Gents toilet piles 1 x 4 ------VIP Toilet piles 1 x 4 ------Ladies Toilet piles 1 x 4 -------

----

4Nos

----------

4Nos 4Nos 4Nos 12Nos

RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for 230mm SUR Piles for a depth of 2.50m VIP Toilet dummy piles 1 x 2 ------Ladies Toilet dummy piles 1 x 2 -------

-------

2Nos 2Nos 4Nos

Pre-Measurement of grills for columns and plinth beams Gents toilet Main bars---Columns ---12mm dia 4 x

4.55

----

----

72.80m

Ties---Column---8mm dia 4 Longitudinal plinth Main bars ---12mm dia 2 ----do--- crank----12mm dia 2 ---do--- stirrups---8mm dia 2 Transverse plinth Main bars ---12mm dia 2 ----do--- crank----12mm dia 2 ---do--- stirrups---8mm dia 2 VIP toilet Main bars---Columns ---16mm dia 4 Ties---Column---8mm dia 4 Tranverse plinth Main bars ---12mm dia 2 ----do--- crank----12mm dia 2 ---do--- stirrups---8mm dia 2 Lonitudinal plinth Main bars ---12mm dia 2 ---do--- stirrups---8mm dia 2 Ladies toilet Main bars---Columns ---16mm dia 4 Ties---Column---8mm dia 4 Tranverse plinth Main bars ---12mm dia 2 ----do--- crank----12mm dia 2 ---do--- stirrups---8mm dia 2 Lonitudinal plinth Main bars ---12mm dia 2 ---do--- stirrups---8mm dia 2 East side portico Main bars---Columns ---12mm dia 4 ---do--- 16mm dia 4 Ties---Column---8mm dia 4 Longitudinal plinth Main bars ---12mm dia 1 ----do--- crank----12mm dia 1 ---do--- stirrups---8mm dia 1 Transverse plinth Main bars ---12mm dia 2 ----do--- crank----12mm dia 2 ---do--- stirrups---8mm dia 2 For Main bars for RCC plate over septic tank ---10mm 2 dia ----do---- 10mm dia 2 ----do---- 10mm dia 2 ----do---- 10mm dia 2 ----do---- 10mm dia 2 ----do---- 10mm dia 2 ----do---- 10mm dia 2

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

14 4 1 20 4 1 20 4 14 4 1 20 4 26 4 14 4 1 20 4 26 3 3 18 4 1 40 4 1 39 1 2 2 2 2 2 2

1.1 3.3 3.6 1.21 3.25 3.55 1.21 4.55 1.1 3.25 3.55 1.21 4.2 1.21 4.55 1.1 3.25 3.55 1.21 4.2 1.21 5.05 5.05 1.1 6.5 7 1.5 6.1 6.6 1.5 2.65 2.35 2.1 1.9 1.45 0.9 0.45

----------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------

61.60m 26.40m 7.20m 48.40m 26.00m 7.10m 48.40m 72.80m 61.60m 26.00m 7.10m 48.40m 33.60m 62.92m 72.80m 61.60m 26.00m 7.10m 48.40m 33.60m 62.92m 60.60m 60.60m 79.20m 26.00m 7.00m 60.00m 48.80m 13.20m 117.00m 5.30m 9.40m 8.40m 7.60m 5.80m 3.60m 1.80m

Set3

Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of cement, (SS5) metal complete for finished item of work for Columns (APSS No. 402) (CSSR) 0.23 Gents toilet 1 x 4 0.30 Ladies toilet 1 x 4 0.30 VIP TOILET 1 x 4 0.30 ZP PORTICO 0.785 x 4

20mm size HBG 0.23 0.23 0.23 0.30 3.25 3.25 3.20 3.50 0.69Cum 0.90Cum 0.88Cum 0.99Cum 3.46Cum

Reinforced Cement Concrete M20 grade nominal mix using 400 kg. of cement, 20mm size HBG (SS5) metal complete for finished item of work for Columns (APSS No. 402) (CSSR) 0.90 0.05 Plates over septic tank 2 x 0.785 0.90

0.06Cum 0.06Cum

Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of cement, 20mm size HBG (SS5) metal complete for finished item of work for Plinth beams (APSS No. 402) (CSSR) 12.58 0.30 Gents toilet---Plinth beam A/R 1 x 1 0.23 0.23 0.30 Deduct columns 1 x 4 0.23 14.38 0.30 VIP toilet---Plinth beam A/R 1 x 1 0.23 0.30 0.30 Deduct columns 1 x 4 0.23 14.38 0.30 Ladies toilet---Plinth beam A/R 1 x 1 0.23 0.30 0.30 Deduct columns 1 x 4 0.23 0.45 East side portico---Plinth beam 3 sides 1 x 1 37.28 0.23 0.30 0.45 Deduct columns 1 x 4 0.23

0.87Cum -0.06Cum 0.99Cum -0.08Cum 0.99Cum -0.08Cum 3.86Cum -0.12Cum 6.37Cum

Brick Masonry in with traditional bricks 23x11x7cms in CM (1:6) prop: mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).(CSSR) for basement Gents toilet Toilet block A/R 1 x 1 12.56 0.23 Deduct columns 1 x 4 0.23 0.23 VIP Toilet Toilet block A/R 1 x 1 14.38 0.23 Deduct columns 1 x 4 0.30 0.23 Ladies toilet Toilet block A/R 1 x 1 14.38 0.23 Deduct columns 1 x 4 0.30 0.23 Inside meeting hall:-

0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5

1.44Cum -0.11Cum 1.65Cum -0.14Cum 1.65Cum -0.14Cum

Inside meeting hall for step-I 3sides ---do--- for step-II ---do--- for step-III ---do--- for step-IV Add for step-I ---do--- for step-II ---do--- for step-III Inside meeting hall for step-V 3sides Wall at steps Step-I Step-II Step-III

1 1 1 1 1 1 1 1 1 1 1 1

x x x x x x x x x x x x

1 1 1 1 2 2 2 1 2 1 1 1

15.24 15.24 15.24 16.37 0.90 0.90 0.90 20.50 3.45 0.90 0.90 0.90

0.23 0.23 0.23 0.23 0.30 0.30 0.30 0.23 0.23 0.90 0.60 0.30

0.1 0.2 0.3 0.4 0.1 0.2 0.3 0.5 0.5 0.125 0.125 0.125

0.35Cum 0.70Cum 1.05Cum 1.51Cum 0.05Cum 0.11Cum 0.16Cum 2.36Cum 0.79Cum 0.10Cum 0.07Cum 0.03Cum 11.63Cum

Filling with sand in foundations including watering and ramming including cost and conveyance of all materials and all labour charges etc.complete in foundations Toilet block for gents 1 x 1 2.89 2.94 0.70 VIP Toilet 1 x 1 2.89 3.84 0.70 Toilet block for ladies 1 x 1 2.89 3.84 0.70 For E/side Portico 1 x 1 6.14 5.34 0.35 Inside meeting hall:Step-II 1 x 1 12.44 1.17 0.10 Step-III 1 x 1 12.44 1.17 0.20 Step-IV 1 x 1 12.44 2.02 0.30 Deduct steps 1 x 2 0.90 0.90 0.30 Step-V 1 x 1 12.44 3.82 0.40 Deduct steps 1 x 1 3.86 1.53 0.40 ---do-1 x 1 1.36 0.67 0.40

5.95Cum 7.77Cum 7.77Cum 11.48Cum 1.46Cum 2.91Cum 7.54Cum -0.49Cum 19.01Cum -2.36Cum -0.36Cum 60.68Cum

Set4

Plain Cement Concrete (1:4:8) prop using 40mm size HBG (SS5) metal for finished item of work for Foundations and Flooring Bed (APSS No. 402)(RSSR) 2.94 2.89 Gents toilet 1 x 1 3.84 2.89 Ladies toilet 1 x 1 3.84 2.89 VIP TOILET 1 x 1 ZP PORTICO 6.14 5.34 1 x 1 Inside meeting hall:Step-II 1 x 1 12.44 1.17 Step-III 1 x 1 12.44 1.17 Step-IV 1 x 1 12.44 2.02 Deduct steps 1 x 2 0.90 0.90 Step-V 1 x 1 12.44 3.82 Deduct steps 1 x 1 3.86 1.53 ---do-1 x 1 1.36 0.67

0.10 0.10 0.10 0.10 0.10 0.20 0.30 0.30 0.40 0.40 0.40

0.85Cum 1.11Cum 1.11Cum 3.28Cum 1.46Cum 2.91Cum 7.54Cum -0.49Cum 19.01Cum -2.36Cum -0.36Cum 34.06Cum

Pre-Measurement of grills for Roof beams&slab:ZP PORTICO Short beam Main bars at top---16mm dia 2 ---do---Main bars at bottom---20mm dia 2 Add for lap--16mm 1 Add for lap--20mm 2 Stirrups---8mm dia 2 Long beam Main bars at top---16mm dia 2 ---do---Main bars at bottom---20mm dia 2 Crank ---16mm dia 2 Add for lap--20mm 1 Stirrups---8mm dia 2 Slab main---8mm dia 1 ---do--- cranks 1 Top extras 1 ----do--1 ----do--1 Top support bars---8mm dia 1 ----do--1 ----do--1 ----do--1 Dist.bars---8mm dia 1 ----do--1 Top extras 1 ----do--1 Top support bars---8mm dia 1 Gents toilet All beam Main bars ---12mm dia 4 ---do---Crank---12mm dia 4 Stirrups---8mm dia 4 Slab main---8mm dia 1 ---do--- cranks 1 Top extras 1 ----do--1

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

2 3 1 1 33 2 4 1 1 42 16 17 17 17 17 6 6 6 6 16 17 12 12 16 4 1 15 8 8 5 5

5.72 5.72 0.82 1.02 1.25 6.6 6.6 6.9 1.02 1.4 7.1 8.3 1.2 1.53 1.2 2.45 2.4 2.4 2.4 6.6 5.72 1.4 1.55 5.75 3.3 3.6 1.1 3.73 4 1.1 1.1

----------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------

22.88m 34.32m 0.82m 2.04m 82.50m 26.40m 52.80m 13.80m 1.02m 117.60m 113.60m 141.10m 20.40m 26.01m 20.40m 14.70m 14.40m 14.40m 14.40m 105.60m 97.24m 16.80m 18.60m 92.00m 52.80m 14.40m 66.00m 29.84m 32.00m 5.50m 5.50m

Top support bars---8mm dia Dist.bars---8mm dia ----do---cranks Top extras ----do--Top support bars---8mm dia Ladies toilet Long beam Main bars ---16mm dia ---do---Crank---12mm dia Stirrups---8mm dia Short beam Main bars ---12mm dia ---do---Crank---12mm dia Stirrups---8mm dia Slab main---8mm dia ---do--- cranks Top extras ----do--Top support bars---8mm dia Dist.bars---8mm dia ----do---cranks Top extras ----do--Top support bars---8mm dia VIP toilet Long beam Main bars ---16mm dia ---do---Crank---12mm dia Stirrups---8mm dia Short beam Main bars ---12mm dia ---do---Crank---12mm dia Stirrups---8mm dia Slab main---8mm dia ---do--- cranks Top extras ----do--Top support bars---8mm dia Dist.bars---8mm dia ----do---cranks Top extras ----do--Top support bars---8mm dia

1 1 1 1 1 1 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

8 8 9 9 9 8 4 1 23 4 1 15 9 9 6 6 8 13 13 13 13 8 4 1 23 4 1 15 9 9 6 6 8 13 13 13 13 8

3.73 3.55 3.6 1.07 1.07 2.3 4.25 4.6 1.1 3.26 3.6 1.1 4.45 4.65 1.4 1.4 4.6 3.5 3.6 1.2 1.2 2.3 4.25 4.6 1.1 3.26 3.6 1.1 4.45 4.65 1.4 1.4 4.6 3.5 3.6 1.2 1.2 2.3

-------------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------

29.84m 28.40m 32.40m 9.63m 9.63m 18.40m 34.00m 9.20m 50.60m 26.08m 7.20m 33.00m 40.05m 41.85m 8.40m 8.40m 36.80m 45.50m 46.80m 15.60m 15.60m 18.40m 34.00m 9.20m 50.60m 26.08m 7.20m 33.00m 40.05m 41.85m 8.40m 8.40m 36.80m 45.50m 46.80m 15.60m 15.60m 18.40m

Set5

Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of cement, 20mm size HBG (SS5) metal complete for finished item of work for roof beams (APSS No. 402) (CSSR) Gents toilet block A/R 1 x 1 12.56 0.23 0.30 VIP Toilet 1 x 1 14.38 0.23 0.30 Toilet block for ladies 1 x 1 14.38 0.23 0.30 For E/side Portico:Long beams 1 x 2 6.60 0.30 0.40 Cross beams 1 x 3 5.10 0.30 0.30

0.87Cum 0.99Cum 0.99Cum 1.58Cum 1.38Cum 5.81Cum

VRCC M20 grade nominal mix using 400 kgs of cement and 20mm HBG chips from approved quarry including cost and conveyance of all materials like cement,fine aggregate(Sand),coarse aggregate,water etc and all other taxes on materials and labour charges for steel centring,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.complete but excluding cost and fabrication charges of steel for finished item of work (APSS No.402&403) for Roof slab of 115mm thick For gents toilet block VIP Toilet For ladies toilet block E/side Portico 1 1 1 1 x x x x 1 1 1 1 3.60 3.65 3.70 7.20 3.80 4.65 4.65 5.80 --------13.68Sqm 16.97Sqm 17.21Sqm 41.76Sqm 89.62Sqm

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work For gents toilet block VIP Toilet For ladies toilet block E/side Portico 1 1 1 1 x x x x 1 1 1 1 3.60 3.65 3.70 7.20 3.80 4.65 4.65 5.80 --------13.68Sqm 16.97Sqm 17.21Sqm 41.76Sqm 89.62Sqm

Brick Masonry in with traditional bricks 23x11x7cms in CM (1:6) prop: mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).(CSSR) for super structure Gents toilet Toilet block A/R 1 x 1 12.56 0.23 2.75 Deduct columns 1 x 4 0.23 0.23 2.75 Deduct door 1 x 1 1.05 0.23 2.1

7.94Cum -0.58Cum -0.51Cum

Deduct RCC Jollies ----do--VIP Toilet Toilet block A/R Deduct columns Deduct door Deduct RCC Jollies ----do--Ladies toilet Toilet block A/R Deduct columns Deduct door Deduct RCC Jollies ----do---

1 1 1 1 1 1 1 1 1 1 1 1

x x x x x x x x x x x x 1 4 1

2 2 14.38 0.30 1.05 2 2 1 4 1 2 2 14.38 0.30 1.05

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.45 0.45 2.75 2.75 2.1 0.45 0.45 2.75 2.75 2.1 0.45 0.45

0.00Cum 0.00Cum 9.10Cum -0.76Cum -0.51Cum 0.00Cum 0.00Cum 9.10Cum -0.76Cum -0.51Cum 0.00Cum 0.00Cum 22.51Cum

Cost and supply of 40mm thick RCC Jollies including transportation to site and fixing etc.complete Gents toilet Over Long walls 1 x 2 --Over Short walls 1 x 2 --VIP Toilet Over Long walls 1 x 2 --Over Short walls 1 x 2 --Ladies toilet Over Long walls 1 x 2 --Over Short walls 1 x 2 ---

0.45 0.45 0.45 0.45 0.45 0.45

0.00Sqm 0.00Sqm 0.00Sqm 0.00Sqm 0.00Sqm 0.00Sqm

Rienforced Cement Concrete (1:4:8) prop using 40mm size HBG (SS5) metal for finished item of work for dummy columns (APSS No. 402)(RSSR) Over portico 0.785 x 4 0.30 0.30 0.60 Over Gents toilet 1 x 4 0.23 0.230 0.600 Over VIP toilet 1 x 4 0.23 0.300 0.600 Over LADIES toilet 1 x 4 0.23 0.300 0.600

0.22Cum 0.13Cum 0.17Cum 0.17Cum 0.69Cum

Set6

Ornamental Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and all labour charges etc.complete For gents toilet block ceiling 1 x 1 3.22 ----do---Projection A/R 1 x 1 14.80 1 x 1 VIP Toilet ceiling 3.27 ----do---Projection A/R 1 x 1 16.60 For ladies toilet block ceiling 1 x 1 3.32 ----do---Projection A/R 1 x 1 16.70 E/side Portico ceiling 1 x 1 7.20 Columns:Columns for portico 1 x 4 0.94

3.42 0.15 4.27 0.15 4.27 0.15 5.80 ---

----------------------------3.50

11.01 2.22 13.96 2.49 14.18 2.51 41.76 13.19 101.32sqm

Manufacture,supply and fixing of table of size 1.52mx0.50mx0.76m size using pre-laminated MDF board of thickness 18mm as top plank,two Nos of pre-laminated MDF boards of 18mm thick as side and front supports,supported on MS frame made with 18 gauge 25mm size square tube and 25x50mm rectangular tube and corners are rounded finished with DUCO lacquer putty and painted with laquer primer including cost of all materials like boards,MS frame and all fixtures and all labour charges and hire charges of machinery etc.complete. Inside meeting hall 1 x 26 ---------26Nos

Manufacture,supply and fixing of table of size 2.25mx0.50mx0.76m size using pre-laminated MDF board of thickness 18mm as top plank,two Nos of pre-laminated MDF boards of 18mm thick as side and front supports,supported on MS frame made with 18 gauge 25mm size square tube and 25x50mm rectangular tube and corners are rounded finished with DUCO lacquer putty and painted with laquer primer including cost of all materials like boards,MS frame and all fixtures and all labour charges and hire charges of machinery etc.complete. Inside meeting hall 1 x 14 ---------14Nos

Manufacture,supply and fixing of table of size 2.72mx0.50mx0.76m size using pre-laminated MDF board of thickness 18mm as top plank,two Nos of pre-laminated MDF boards of 18mm thick as side and front supports,supported on MS frame made with 18 gauge 25mm size square tube and 25x50mm rectangular tube and corners are rounded finished with DUCO lacquer putty and painted with laquer primer including cost of all materials like boards,MS frame and all fixtures and all labour charges and hire charges of machinery etc.complete. Inside meeting hall 1 x 12 ---------12Nos