Professional Documents
Culture Documents
Table of Contents
Table of Contents
Chapter 2 Site Maintenance ......................................................................................................... 2-1 2.1 Overview ............................................................................................................................ 2-1 2.2 Site Administrationship ...................................................................................................... 2-1 2.3 Start Site Operation ........................................................................................................... 2-3 2.4 View Resource................................................................................................................... 2-4 2.5 Force Load SW .................................................................................................................. 2-5 2.6 SW Activate ....................................................................................................................... 2-6 2.7 Site Hierarchical Reset ...................................................................................................... 2-8 2.8 Site Test............................................................................................................................. 2-9 2.9 Site Environment Monitoring............................................................................................ 2-10
BSC and the local BTS terminal. Therefore, site administrationship will be granted to one side at a time. When a site is installed and begins to run, BSC has the site administrationship by default. Therefore the maintenance personnel need to obtain site administrationship before performing any operation at a BTS terminal. When the operation is over, please release the site administrationship.
II. Access
Activate BTS terminal maintenance console, and select [Site/Site
Administrationship]. Click <Obtain> or <Release> in the popped up dialogue box to obtain or release site administrationship, and the operational result will be displayed in this box, as shown in Figure 2-2.
When the operation is over, the administrationship must be released. Otherwise, maintenance personnel will be blocked from performing remote maintenance. The interface of releasing the administrationship is shown in Figure 2-3.
II. Access
Activate BTS terminal maintenance console, and select [Site/Site OpStart]. Click <OK> in the popped up message box [Start Site Operation]. The result of the operation will be displayed in the status bar, as shown in Figure 2-4.
II. Access
Activate BTS terminal maintenance console, and select [Site/View Resource], and the resource utilization status of the TRX and the TMU of the site will be displayed in the popped-up window. Select in [Resource Type] to determine the type of resource whose utilization status is to be viewed. As is shown in Figure 2-5, Figure 2-6.
II. Access
Activate BTS terminal maintenance console, select [Site/Forced Load SW], and the dialogue box [SW Download] will pop up. Select in this dialogue box the name of the software and the type of the files to be loaded, and click <Begin>. The progress of software loading will be displayed at the maintenance console, as shown in Figure 2-7. When it is promoted that Software loading successful, click <Close> to complete the forced software loading from the maintenance console to the BTS.
The data for software loading is Send transferred with the window size as one 1~49 Window Size unit Version number of the software to be loaded For which type of board the software upgrading is to be carried out
Version
File ID
2.6 SW Activate
I. Function
After the forced BTS software loading, activate the software. The software upgrading task is not yet completed before the loaded software is activated.
II. Access
Activate BTS terminal maintenance console, select [Site/SW Activate], and the interface [SW Activate] (as shown in Figure 2-8 and Figure 2-9) will pop up. Input the version of the software to be activated, select the corresponding board number and file ID, and click <OK>. If the activation is successful, the prompt SW activation request is confirmed will be displayed.
Board No.
File ID
II. Access
Enter the maintenance console of the BTS, select [Site/Site Reset Hierarchically]. The interface [Site Hierarchical Reset] will pop up. Select the level of the resetting in this interface, and click <OK>, as shown in Figure 2-10.
II. Access
Activate BTS terminal maintenance console, and select [Site/Site Test]. The interface [Site Test] will pop up. Click <Begin>, and the test results will be displayed in this interface, as shown in Figure 2-11.
Caution: In this system, burglary alarm, fire alarm and smoke alarm are all reported as burglary alarm. Therefore, the occurrence of any of them will trigger the burglary alarm.
II. Access
Activate BTS terminal maintenance console, and select [Site/Environment Monitoring Setting]. The interface [Environment Monitoring Setting] will pop up, as shown in Figure 2-12.
Resetting of the environment monitoring instrument is performed when the equipment is in abnormal service. Select Reset in [Select Operation Type]. Click <OK>, then the resetting can be performed and the operational result will be displayed, as shown in Figure 2-13.
When the burglary alarm is confirmed or cleared, please clear the burglary alarm record. Select Clear Burglary alarm in [Select Operation Type]. Click <OK>, and
the burglary alarm record will be cleared, and the operational result will be displayed in the status bar, as shown in Figure 2-14.
Conditions for the generation of environment alarms can be determined by the upper and lower limits for temperature and humidity. Select Set Temperature and Humidity in [Select Operation Type] and set the upper and lower limits for alarm generation in [Temperature and Humidity]. Click <OK>. The operational result is displayed in the status bar, as shown in Figure 2-15.
Figure 2-15 Set upper and lower limits for temperature and humidity
With the implementation of relay operation, maintenance can startup and close some relevant equipment. Select Relay Operation in [Select Operation Type], and set the starting and closing of the relevant relays in Relay Operation. Click <OK> and the operational result will be displayed, as shown in Figure 2-16.
Select Disable the EAC Alarm, and the alarm report will be shut down for 10 minutes. This is performed by the maintenance personnel in equipment maintenance to prevent the mis-generation of false alarms caused by their operations. Select Disable the EAC Alarm in [Select Operation Type], and click <OK>. The operational result will be displayed, as shown in Figure 2-17.