Chapter 2 Site Maintenance ......................................................................................................... 2-1 2.1 Overview ............................................................................................................................ 2-1 2.2 Site Administrationship ...................................................................................................... 2-1 2.3 Start Site Operation ........................................................................................................... 2-3 2.4 View Resource................................................................................................................... 2-4 2.5 Force Load SW .................................................................................................................. 2-5 2.6 SW Activate ....................................................................................................................... 2-6 2.7 Site Hierarchical Reset ...................................................................................................... 2-8 2.8 Site Test............................................................................................................................. 2-9 2.9 Site Environment Monitoring............................................................................................ 2-10

Huawei Technologies Proprietary i

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Chapter 2 Site Maintenance


2.1 Overview
There may be one or more cells at a site. The maintenance of the site involves the maintenance over the entire BTS. Figure 2-1 shows the interface [Site Maintenance Terminal System] in the BTS maintenance console. In the following sections, site maintenance functions are explained in detail.

Figure 2-1 The interface [Site Maintenance Terminal System]

2.2 Site Administrationship


I. Function
Site administrationship is the authority to set the various BTS parameters. BTS parameters can be set either at the BSC or the local BTS maintenance terminal. However, BTS parameter setting cannot be performed at the same time at both the

Huawei Technologies Proprietary 2-1

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

BSC and the local BTS terminal. Therefore, site administrationship will be granted to one side at a time. When a site is installed and begins to run, BSC has the site administrationship by default. Therefore the maintenance personnel need to obtain site administrationship before performing any operation at a BTS terminal. When the operation is over, please release the site administrationship.

II. Access
Activate BTS terminal maintenance console, and select [Site/Site

Administrationship]. Click <Obtain> or <Release> in the popped up dialogue box to obtain or release site administrationship, and the operational result will be displayed in this box, as shown in Figure 2-2.

Figure 2-2 Site administrationship (obtain administrationship)

When the operation is over, the administrationship must be released. Otherwise, maintenance personnel will be blocked from performing remote maintenance. The interface of releasing the administrationship is shown in Figure 2-3.

Huawei Technologies Proprietary 2-2

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Figure 2-3 Release the administrationship

2.3 Start Site Operation


I. Function
To put the site data set in BTS operation and maintenance unit into effect and start the service of the site.

II. Access
Activate BTS terminal maintenance console, and select [Site/Site OpStart]. Click <OK> in the popped up message box [Start Site Operation]. The result of the operation will be displayed in the status bar, as shown in Figure 2-4.

Figure 2-4 Start Site Operation

Huawei Technologies Proprietary 2-3

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

2.4 View Resource


I. Function
The maintenance personnel can view the status of resource utilization in the terminal maintenance system of the BTS, specifically, the utilization ratio of the CPU and the RAM of TMU and TRX.

II. Access
Activate BTS terminal maintenance console, and select [Site/View Resource], and the resource utilization status of the TRX and the TMU of the site will be displayed in the popped-up window. Select in [Resource Type] to determine the type of resource whose utilization status is to be viewed. As is shown in Figure 2-5, Figure 2-6.

Figure 2-5 View the status of resource

Huawei Technologies Proprietary 2-4

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Figure 2-6 View CPU status

2.5 Force Load SW


I. Function
The BTS software can be upgraded from both the local and the remote terminal. Software upgrading for TMU, TRX and PBU can therefore be easily achieved.

II. Access
Activate BTS terminal maintenance console, select [Site/Forced Load SW], and the dialogue box [SW Download] will pop up. Select in this dialogue box the name of the software and the type of the files to be loaded, and click <Begin>. The progress of software loading will be displayed at the maintenance console, as shown in Figure 2-7. When it is promoted that Software loading successful, click <Close> to complete the forced software loading from the maintenance console to the BTS.

Huawei Technologies Proprietary 2-5

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Figure 2-7 The Dialogue Box [SW Download]

III. Interface description


For the description of the interface in Figure 2-7, please see Table 2-1 below. Table 2-1 [SW Download] Field File Name Description The name of the file saved on the maintenance console that is to be loaded 49 Must be the same as the version number specified in the file to be loaded, otherwise the loading will fail. Must be the same as the type of the file to be loaded. Value range Recommended value

The data for software loading is Send transferred with the window size as one 1~49 Window Size unit Version number of the software to be loaded For which type of board the software upgrading is to be carried out

Version

File ID

2.6 SW Activate
I. Function
After the forced BTS software loading, activate the software. The software upgrading task is not yet completed before the loaded software is activated.

Huawei Technologies Proprietary 2-6

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

II. Access
Activate BTS terminal maintenance console, select [Site/SW Activate], and the interface [SW Activate] (as shown in Figure 2-8 and Figure 2-9) will pop up. Input the version of the software to be activated, select the corresponding board number and file ID, and click <OK>. If the activation is successful, the prompt SW activation request is confirmed will be displayed.

Figure 2-8 Activating the TMU board software

Figure 2-9 Activating the TRX board software

Huawei Technologies Proprietary 2-7

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

III. Interface description


For the description of the software activation interface, see Table 2-2. Table 2-2 The Interface [SW Activate] Field Version Meaning Version number of the loaded software Format: 0, 1, 0-X, Number of the specified etc. (X being the board that is to be number of the TRXs activated configured) Type of board for which the software upgrading is to be carried out Value range Recommended value Must be the same as the version number of the software to be loaded, otherwise the activation will fail.

Board No.

File ID

2.7 Site Hierarchical Reset


I. Function
Site resetting is performed as a remedy when a site is abnormal. Resetting a site will stop the services of the cells for several minutes under this site. Therefore, care should be taken with this function.

II. Access
Enter the maintenance console of the BTS, select [Site/Site Reset Hierarchically]. The interface [Site Hierarchical Reset] will pop up. Select the level of the resetting in this interface, and click <OK>, as shown in Figure 2-10.

Huawei Technologies Proprietary 2-8

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Figure 2-10 The 'Site Hierarchical Reset' interface

III. Interface description


For description of the interface [Site Hierarchical Reset], see Table 2-3. Table 2-3 Site resetting levels Reset level First Level Reset Meaning Currently not supported by the BTSs. Please see the definition of this level of resetting on the interface. Currently not supported by the BTSs. Please see the definition of this level of resetting on the interface. Please see the definition of this level of resetting on the interface. Third Level Reset In this level of resetting, the base station applies to BSC side for the re-sending of data configuration. Please see the definition of this level of resetting on the interface. In this level of resetting, base station TMU hardware resetting is performed, and the base station re-applies for BSC data configuration.

Second Level Reset

Fourth Level Reset

2.8 Site Test


I. Function
To test the functional boards configured for the site, and return the test results.

Huawei Technologies Proprietary 2-9

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

II. Access
Activate BTS terminal maintenance console, and select [Site/Site Test]. The interface [Site Test] will pop up. Click <Begin>, and the test results will be displayed in this interface, as shown in Figure 2-11.

Figure 2-11 Site test results

2.9 Site Environment Monitoring


I. Function
To implement operations on the environment monitoring box such as resetting the environment monitoring box, clearing the burglary alarm, setting the upper and lower limits for humidity and temperature alarms, relay operation and disable the EAC alarm.

Caution: In this system, burglary alarm, fire alarm and smoke alarm are all reported as burglary alarm. Therefore, the occurrence of any of them will trigger the burglary alarm.

II. Access
Activate BTS terminal maintenance console, and select [Site/Environment Monitoring Setting]. The interface [Environment Monitoring Setting] will pop up, as shown in Figure 2-12.

Huawei Technologies Proprietary 2-10

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

Figure 2-12 Environment monitoring setup

Resetting of the environment monitoring instrument is performed when the equipment is in abnormal service. Select Reset in [Select Operation Type]. Click <OK>, then the resetting can be performed and the operational result will be displayed, as shown in Figure 2-13.

Figure 2-13 Resetting operation

When the burglary alarm is confirmed or cleared, please clear the burglary alarm record. Select Clear Burglary alarm in [Select Operation Type]. Click <OK>, and

Huawei Technologies Proprietary 2-11

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

the burglary alarm record will be cleared, and the operational result will be displayed in the status bar, as shown in Figure 2-14.

Figure 2-14 Clear burglary alarm

Conditions for the generation of environment alarms can be determined by the upper and lower limits for temperature and humidity. Select Set Temperature and Humidity in [Select Operation Type] and set the upper and lower limits for alarm generation in [Temperature and Humidity]. Click <OK>. The operational result is displayed in the status bar, as shown in Figure 2-15.

Figure 2-15 Set upper and lower limits for temperature and humidity

Huawei Technologies Proprietary 2-12

User Manual M900/M1800 Base Transceiver Station (BTS30)

Chapter 2 Site Maintenance

With the implementation of relay operation, maintenance can startup and close some relevant equipment. Select Relay Operation in [Select Operation Type], and set the starting and closing of the relevant relays in Relay Operation. Click <OK> and the operational result will be displayed, as shown in Figure 2-16.

Figure 2-16 Relay operation

Select Disable the EAC Alarm, and the alarm report will be shut down for 10 minutes. This is performed by the maintenance personnel in equipment maintenance to prevent the mis-generation of false alarms caused by their operations. Select Disable the EAC Alarm in [Select Operation Type], and click <OK>. The operational result will be displayed, as shown in Figure 2-17.

Figure 2-17 Disable the EAC alarm

Huawei Technologies Proprietary 2-13