Engineered cementing solutions for complex environments
Todays complex drilling environ-
ment is deeper, hotter, and more prone to formation pressure uncertainties than ever before. Drilling contingenciessuch as loss or high-pressure zonesmay result in setting casing higher than planned and eventually using all casing sizes before the target depth is reached. Solid expand- able tubulars (SETs), a proven alternative in this environment, can reach TDs with large, accept- able openhole sizes. Successfully cementing an SET requires an appropriate cement slurry system. Schlumberger offers a wide portfolio of slur- ries that meet the stringent criteria and have been used by operators around the world. The Schlumberger has successfully cemented SET in locations around the world. Schlumberger design process includes thorough slurry testing during the design phase and recommendations for proper hole cleaning and conditioning of drilling fluids. These measures are essential to prepare the zone for cementing. ENGINEERED CEMENT SYSTEMS After extensive laboratory testing and successful field applications of SET cementing, recommended robust cement systems include
UNIFLAC* slurry systems
GASBLOK* family of slurries for gas migration control.
For all systems, the transition time from 50- to 500-psi [0.34- to 3.44-MPa] CS is short, yet not compromised by the long TT for the slurries. Schlumberger has performed successful cementing of SET world- wide using GASBLOK and UNIFLAC slurries. Additionally, these systems exhibit zero free water and low fluid loss values (<50 mL/30 min). In areas where cement flexibility is a special concern, FlexSTONE* flexible cement systemswhich maintain cement sheath integrity in a dynamic stress environmentare used. APPLICATIONS
Setting casing
Complex drilling environments,
including deep, high-tempera- ture, or high-pressure wells BENEFITS
Less use of several casing
sizes, saving time and money FEATURES
Slurry density range of 10 to 20
lbm/galUS [1,200 to 2,400 kg/m 3 ]
Temperatures up to 392 degF
[200 degC]
Static gel strength (SGS) less
than 200 lbf/100 ft 2 [95.76 Pa]
Free fluid value of 0 mL
API fluid loss less than
50 mL/30 min
Applicability for a wide range
of cement densities
Very low gel strength for the
job duration, ensuring least resistance to expansion
Quick compressive strength
(CS) development once the system starts to set
Thickening time (TT) designed
for flexibility Solid Expandable Tubulars *Mark of Schlumberger Other company, product, and service names are the properties of their respective owners. Copyright 2010 Schlumberger. All rights reserved. 10-CE-0015 www.slb.com/cementing Solid Expandable Tubulars CEMENT SYSTEM REQUIREMENTS It is important for an SET cementing system to have a TT that allows slurry placement and SET expansion. A hesitation technique is used for TT measurements. The technique replicates both dynamic and static condi- tions in which the cement is either moving while expansion is taking place or is static when a pipe is being disconnected. Equally important is to keep SGS at less than 200 lbf/100 ft 2 [95.76 Pa]as recommended by the SET manufac- turerfor the entire duration of the job, including slurry placement and SET expansion. If the SGS becomes too high, there may be problems during extrusion because of too much resistance behind the pipe. The cement will be too viscous, resulting in either a stuck expansion cone, a fractured formation, or both. Additionally, while the SET is expanding, the expanded end of the casing is repeatedly exposed to pressure fluctuations. There is a greater chance of a microannulus if gel strength development is not controlled. Having successfully applied this process many times in the field, Schlumberger has proven that SET cementing can be as effective as conventional cementing. 1,600 1,400 1,200 1,000 800 600 400 200 0 CS, psi, and SGS, lbm/100 ft 2 Consistency, Bc SGS 200500 lbm/100 ft 2 9 min CS 50500 psi 46 min 100 90 80 70 60 50 40 30 20 10 0 0:00 2:24 4:48 7:12 9:36 12:00 14:24 16:48 19:12 21:36 TT with hesitation CS SGS Time, h:min Looking at pump time evaluation and SGS measurements shows cement slurry systems to have a long TT and very low SGS values for the job duration.
Knowledge of In-Situ Horizontal Stress Orientation For Suitable Direction of Drilling The Inclined and Horizontal Well For Well Placement and Well Completion
IADC/SPE 87122 Successful Horizontal Drilling in Western Siberia: Use of Appropriate, Cost-Effective Technology Solutions To Increase Well Productivity