I love formulas for mathematical calculations.

Because a formula helps me getting the result quicker and it


specifically mentions what all data I need to collect to find result of the desired thing.

In garment manufacturing, industrial engineers, production managers and planners measure factory performance
on daily basis. Performances are measured using standard formulas. I guess you are already using such formulas
for calculating performance.

Don't you think, it would be a good idea to have a poster of commonly used formulas in your work space? A poster
is very useful tool for many reasons. I have made one poster for you and sharing it with you.

Following are the common formulas those are used by garment industry professionals.

Formula#1:
Daily Line Target = (Total working minutes in a day X No. of operators in a line X Line eff%)/Garment SAM

Formula#2:
Individual operator target = (Total working minutes in a day X line efficiency %)/Operation SAM

Formula#3:
Individual operator Efficiency% = (units produced X operation SAM X 100)/Total minutes worked

While you are developing skill matrix for sewing operators, you need measure individual performance. Secondly, if
you plan to start performance based incentive scheme for individual operator, measuring individual operator
efficiency is essential.

Formula#4:
Line Efficiency% = (Line output X garment SAM X 100)/(Number of operators X minute worked in day)

Note: include helpers and worker doing manual operations in case you have included SAM of those operations.

Formula#5:
Machine Productivity: Line output / No. of machine used

Machine productivity is measured in production per machine per shift day.

Formula#6:
Labor Productivity = Line output / No. of total manpower (operators +helpers)

Formula#7:
Line WIP (work in process) = Total pieces lie on the line for a particular order line
WIP of the line of an order is equal to Total pieces loaded till date minus Total piece out till date.

Formula#8:
Standard Time = (Observed time X observed rating) + Allowances

Allowances Relaxation allowance, contingency allowance

Formula#9:
Machine utilization% = (Actual Machine running Time X 100) / Time available

Formula#10:
Cost per minute = Total cost incurred in labor / Total available working minute in a day X no. of labors

Formula#11:
Production Cost pet unit = Total cost incurred in production in a day/ no. of garment produced in a day

Formula#12:
Man to Machine ratio = Total manpower of the factory / Total no. of sewing machines (utilized)