GOVERNMENT OF ANDHRA PRADESH

ROADS AND BUILDINGS DEPARTMENT


QUALITY CONTROL SUB - DIVISION, KADAPA
1.0
1.1

Name of Work

1.1.2 Estimate Rs

: 14.00

Lakhs

TS No. :

1.1.3 WE/RE Rs.

: 13.75

Lakhs

Authority:

1.1.4 Value of work done so far Rs

: 12.87

Lakhs

1.2.1 Name of the contractor

: Sri J Chalama Reddy, Gorludivedu

1.2.2 C R Agt. No

1.2.3 Agreement contract value

: Rs 9 62 204/-

1.2.4 D H S :

: 5.10.2009

1.3.1 Recovery proposed in previous


Q C R's
1.3.2 Recovery proposed in present
QCR

: This is the first inspection

1.3.3 Date of Previous Inspection

1.3.4 Date of Present Inspection

: 2.4.2011

1.3.5 This QC Report consists of

C .R.No. 7/2009

SE(R&B) Kada

111/2009-10
TP:

21.99% Less

DFC:

4.1.2010

EOT : Perticula
not furnished

Rs 27 675/This is the first inspection

No. of pages

To
The Executive Engineer,
(R&B) Division, Rajampet
Copy
Copy
Copy
Copy

submitted to the Superintending Engineer(R&B), I & Q C Circle, Kadapa


submitted to the Superintending Engineer(R&B) Circle, Kadapa
Submitted to the Executive Engineer(R&B) QC Division, Kadapa.
to the Deputy Executive Engineer(R&B) Sub Division, Rayachoty

C .R.No. 7/2009-10
SE(R&B) Kadapa

du

21.99% Less
4.1.2010
EOT : Perticulars
not furnished

2.0 Estimate Provisions and Stage of Works

Name of the work :

0
Thick in C W W in Specific
mm
m
ation

Sl. No.

Description of items

Providing GSB

150

7.3

401

km 5/0-10/0

Providing W M M

150

7.3

406

km 5/0-10/0

MSS

20

7.00

512

km 5/0-10/0

Providing BT patch work


using 40mm HBD metal
with bitumen of 80/100
grade

varying

varying

--

km 5/0-10/0

Providing BT patch work


using 10-12mm HBD
metal with bitumen of
80/100 grade

varying

varying

--

km 5/0-10/0

2.1
2.2

Progress of Work since last Q C inspection :


Deviations made if Any :

Stretches

This is the first inspection.

GSB,WMM, MSS are provided fo


varying widths.

Stage of Work
Completed
Completed
Completed

Completed

Completed

s the first inspection.

, MSS are provided for


dths.

6.0 OBSERVATIONS
Name of the Work :

Sl.No. Location

Type of
Layer

0
CWW
(Mts)

12mm BT Patch work


do
5/4

Observed
Measurements
1.90
2.95
1.55
5.95
1.10
0.60
0.60
0.60
1.90
10.40

x
x
x
x
x
x
x
x
x
x

1.40
1.65
0.90
1.10
0.70
0.50
0.50
0.50
1.30
1.95

4.65
1.15
2.65
1.10
2.45
0.95
2.40
2.85
1.10
2.30
3.15
7.00
7.00

x
x
x
x
x
x
x
x
x
x
x
x
x

1.55
0.90
1.00
1.00
1.10
0.80
5.90
2.30
0.90
1.90
1.65
3.10
1.60

Total

6/2

7/6

8/6

do

1.80
3.70
0.80
1.60
3.90
2.70
6.20
2.30

x
x
x
x
x
x
x
x

1.00
1.90
0.80
2.40
2.20
1.80
5.20
1.10

2.30
2.20
1.65
0.70
2.95
2.75
1.10
2.35
11.40
9.50
12.30

x
x
x
x
x
x
x
x
x
x
x

1.10
2.30
1.35
0.90
1.40
1.60
0.90
2.10
3.50
3.50
7.00

Exe. Area in
sq.m
2.66
4.87
1.40
6.55
0.77
0.30
0.30
0.30
2.47
20.28
39.89
x 0.023
0.92
7.21
1.04
2.65
1.10
2.70
0.76
14.16
6.56
0.99
4.37
5.20
21.70
11.20
79.62
x 0.023
1.83
1.80
7.03
0.64
3.84
8.58
4.86
32.24
2.53
61.52
x 0.023
1.41
2.53
5.06
2.23
0.63
4.13
4.40
0.99
4.94
39.90
33.25
86.10
184.15
x 0.022
4.05

Exe. Area in sq.m


as per MB p 7-19
and 29 3838B

1.162

2.088

1.722

3.955

Total
Deficiency for 8.927 cum is 0.808 cum i.e 9.06%
For 51.209 cum(Total qty. recorded ) the deficiency is
Recovery amount
Deduct TP 21.99% less

4.64 x 3822.8/1 cum

=
=

Double recovery as per circular

Dy.Exe.Engineer(R&B)
QC Sub Division, Kadapa

Short fall
in cum

0.24

0.26

0.31

0.808
4.64 cum
17737.8
-3900.54
13837.3

gineer(R&B)
vision, Kadapa

27675

General Remarks :
1

As on date of inspection the work is completed. The field officers are not informed the progress of work
they are informed only after completion of the work. Hence the field officers are requested to inform the p
work in future stage wise for effective Q C inspections at regular intervals.

The exact location of patch was not recorded in M Book and hence it could not possible to verify the
below top layer.

Depths are not verified to avoid further damages to the road as the patch work is of scattered natu
compared on area basis.

The Patchwork surface finishings is not done as per specification.

B T edges of patch work are disturbed.

The patch work done area at some places disturbed. The field officers are requested to notify the contra
disturbed patch work and see that it should be rectified immidiatly.

High berms are existing near patch work area. Hence The field officers are requested to immidiatly remo
berms to avoid stagnation of water.

The quentity of BT patch work for 40mm could not be assessed as it is covered with 12mm BT patch work

The field officers have executed WMM/12mm patch work and 40mm/12mm patch work. At the time of ins
work is completed, hence the surface areas of patch work done with 12mm is only verified.

10

The Executive Engineer is requested to effect the recovery of Rs.27 675/- from contractor's bills to
quentity in 12mm patch work and intimate the recovry particulars such as MB No. and CB Voucher No. t
in the compliance report.
Note :

The Q C R furnished above are not basis for making payment on the work as it does not purport to be covering all the aspects of
field Engineers are requested to check up the work and see that the work is executed to specified standards and satisfy them
making payment.

The field officers are requested to check the recovery calculations as per agreement conditions before effecting the recovery.

The recovery proposed is as per the E-in - C(R&B) (Admn & Roads) circular Memo No. 12582/vigl/1/2005-1 dated. 17.10.2006. T
Engineer is requested to keeping view regarding recovery to be effected.

The recovery amount proposed in the QCR does not include the item of work for which rectification is required as pointed o
remarks. The Q C R issued based on the observations made on the day of inspection and if any reveling or damages occur
subsequently should be watch carefully and proper action shall be taken for rectification. After rectification only payment shall be
solely based on this report.

The Q C R furnished above are not valid for any evidence in the court of law.

The test results given in the Q C R are valid for the samples extracted at the specified locations and are tested in the Q C laborato

Dy.Exe.Engineer(R&B)
QC Sub Division, Kadapa

progress of work stagewise,


ted to inform the progress of

sible to verify the patch work


of scattered nature. Hence

o notify the contractor of the

o immidiatly remove the high

mm BT patch work.

At the time of inspection the


ed.

ontractor's bills towards less


CB Voucher No. to this ofice

ering all the aspects of the work and


ards and satisfy themselves before

ting the recovery.

1 dated. 17.10.2006. The Executive

required as pointed out in general


ng or damages occurs/taken place
nly payment shall be made, but not

ted in the Q C laboratory only.

n, Kadapa