Professional Documents
Culture Documents
Government of Andhra Pradesh Roads and Buildings Department Quality Control Sub - Division, Kadapa 1.0
Government of Andhra Pradesh Roads and Buildings Department Quality Control Sub - Division, Kadapa 1.0
Name of Work
1.1.2 Estimate Rs
: 14.00
Lakhs
TS No. :
: 13.75
Lakhs
Authority:
: 12.87
Lakhs
1.2.2 C R Agt. No
: Rs 9 62 204/-
1.2.4 D H S :
: 5.10.2009
: 2.4.2011
C .R.No. 7/2009
SE(R&B) Kada
111/2009-10
TP:
21.99% Less
DFC:
4.1.2010
EOT : Perticula
not furnished
No. of pages
To
The Executive Engineer,
(R&B) Division, Rajampet
Copy
Copy
Copy
Copy
C .R.No. 7/2009-10
SE(R&B) Kadapa
du
21.99% Less
4.1.2010
EOT : Perticulars
not furnished
0
Thick in C W W in Specific
mm
m
ation
Sl. No.
Description of items
Providing GSB
150
7.3
401
km 5/0-10/0
Providing W M M
150
7.3
406
km 5/0-10/0
MSS
20
7.00
512
km 5/0-10/0
varying
varying
--
km 5/0-10/0
varying
varying
--
km 5/0-10/0
2.1
2.2
Stretches
Stage of Work
Completed
Completed
Completed
Completed
Completed
6.0 OBSERVATIONS
Name of the Work :
Sl.No. Location
Type of
Layer
0
CWW
(Mts)
Observed
Measurements
1.90
2.95
1.55
5.95
1.10
0.60
0.60
0.60
1.90
10.40
x
x
x
x
x
x
x
x
x
x
1.40
1.65
0.90
1.10
0.70
0.50
0.50
0.50
1.30
1.95
4.65
1.15
2.65
1.10
2.45
0.95
2.40
2.85
1.10
2.30
3.15
7.00
7.00
x
x
x
x
x
x
x
x
x
x
x
x
x
1.55
0.90
1.00
1.00
1.10
0.80
5.90
2.30
0.90
1.90
1.65
3.10
1.60
Total
6/2
7/6
8/6
do
1.80
3.70
0.80
1.60
3.90
2.70
6.20
2.30
x
x
x
x
x
x
x
x
1.00
1.90
0.80
2.40
2.20
1.80
5.20
1.10
2.30
2.20
1.65
0.70
2.95
2.75
1.10
2.35
11.40
9.50
12.30
x
x
x
x
x
x
x
x
x
x
x
1.10
2.30
1.35
0.90
1.40
1.60
0.90
2.10
3.50
3.50
7.00
Exe. Area in
sq.m
2.66
4.87
1.40
6.55
0.77
0.30
0.30
0.30
2.47
20.28
39.89
x 0.023
0.92
7.21
1.04
2.65
1.10
2.70
0.76
14.16
6.56
0.99
4.37
5.20
21.70
11.20
79.62
x 0.023
1.83
1.80
7.03
0.64
3.84
8.58
4.86
32.24
2.53
61.52
x 0.023
1.41
2.53
5.06
2.23
0.63
4.13
4.40
0.99
4.94
39.90
33.25
86.10
184.15
x 0.022
4.05
1.162
2.088
1.722
3.955
Total
Deficiency for 8.927 cum is 0.808 cum i.e 9.06%
For 51.209 cum(Total qty. recorded ) the deficiency is
Recovery amount
Deduct TP 21.99% less
=
=
Dy.Exe.Engineer(R&B)
QC Sub Division, Kadapa
Short fall
in cum
0.24
0.26
0.31
0.808
4.64 cum
17737.8
-3900.54
13837.3
gineer(R&B)
vision, Kadapa
27675
General Remarks :
1
As on date of inspection the work is completed. The field officers are not informed the progress of work
they are informed only after completion of the work. Hence the field officers are requested to inform the p
work in future stage wise for effective Q C inspections at regular intervals.
The exact location of patch was not recorded in M Book and hence it could not possible to verify the
below top layer.
Depths are not verified to avoid further damages to the road as the patch work is of scattered natu
compared on area basis.
The patch work done area at some places disturbed. The field officers are requested to notify the contra
disturbed patch work and see that it should be rectified immidiatly.
High berms are existing near patch work area. Hence The field officers are requested to immidiatly remo
berms to avoid stagnation of water.
The quentity of BT patch work for 40mm could not be assessed as it is covered with 12mm BT patch work
The field officers have executed WMM/12mm patch work and 40mm/12mm patch work. At the time of ins
work is completed, hence the surface areas of patch work done with 12mm is only verified.
10
The Executive Engineer is requested to effect the recovery of Rs.27 675/- from contractor's bills to
quentity in 12mm patch work and intimate the recovry particulars such as MB No. and CB Voucher No. t
in the compliance report.
Note :
The Q C R furnished above are not basis for making payment on the work as it does not purport to be covering all the aspects of
field Engineers are requested to check up the work and see that the work is executed to specified standards and satisfy them
making payment.
The field officers are requested to check the recovery calculations as per agreement conditions before effecting the recovery.
The recovery proposed is as per the E-in - C(R&B) (Admn & Roads) circular Memo No. 12582/vigl/1/2005-1 dated. 17.10.2006. T
Engineer is requested to keeping view regarding recovery to be effected.
The recovery amount proposed in the QCR does not include the item of work for which rectification is required as pointed o
remarks. The Q C R issued based on the observations made on the day of inspection and if any reveling or damages occur
subsequently should be watch carefully and proper action shall be taken for rectification. After rectification only payment shall be
solely based on this report.
The Q C R furnished above are not valid for any evidence in the court of law.
The test results given in the Q C R are valid for the samples extracted at the specified locations and are tested in the Q C laborato
Dy.Exe.Engineer(R&B)
QC Sub Division, Kadapa
mm BT patch work.
n, Kadapa