Name of Work
1.1.2
Estimate Rs
: 10.00
Lakhs
DR No. :
1.1.3
WE/RE Rs.
Lakhs
Authority:
1.1.4
: 7.84
1.2.1
1.2.2
C R Agt. No
: 255/2010-2011
1.2.3
: Rs. 8 32 870/-
1.2.4
DHS:
: 20.1.2011
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
252/2010-11
Lakhs
TP:
12.60% less
DFC:
19.2.2011
To
The Executive Engineer,
(R&B) Division, Rajampeta.
Copy submitted to the Superintending Engineer(R&B), I & Q C Circle, Kadapa
Copy submitted to the Superintending Engineer(R&B) Circle, Kadapa
Copy Submitted to the Executive Engineer(R&B) QC Division, Kadapa.
Copy to the Deputy Executive Engineer(R&B) Sub Division, Rayachoty
52/2010-11
12.60% less
19.2.2011
Sl. No.
Description of items
Forming
embankment
with Side earth
Thick in C W W in Specif
mm
m
cation
305
BT 40 mm patch work
Varying
width
Varying
width
--
WMM
200
4.05
406
SCSD
--
3.75
510
Tackcoat
--
3.75
503
25
3.75
508
2.1
2.2
Stretches
Stage of Work
Completed
Completed
Completed
Completed
Completed
Completed
Completed
5.0
SUMMARY OF Q C TESTS
The field officers shall carry out quality control tests on the materials namely bitumen mineral aggregates
used in BM and SDBC item of work to the frequency stipulated in the table 900-4 of MORTH
Specification.which is in annexure-I.
Further after completion of the work the field officers shall conduct necessary quality control tests on
finished items of works and to ascertain the test results obtained is whether within the acceptance criteria or
not as specified in table 903.4.2 which is as follows.
903.4.2Acceptance Criteria : The acceptance criteria for tests on density and Marshall stability shall be
subject to the condition that the mean value is not less than the specified value plus :
1.65 -
1.65
(No. of samples) 05
The field officers have not furnished Quality Control test reocrds.
As per clause 1.11 of IRC SP-11 Quality Control for construction of roads and runways. Out of
total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by E.E. The test
result record register shall be presented to the QC staff during there inspection. This is not
followed.
ineral aggregates
0-4 of MORTH
control tests on
ptance criteria or
stability shall be
iation
nways. Out of
y E.E. The test
on. This is not
6.0 OBSERVATIONS
Name of the Work :
Sl.No.
Location
Type of
Layer
CWW
(Mts)
L1
Observed Average
Thickness(mm)
C
R2
Km
Average
SDBC
1
35/850
do
3.75
26
25
26
25.67
150
152
151.00
WMM
1
35/850
do
Assist.Exe. Engineer(R&B)
Dy.Exe. Engineer(R&B)
Q C Section, Kadapa
Required
Thickness
Short
fall
25.00
--
150.00
--
Dy.Exe. Engineer(R&B)
Wt.
retained
Cum.wt.
retained
%
retained
% passing
Wt. of sample
Specified
400-11
53 mm
0.00
0.00
0.00
100.00
100
45 mm
865.00
865.00
2.61
97.39
95-100
22.4 mm
6525.00
7390.00
22.26
77.74
60-80
11.2 mm
7214.00
14604.00
44.00
56.00
40-60
4.75mm
6489.00
21093.00
63.54
36.46
25-40
2.36mm
3246.00
24339.00
73.32
26.68
15-30
600 mic
4161.00
28500.00
85.86
14.14
8-22
75 mic
4535.00
33035.00
99.52
0.48
0-8
Pan
159.00
33194.00
100.00
0.00
Remarks
Assist.Exe. Engineer(R&B)
Dy.Exe. Engineer(R&B)
Q C Section, Kadapa
33194.00
Remarks
Annexure-V
FIELD DENSITY TEST FOR S.D.B.C
S.No
Description
6514
5874
640
328
312
Density of sand
1.406
221.91
454
2.05
Remarks
gm/cc
Job mix formula is not furnished during the inspection. Field staff is requested to conduct density test at closure
intervals at the frequency specified by MORT&H 900 clause and ensure the density of S.D.B.C with specified density
as per job mix formula.
Assist.Exe. Engineer(R&B)
Q C Section, Kadapa
Dy.Exe.Engineer(R&B)
Q C Sub Division, Kadapa