GOVERNMENT OF ANDHRA PRADESH

ROADS AND BUILDINGS DEPARTMENT

1.0
1.1

Name of Work

1.1.2

Estimate Rs

: 10.00

Lakhs

DR No. :

1.1.3

WE/RE Rs.

Lakhs

Authority:

1.1.4

Value of work done so far Rs

: 7.84

1.2.1

Name of the contractor

: Sri M.L Bhaskar Reddy, Rajampet.

1.2.2

C R Agt. No

: 255/2010-2011

1.2.3

Agreement contract value

: Rs. 8 32 870/-

1.2.4

DHS:

: 20.1.2011

1.3.1

Recovery proposed in previous Q C :


This is the first inspection
R's

1.3.2

Recovery proposed in present Q C


R

1.3.3

Date of Previous Inspection

1.3.4

Date of Present Inspection

1.3.5

This QC Report consists of

252/2010-11

Lakhs

TP:

12.60% less

DFC:

19.2.2011

Rs. 6778/This is the first inspection


22.7.2011
No. of pages

To
The Executive Engineer,
(R&B) Division, Rajampeta.
Copy submitted to the Superintending Engineer(R&B), I & Q C Circle, Kadapa
Copy submitted to the Superintending Engineer(R&B) Circle, Kadapa
Copy Submitted to the Executive Engineer(R&B) QC Division, Kadapa.
Copy to the Deputy Executive Engineer(R&B) Sub Division, Rayachoty

52/2010-11

12.60% less
19.2.2011

2.0 Estimate Provisions and Stage of Works


Name of the work :

Sl. No.

Description of items
Forming
embankment
with Side earth

Thick in C W W in Specif
mm
m
cation

as per T/s as per T/s

305

BT 40 mm patch work

Varying
width

Providing BT patch work


using 10-12mm HBD
metal with bitumen of
80/100 grade

Varying
width

--

WMM

200

4.05

406

SCSD

--

3.75

510

Tackcoat

--

3.75

503

SDBC 25mm thick

25

3.75

508

2.1
2.2

Progress of Work since last Q C inspection :


Deviations made if Any :

Not Given by Field officers

and Stage of Works

Stretches

Stage of Work

km: 26/0 - 28/0, 31/0-2, 33/036/0 & 39/0 - 47/0

Completed

Completed

Completed

km: 31/4-8, 35/6-10, 41/0-2,


42/8-10 , 43/0-4, 44/8-10,
53/0-10, & 83/0- 85/6

Completed

km: 31/4-8, 35/6-10, 41/0-2,


42/8-10 , 43/0-4, 44/8-10,
53/0-10, & 83/0- 85/6

Completed

km: 31/4-8, 35/6-10, 53/0-10,


& 85/2- 85/6

Completed

km: 31/4-8, 35/6-10, 53/0-10,


& 85/2- 85/6

Completed

This is the first inspection

5.0

SUMMARY OF Q C TESTS

5.1 Quality Control Tests By Field Staff :

The field officers shall carry out quality control tests on the materials namely bitumen mineral aggregates
used in BM and SDBC item of work to the frequency stipulated in the table 900-4 of MORTH
Specification.which is in annexure-I.

Further after completion of the work the field officers shall conduct necessary quality control tests on
finished items of works and to ascertain the test results obtained is whether within the acceptance criteria or
not as specified in table 903.4.2 which is as follows.

903.4.2Acceptance Criteria : The acceptance criteria for tests on density and Marshall stability shall be
subject to the condition that the mean value is not less than the specified value plus :

1.65 -

1.65
(No. of samples) 05

Times the standard deviation

The field officers have not furnished Quality Control test reocrds.

As per clause 1.11 of IRC SP-11 Quality Control for construction of roads and runways. Out of
total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by E.E. The test
result record register shall be presented to the QC staff during there inspection. This is not
followed.

ineral aggregates
0-4 of MORTH

control tests on
ptance criteria or

stability shall be

iation

nways. Out of
y E.E. The test
on. This is not

6.0 OBSERVATIONS
Name of the Work :

Sl.No.

Location

Type of
Layer

CWW
(Mts)

L1

Observed Average
Thickness(mm)
C
R2

Km
Average

SDBC
1

35/850

do

3.75

26

25

26

25.67

150

152

151.00

WMM
1

35/850

do

Assist.Exe. Engineer(R&B)

Dy.Exe. Engineer(R&B)

Q C Section, Kadapa

Q C Sub Division, Kadapa

Required
Thickness

Short
fall

25.00

--

150.00

--

Dy.Exe. Engineer(R&B)

Q C Sub Division, Kadapa

5.2 test conducted by Q C Staf

Gradation test for Wet Mix Macadam(table 400-11) KM


35/850
Sieve size

Wt.
retained

Cum.wt.
retained

%
retained

% passing

Wt. of sample
Specified
400-11

53 mm

0.00

0.00

0.00

100.00

100

45 mm

865.00

865.00

2.61

97.39

95-100

22.4 mm

6525.00

7390.00

22.26

77.74

60-80

11.2 mm

7214.00

14604.00

44.00

56.00

40-60

4.75mm

6489.00

21093.00

63.54

36.46

25-40

2.36mm

3246.00

24339.00

73.32

26.68

15-30

600 mic

4161.00

28500.00

85.86

14.14

8-22

75 mic

4535.00

33035.00

99.52

0.48

0-8

Pan

159.00

33194.00

100.00

0.00

Remarks

Assist.Exe. Engineer(R&B)

Dy.Exe. Engineer(R&B)

Q C Section, Kadapa

Q C Sub Division, Kadapa

33194.00
Remarks

Annexure-V
FIELD DENSITY TEST FOR S.D.B.C
S.No

Description

Sample taken in Km 35/850

Wt: of Sand + Cylinder (W1) grms

6514

Wt: of Sand after pouring in pit (W2) grms

5874

Wt: of Sand in pit + Cone (W3) grms

640

Wt: of Sand in Cone (W4) grms

328

Wt: of Sand in pit (W5) = W3-W4 grms

312

Density of sand

1.406

Volume of pit (V)

221.91

Wt: of S.D.B.C Sample (W6) grms

454

Density of S.D.B.C achieved Wt: (W6/V)

2.05

Remarks

gm/cc

Job mix formula is not furnished during the inspection. Field staff is requested to conduct density test at closure
intervals at the frequency specified by MORT&H 900 clause and ensure the density of S.D.B.C with specified density
as per job mix formula.

Assist.Exe. Engineer(R&B)
Q C Section, Kadapa

Dy.Exe.Engineer(R&B)
Q C Sub Division, Kadapa