1.0
1.1

Name of Work

1.1.2 Estimate Rs

: 9.00

Lakhs

TS No. :

1.1.3 WE/RE Rs.

: -

Lakhs

Authority:

1.1.4 Value of work done so far Rs

: 4.71

Lakhs

1.2.1 Name of the contractor

: Sri
S.Ramana
Kamalapuram.

1.2.2 C R Agt. No

1.2.3 Agreement contract value

: Rs 5 17 642 /-

1.2.4 D H S :

: 02.12.2010

1.3.1 Recovery proposed in previous


Q C R's
1.3.2 Recovery proposed in present
QCR

: This is the first inspection

1.3.3 Date of Previous Inspection

1.3.4 Date of Present Inspection

: 23.7.2011

1.3.5 This QC Report consists of

Reddy,

D.R.No.72 /2010
2011 FDR
-

Yerragudipadu

112/2010-2011

TP:

35.10 % less

DFC:

01.01.2011

Rs 12 320 /This is the first inspection

No. of pages

To
The Executive Engineer,
(R&B) Division, Proddatur

Copy Submitted to the Superintending Engineer(R&B) I & Q C Circle, Kadapa


Copy Submitted to the Superintending Engineer(R&B) Circle, Kadapa
Copy to the Executive Engineer(R&B) Q C Division, Kadapa.

Copy to the Deputy Executive Engineer(R&B) Sub Division, Proddatur South.

D.R.No.72 /2010 2011 FDR


-

Yerragudipadu

(V),

35.10 % less
01.01.2011

5.0

SUMMARY OF Q C TESTS

5.1 Quality Control Tests By Field Staff :

The field officers shall carry out quality control tests on the materials namely bitumen mineral aggregates
used in MSS item of work to the frequency stipulated in the table 900-4 which is in MORTH Specification
IV revision.

The field officers shall carry out quality control tests on materials used in WMM and satisfy the
requirements specifed in MORT&H. Further the Executive Engineer has to obtain mix design for GSB and
WMM and shall conduct trial test based on results obtained in trial tests, the mix design shall accorded then
only work shall be started but this is not followed.

Further after completion of the work the field officers shall conduct necessary quality control tests on
finished items of works and to ascertain the test results obtained is whether within the acceptance criteria or
not as specified in table 903.4.2 which is as follows.

903.4.2Acceptance Criteria : The acceptance criteria for tests on density and Marshall stability shall be
subject to the condition that the mean value is not less than the specified value plus :

1.65 -

1.65
(No. of samples) 05

Times the standard deviation

The field officers have not furnished Quality control test records.

As per clause 1.11 of IRC SP-11 Quality Control for construction of roads and runways. Out of
total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by E.E. The test
result record register shall be presented to the QC staff during there inspection. This is not
followed.

ineral aggregates
TH Specification

and satisfy the


ign for GSB and
all accorded then

control tests on
ptance criteria or

stability shall be

iation

nways. Out of
y E.E. The test
on. This is not

6.0 OBSERVATIONS
Name of the Work :

Sl.No. Location

Type of
Layer

CWW
(Mts)

12mm BT Patch work


2\4-8

Observed
Measurements

19.70
5.30
6.90
4.20
3.30
5.30
5.71
65.00

x
x
x
x
x
x
x
x

Exe. Area in
sq.m

3.75
2.25
2.50
2.30
1.90
4.20
1.90
3.66

Total

Exe. Area in sq.m


as per MB p 51 - 52
of 3446 A

73.88
11.93
17.25
9.66
6.27
22.26
10.85
237.90
390.00
x 0.024
9.360

9.670

12mm BT Patch work


Deficiency for 9.67 cum is .43 cum i.e 3.206%
For 75.69 cum(Total qty. recorded ) the deficiency is
Recovery amount
Deduct TP 35.1% Less

2.43 x 3906/1 cum

=
=

Double recovery as per circular

Assist.Exe.Engineer(R&B)
Q C section, Kadapa

Dy.Exe.Engineer(R&B)
QC Sub Division, Kadapa

sion, Kadapa

Short fall
in cum

0.310

2.43 cum
9491.58
-3331.54
6160.04