CLIENT CONSULTANT CONTRACTOR PROJECT:

PACKAGE-II : DOWN HILL CONVEYOR SYSTEM


DOC. NAME : DESIGN CALCULATION SHEET 51NS CORE FOR NEUTRAL CT OF
DISTRIBUTIONTRANSFORMEROFSS1ANDSS2
DOCUMENT NO. 1.1

1.2

1.3

1.4

REV.-01

Dated:03/07/2014

SystembasicInputData
Transformerrating

1250KVA

CTratios

800/1A

Design

3PH4WIRE

Voltage

415

VAC

Frequency

50

Hz

Ratio

800

AccuracyclassforCoreII(51NS)

5P

15

AccuracyclassforCoreI

PS

SelectedBurden(VA)forcoreI(PS)

15

VA

PrimaryVoltage(v)

6.6

kV

SecondaryVoltage(V)

415

Transformerrating

1.250

Impedenceoftransformer

%impedancevariationonnegativeside

BasicInputDataofCurrentTransformer:
1

BasicInputDataofDistributionTransformer:
11Kv

MVA
%
(nonegativetolerance
forcalculationpurpose)

DistributionSystemFaultCurrent:
=

Fullloadcurrent,IFL

ForSS2

(MVAX106)
(3XSec.Voltage)
6

=
=
MinTransformerImpedance,ZM

=
=
=

MaximumthroughfaultcurrentonLVsideoftransfromer, =
MVA,IF
=
IF
=
Max.throughFaultcurrentatCTSecondarySideI fs

1 of 2

=
=

(1.25x10)
(1.7322x415)
1739.06

(%impedancex(100%tolerance))/100
5x(1000))/100
5
%
(IFx100)/ZM
(1739.06x100)/5)
34781.2 Amp
IF/CTR
43.48 Amp

CT(CoreI)sizingcalculationfor51NSProtectionFor1.25MVADistributionTrafoSS1/SS2
CoreI:
2.0

CTsizingcalculationforIDMTEarthFaultprotectionRelay(51NS)
=
NumberofIdenticalCTS
=

LocationofCTS

2.1

2.2

2.3

Core_1ofNCTonTrafoorseperateCT

IDMTEarthFaultprotectionRelay(51NS)Inputdata
RelayModule

E/FSetting

10

CurrentI/Pburden,VA

0.1

VA

RelatyoperatingCurrent,IR

0.1

Amp

CoreICTInputdata
Ratio

800

/1A

SelectedBurden(VA)

15

VA

AccuracyClass

5P

15

CalculatedofCTBurdens:
=

50

Leadresistanceat70Cfor2.5mm copper(/km)

8.87

/km

LeadResistance(RL)()

0.89

()

LeadBurden(VA)

0.89

VA

TotalMeterBurden(VA)

0.1

VA

TotalBurdenonCT(VA)

0.99

VA

CTSecondaryresistanceat75 0C(Rct)
(DuetoDesignlimitationofCTmanufacturer,R ct)

CableLengthl(m)
2

Selectedburdenismorethanrequired.
2.4

HENCESAFE.

WhenCT,CoreIisusedwithratio2500/1A,Incaseofphasetophasefaultmaximumprimarycurrenttobe
measuredbytherelayforoperation
=
20%If
FaultcurrentatSecondary

If

VoltagedevelopedbyCTVct

CTVct
2.5

1 NOS

34.8

kA

If X(Rct+Rl)
Pri.CTRatio

34.8X1000X(4+0.887)/800)

212.59

AccordinglyminimumVAburdenofconsideredCTRatingwithALF15
ALF
VA

=
=

15
((Vct/ALF)xCTseccurrent)(RctxCTsecCurrent)

((212.59/15)X1)(4X1)

14.17

VA
=
10.17
Hence10VACThaving5P15accuracyisadequate
HenceNCTcore1orseperateCTon1.25MVADistributiontrafoCT800/1A,5P15,15VA,RCT=<4ohm