You are on page 1of 15

RONTO'S BILL of MATERIAL (B

MATERIAL PRICE PER SQUARE INCH

cardboard $2
clothe $3
metal $6
paper $1
plastic $5
wood $4

MATERIAL PRICE PER INCH

wire (electrical) $4
wire (metal) $3
rubber band $2
ribbon $3
string $2
thread $1

NOTES: If your construction material is not on the list, contact RONTO for pricing.

1) all material such as glue, tape, staples etc. needed to assemble the Flying Toy is free of cost.

2) all paints, stickers, or markers needed to decorate the Flying Toy is free of cost.

3) Prices are noted in 1-3 dollar digits to simplify cost-calculations.


NTO'S BILL of MATERIAL (BOM)

PRE-ASSEMBLED PART PRICE per UNIT

Ballon (rubber) $100


Battery (any sjize) $200
Box (wood) $100
Box (metal) $200
Box (paper) $50
Box (plastic) $150
Candle $100
Motor (electric) $500
Nuts & Bolts $20
Engine (chemicals; including gunpower) $400
Engine (liquids; including alcohol) $200
Fuselage (wood) $200
Fuselage (plastic) $300
Fuselage (paper) $100
Hellium (or any other gas) $100
Parachute $300
Propellors (airplane) $100
Rotors (helicoptor) $100
Screws, Pins, Clips $50
Tube (plastic) $300
Tube (wood) $200
Tube (paper) $100
Wheel $50
Wings (plastic) $300
Wings (paper) $100
Wings (wood) $200

is not on the list, contact RONTO for pricing.

ble the Flying Toy is free of cost.

Toy is free of cost.

ns.
PA
Team & Class:
ITEM
PART
wings
wings
body
wings
PARTS & MATERIAL INVOICE
E.S.G
ITEM
MATERIAL
metal
sheet paper
woods
rubber band
PARTS & MATERIAL INVOICE
Product Brand Name: Airplane

DESCRIPTION QUANTITY
wings 15inch
decorating wings by it. 5inch
body 15inch
it is fixed by it. 3
Date: 4/21/2010

PRICE (from BOM) $SUB-TOTAL


$50 $50
$50 $50
$100 $100
$2 $8

TOTAL PRODUCTION
COST $2.08
BUSCOM1.0/S10/TEAM_PROJECT_TASK_SHEET/project#3
 
TEAM NAME: CLASS NAME:
PROJECT NAME: #3 FLYING TOY PROTOTYPE DATE SUMITTED:

Explain what each team member contributed to the development & const
team's
flying toy prototype.
 
TASK DESCRIPTION:
 
 
 
 
 
 
 
 
TEAM MEMBER’S NAME:
 
TASK DESCRIPTION:
 
 
 
 
 
 
 
 
TEAM MEMBER’S NAME:
 
TASK DESCRIPTION:
 
 
 
 
 
 
 
 
TEAM MEMBER’S NAME:
 
TASK DESCRIPTION:
 
 
 
 
 
 
 
 
TEAM MEMBER’S NAME:
 
 
 
 
 
TEAM MEMBER’S NAME:
3

CLASS NAME:
E SUMITTED:

velopment & construction of your

You might also like