121 days
8/4/2015
66 days
8/12/2015
3
4
5
6
2 days
2 days
2 days
2 days
8/12/2015
8/14/2015
8/12/2015
8/18/2015
2 days
9/24/2015
8/13/2015
9
10
11
3 days
5 days
3 days
10/15/2015
10/15/2015
10/22/2015
12
13
Light fittings
Diffuser installation
3 days
3 days
10/27/2015
10/22/2015
14
15
Speaker fixing
Sprinkler fixing
2 days
2 days
10/22/2015
10/22/2015
16
Flooring cleaning
3 days
10/27/2015
17
Painting
10 days
10/30/2015
Micro Lab
89 days
19
20
21
22
23
5 days
6 days
15 days
3 days
5 days
12/9/2015
11/12/2015
9/21/2015
10/6/2015
10/9/2015
24
Isometric preparation - PW
distribution
5 days
8/12/2015
25
Isometric approvals - PW
distribution
2 days
8/19/2015
26
4 days
10/22/2015
Sr.No
Start
8/12/2015
27
Equipment positioning in
OSD water System room
4 days
10/28/2015
28
6 days
10/28/2015
29
11/5/2015
30
9/24/2015
31
2 days
10/16/2015
32
33
3 days
14 days
10/30/2015
8/19/2015
34
Door fixing
7 days
10/9/2015
35
36
2 days
9/15/2015
37
4 days
8/18/2015
38
39
40
10/15/2015
11/4/2015
11/12/2015
41
42
43
Light fittings
Point wiring
HEPA box installation
3 days
3 days
5 days
11/16/2015
11/19/2015
11/12/2015
7 days
11/19/2015
9/1/2015
45
Epoxy flooring
10 days
11/30/2015
QC area
48 days
47
48
15 days
10 days
10/12/2015
10/30/2015
49
5 days
11/12/2015
50
51
QC Furniture
LAN cabling for QC area
5 days
5 days
11/19/2015
10/20/2015
52
53
54
55
56
57
58
5 days
10 days
7 days
10 days
5 days
10 days
10 days
10/27/2015
10/12/2015
11/3/2015
11/12/2015
11/13/2015
12/3/2015
11/12/2015
59
2 days
11/25/2015
Stores (PPM,SPM,FG,
RM, corridor 2 and
Sampling)
91 days
9/2/2015
61
62
0 days
2 days
9/2/2015
11/16/2015
63
5 days
11/2/2015
64
65
66
67
68
69
70
71
10/12/2015
1/4/2016
11/2/2015
11/16/2015
11/19/2015
11/24/2015
11/16/2015
11/19/2015
9/21/2015
72
73
Cable terminations to
equipment
2 days
Dedusting tunnel installation 5 days
1/6/2016
12/11/2015
74
75
76
77
78
11/16/2015
10/12/2015
12/3/2015
12/18/2015
12/31/2015
79
80
12/9/2015
12/11/2015
81
82
83
3 days
5 days
10/12/2015
12/3/2015
84
3 days
11/9/2015
85
86
5 days
2 days
11/12/2015
11/19/2015
87
88
89
90
91
3 days
3 days
3 days
10 days
3 days
9/30/2015
10/5/2015
10/8/2015
10/13/2015
10/27/2015
92
93
94
95
Droppers to Diffusers
Point wiring
Light fixtures
Socket finishing
10 days
3 days
3 days
3 days
10/30/2015
10/27/2015
10/30/2015
10/7/2015
96
11/10/2015
97
98
99
12/15/2015
12/1/2015
11/17/2015
Production area
5 days
12 days
70 days
9/30/2015
9/24/2015
101
10 days
9/24/2015
102
103
Lintel breaking
3 days
10/15/2015
104
105
Masonry breaking
Door opening modification
3 days
5 days
10/26/2015
11/2/2015
106
107
108
109
Lintel recasting
Door closing by masonry
Black Piping - CA
Black piping - POW
5 days
5 days
3 days
3 days
11/9/2015
11/16/2015
11/23/2015
11/26/2015
110
111
112
113
114
115
116
117
118
119
120
121
12/1/2015
11/3/2015
11/5/2015
11/9/2015
11/11/2015
11/13/2015
11/17/2015
11/19/2015
11/23/2015
11/25/2015
11/27/2015
12/1/2015
122
5 days
10/1/2015
123
Cabling
3 days
10/8/2015
124
125
126
2 days
3 days
5 days
10/12/2015
10/14/2015
10/19/2015
127
128
10/26/2015
10/29/2015
129
130
131
False ceiling
15 days
HEPA box installation
5 days
Duct connections to HEPA box10 days
10/13/2015
11/3/2015
11/10/2015
10/8/2015
132
133
134
135
136
5 days
5 days
5 days
10 days
7 days
11/3/2015
11/10/2015
11/3/2015
11/24/2015
12/7/2015
137
7 days
12/7/2015
138
2 days
12/16/2015
139
12/18/2015
140
12/18/2015
141
12/16/2015
142
12/17/2015
143
Equipment positioning
Compression
2 days
12/18/2015
144
Equipment positioning
blender 1
1 day
12/22/2015
145
Equipment positioning
capsule filling
1 day
12/23/2015
146
12/24/2015
147
1 day
12/23/2015
148
Equipment positioning
blister packing 1
1 day
12/24/2015
149
12/25/2015
150
151
12/28/2015
12/16/2015
152
Door fixing
12 days
12/3/2015
153
5 days
12/21/2015
Commissioning of
Production area
Cleaning of whole area
HVAC system Blowdown
Filter loading
Air balancing
water balancing
Integrity check
17 days
3 days
3 days
3 days
3 days
3 days
3 days
Road work
Service floor
60 days
96 days
163
Manifold insulation
5 days
11/16/2015
164
165
166
167
168
5 days
5 days
5 days
5 days
3 days
11/23/2015
11/30/2015
12/7/2015
8/10/2015
10/8/2015
169
Instruments fixing
3 days
10/13/2015
170
171
electrical connections to
AHU
BMS panel fixing
2 days
2 days
10/14/2015
11/2/2015
172
173
174
175
5 days
5 days
5 days
2 days
11/4/2015
11/11/2015
11/18/2015
11/25/2015
176
5 days
8/10/2015
177
PA system installation in
BMS room
5 days
11/11/2015
178
179
180
3 days
5 days
2 days
10/19/2015
8/10/2015
9/16/2015
181
182
183
154
155
156
157
158
159
160
F
G
12/28/2015
12/28/2015
12/31/2015
1/5/2016
1/8/2016
1/13/2016
1/18/2016
10/16/2015
8/10/2015
11/11/2015
11/25/2015
12/9/2015
8/10/2015
185
3 days
186
10 days
187
10/30/2015
188
189
190
191
192
2 days
2 days
2 days
3 days
3 days
11/30/2015
8/10/2015
8/20/2015
11/2/2015
11/5/2015
193
194
195
196
197
Compressor to receiver
piping
Receiver to Drayer piping
filter fixing
Drayer to header piping
CA header fixing
2 days
2 days
2 days
2 days
2 days
9/9/2015
9/14/2015
9/16/2015
9/18/2015
9/22/2015
198
2 days
9/24/2015
199
2 days
9/28/2015
200
2 days
9/30/2015
201
202
203
204
205
5 days
2 days
2 days
2 days
2 days
10/2/2015
10/12/2015
10/14/2015
10/16/2015
10/20/2015
206
1 day
10/22/2015
207
10/23/2015
208
1 day
10/26/2015
209
210
Instrument fixing
ETP piping
3 days
3 days
10/27/2015
10/30/2015
9/3/2015
10/22/2015
211
212
2 days
2 days
11/2/2015
11/4/2015
213
214
2 days
3 days
11/6/2015
12/21/2015
215
216
217
10/2/2015
11/3/2015
11/12/2015
218
219
220
Assmebling of second
cooling tower
8 days
Cooling water piping
10 days
Cooling water pump positioni 3 days
11/2/2015
11/12/2015
11/26/2015
221
1 day
9/10/2015
222
12/4/2015
223
5 days
9/15/2015
224
5 days
11/19/2015
225
226
227
Socket finishing
2 days
UG tank cleaning and flushing5 days
Hydropneumatic system posit1 day
11/26/2015
11/20/2015
11/27/2015
228
229
230
Interconnecting piping of
pumphouse
Flushing of pipes
Hydrotesting
5 days
2 days
2 days
11/27/2015
12/4/2015
12/8/2015
231
Chiller commissioning
3 days
11/11/2015
232
10/30/2015
233
Cooling tower
commissioning
3 days
11/6/2015
234
Air Compressor
commissioning
3 days
11/11/2015
235
Boiler commissioning
5 days
11/23/2015
236
ETP commissioning
15 days
9/21/2015
237
238
239
240
241
11/30/2015
8/10/2015
12/28/2015
9/8/2015
12/24/2015
I
J
Procurement
Process Equipments
109 days
96 days
8/4/2015
8/21/2015
244
245
246
SS furniture URS
SS furniture PO
SS furniture delivery at site
2 days
7 days
45 days
9/25/2015
9/28/2015
10/7/2015
247
26 days
8/21/2015
248
10 days
9/28/2015
249
250
251
252
253
254
255
256
257
258
259
260
261
K
263
264
265
266
267
60 days
5 days
5 days
60 days
26 days
5 days
60 days
26 days
5 days
60 days
26 days
5 days
60 days
45 days
3 days
5 days
30 days
3 days
5 days
10/12/2015
9/25/2015
10/2/2015
10/9/2015
8/21/2015
9/28/2015
10/5/2015
8/21/2015
9/28/2015
10/5/2015
8/21/2015
9/28/2015
10/5/2015
9/24/2015
10/5/2015
10/8/2015
10/15/2015
10/5/2015
10/8/2015
268
Autoclave delivery
30 days
10/14/2015
269
2 days
9/24/2015
270
10 days
9/28/2015
271
5 days
9/24/2015
272
L
10 days
87 days
10/1/2015
8/4/2015
274
1 day
8/10/2015
275
2 days
8/4/2015
276
2 days
8/6/2015
277
278
M
Amendement of PO and
release of Advance for
Shaktimate doors
Delivery of doors
Stores
5 days
45 days
89 days
9/25/2015
10/1/2015
8/10/2015
280
281
282
3 days
10 days
30 days
9/9/2015
9/24/2015
10/7/2015
283
284
19 days
10 days
8/10/2015
9/28/2015
285
N
45 days
82 days
10/9/2015
8/31/2015
287
6 days
8/31/2015
288
289
10 days
50 days
10/1/2015
10/14/2015
290
291
292
293
294
Rework , removal of
electrical conduits, light
fixtures, switch sockets,
295 cables, hepa boxes.
10/7/2015
7 days
30 days
10 days
10 days
7 days
10/15/2015
10/26/2015
9/24/2015
9/24/2015
16/10/2015
SUMMERY OF PROJECT
A
66 days
8/12/2015 8:00
Micro Lab
89 days
8/12/2015 8:00
QC area
48 days
10/12/2015 8:00
Stores (PPM,SPM,FG,
RM, corridor 2 and
Sampling)
91 days
9/2/2015 17:00
Production area
70 days
9/24/2015 23:00
Road work
60 days
10/16/2015 8:00
Service floor
96 days
8/10/2015 8:00
8/10/2015 8:00
Procurement
109 days
8/4/2015 23:00
58 days
9/30/2015 8:00
Finish
% completion
2/28/2016
1/31/2016
Resource Name
85% ^
100%
8/13/2015
8/17/2015
8/13/2015
8/19/2015
9/25/2015
100% ACES
8/17/2015
100% AP Electrical
10/19/2015
12/10/2015
10/26/2015
100% AP electricla 2
100% PIIPL
100% AP Electrical
12/15/2015
2/11/2016
100% AP Electrical
100% Siuvidha engg
12/15/2015
10/23/2015
100% AP Electrical
100% Amar Piping2
2/22/2016
1/28/2016
2/5/2016
95%
1/25/2016
1/25/2016
10/10/2015
1/25/2016
1/25/2016
Loading
95% contractor
100% Clean piping
100% Amar Piping
100% Iclean
100% AP Electrical
8/18/2015
100% Nishotech
8/20/2015
10/27/2015
12/10/2015
1/25/2016
50% Nishotech
1/25/2016
50% Nishotech
10/3/2015
100% Iclean
1/28/2016
AP
100% Electrical/iIclean
1/28/2016
9/7/2015
AP
100% Electrical/Iclean
100% Iclean
1/21/2016
100% Iclean
9/14/2015
9/16/2015
8/21/2015
100% AP electricla 2
12/15/2015
11/11/2015
11/13/2015
100% AP electricla 2
100% Iclean
100% Amar Piping2
12/18/2015
11/23/2015
12/18/2015
100% AP Electrical
100% AP Electrical
100% Suvidha Engg
12/22/2015
12/11/2015
1/31/2016
92%
12/5/2015
11/13/2015
11/18/2015
1/31/2016
10/26/2015
100% G D Lab
100% AP electricla 2
11/2/2015
12/10/2015
1/22/2016
1/28/2016
11/19/2015
1/25/2016
1/22/2016
100% AP electricla 2
100% ?
100% PIIPL
100% Civil Contractor
100% PIIPL
100% Shaktimate[1]
100% Clean Coats
1/30/2016
0%
2/5/2016
75%
9/2/2015
11/17/2015
11/6/2015
1/5/2016
1/25/2016
1/31/2016
11/23/2015
11/26/2015
12/12/2015
12/18/2015
9/23/2015
To Be Delivered
0% on site
100% PIIPL3
100% AP electricals 3
100% AP electricals 3
100% AP electricals 3
100% Suvidha Engg
100%
100% AP electricals 3
1/7/2016
12/17/2015
100% AP electricals 3
0% Loading contract
11/20/2015
12/15/2015
12/10/2015
12/31/2015
1/7/2016
0% Loading contract
100% PIIPL3
100% Shaktimate[1]
100% PIIPL3
0% Rack Vendor[1]
12/15/2015
12/28/2015
312/01/2016
Loading
0% contractor
90% Clean Coats
82%
12/15/2015
12/10/2015
100% PIIPL2
100% Shaktimate[1]
11/11/2015
11/18/2015
11/20/2015
0% Amar Piping
0% Amar Piping
10/2/2015
10/7/2015
10/12/2015
12/10/2015
12/15/2015
100% AP electricals 3
100% AP electricals 3
100% AP electricals 3
100% Iclean
100% Suvidha Engg
11/12/2015
10/29/2015
11/3/2015
10/9/2015
100% ACES
100% AP electricals 3
100% AP electricals 3
100% AP electricals 3
11/16/2015
100% AP electricals 3
12/21/2015
12/14/2015
11/30/2015
2/15/2016
0% Loading contract
90% Clean Coats
80% Clean Coats
79%
10/8/2015
100%
10/15/2015
100%
10/19/2015
100% PIIPL2
10/28/2015
11/6/2015
100% PIIPL2
100% PIIPL2
11/13/2015
11/20/2015
11/25/2015
11/30/2015
100% PIIPL2
100% PIIPL2
100% Amar Piping
100% Amar Piping
12/4/2015
12/20/2015
12/20/2015
12/20/2015
12/21/2015
12/22/2015
12/23/2015
12/24/2015
12/25/2015
12/26/2015
12/27/2015
12/28/2015
10/7/2015
10/12/2015
12/15/2015
10/16/2015
10/23/2015
100% AP electricals 3
100% AP electricla 2
100% AP electricla 2
10/28/2015
11/2/2015
100% AP electricals 3
100% AP electricals 3
1/28/2016
2/22/2016
2/25/2016
95% Iclean
100% Suvidha Engg
100% Suvidha Engg
1/30/2016
11/16/2015
11/9/2015
2/25/2016
12/16/2015
90% AP electricla 2
100% AP electricla 2
100% Amar Piping2
80% Clean Coates
100% Clean coats
12/16/2015
0% Clean Coats
12/17/2015
Loading
contractor/manu
facturere
100% engineer
12/31/2015
100% ACG
12/21/2015
12/17/2015
12/30/2015
100% ACG
12/21/2015
12/22/2015
12/23/2015
12/24/2015
12/23/2015
Loading
0% contractor
12/24/2015
Loading
0% contractor
12/25/2015
12/28/2015
12/30/2015
Loading
0% contractor
60% Clean Coats
12/19/2015
95% Shaktimate[1]
1/28/2016
0% Iclean
1/20/2016
12/30/2015
1/4/2016
1/7/2016
1/12/2016
1/15/2016
1/20/2016
2/10/2016
2/22/2016
0%
0% Alpha Pharma
0% Suvidha Engg
0% Suvidha Engg
0% Suvidha Engg
0% Suvidha Engg
0% Suvidha Engg
95% PIIPL
74%
11/20/2015
11/27/2015
12/4/2015
12/16/2015
10/7/2015
10/12/2015
12/28/2015
0% Suvidha Engg
10/15/2015
12/25/2015
100% AP electricals 3
100% Suvidha Engg
12/25/2015
12/25/2015
12/28/2015
11/27/2015
1/10/2016
90% AP electricla 2
1/15/2015
100% AP Electrical
11/16/2015
12/5/2015
12/5/2015
100% AP electricals 3
70% Clean Coat
0% Iclean
11/24/2015
12/8/2015
12/22/2015
Nishotech team
0% not mobilised
0% Nishotech
0% Clean Coats
12/24/2015
90%
9/7/2015
12/10/2015
12/10/2015
100% PIIPL/Loading co
12/1/2015
8/11/2015
10/12/2015
12/20/2015
12/20/2015
100% AP electricals 3
100% AP Electrical
100% Adarsh,AP electricla 2
100% Amar piping 3
100% Amar piping 3
9/11/2015
9/16/2015
12/10/2015
9/22/2015
9/24/2015
9/26/2015
9/30/2015
10/2/2015
12/10/2015
12/15/2015
12/15/2015
12/15/2015
10/22/2015
Loading
contractor/Scre
100% eding
100% Simcos
100% Simcos
100% Amar piping
100% Amar piping 3
10/23/2015
10/24/2015
10/27/2015
12/28/2015
11/4/2015
0% Amar piping 3
100% ?
11/4/2015
11/6/2015
0% Amar piping 3
100% Amar piping 3
12/19/2015
12/24/2015
11/2/2015
11/11/2015
2/20/2016
100% PIIPL2
100% PIIPL2
100% Suvidha Engg
2/20/2016
11/26/2015
11/30/2015
12/5/2015
2/15/2016
9/21/2015
3/10/2016
80% AP electricals 3
11/27/2015
11/26/2015
11/27/2015
100% AP electricals 3
100% PIIPL
100% Loading contract
12/4/2015
12/8/2015
12/10/2015
2/29/2016
100% Trane
11/6/2015
100% PIIPL
2/25/2016
0% Simcos
12/28/2015
0% Rameshwari
8/11/2015
12/29/2015
9/14/2015
12/25/2015
0% Forbes Marshall
100%
100% Amar Piping2
100% Amar Piping/Load
100% Amar Piping2
1/2/2016
1/2/2016
66%
49%
9/28/2015
10/7/2015
12/9/2015
100%
100%
100%
9/26/2015
100%
10/10/2015
0%
1/2/2016
10/2/2015
10/9/2015
1/1/2016
9/26/2015
10/3/2015
12/26/2015
9/26/2015
10/3/2015
12/26/2015
9/26/2015
10/3/2015
12/26/2015
11/26/2015
10/8/2015
10/15/2015
11/26/2015
10/8/2015
10/14/2015
11/25/2015
9/25/2015
0%
100%
0%
0%
100%
0%
0%
100%
0%
0%
100%
0%
0%
60%
0%
0%
0%
100%
100% Elise
0% Indogerman[1]
Dhananjay
100% Lagwankar
10/9/2015
100% IPMS
9/30/2015
Elise,Dhananjay
100% Lagwankar
10/14/2015
12/3/2015
8/11/2015
Dhananjay
100% Lagwankar
8/6/2015
100% Shaktimate[1]
8/7/2015
Dhananjay
100% Lagwankar
10/1/2015
12/3/2015
12/11/2015
9/11/2015
10/7/2015
11/18/2015
Dhananjay
100% Lagwankar
0% Elise
0% Rack Vendor[1]
9/3/2015
10/9/2015
Dhananjay
100% Lagwankar
0% Elise
12/11/2015
12/23/2015
Dedusting
0% vendor[1]
88%
9/7/2015
22/10/2015
100% AP electricla 2
100%
Dhananjay
100% Lagwankar
10/14/2015
12/23/2015
100% Elise/Sherly
0%
10/15/2015
100%
10/24/2015
12/5/2015
10/8/2015
10/8/2015
100%
100%
100%
100%
100% AP elctricals
OJECT
HANDING OVER
DATE
11/12/2015 17:00
100%
12/15/2015 17:00
95%
12/17/2015 8:00
92%
1/7/2016 17:00
75%
12/31/2015 8:00
79%
1/7/2016 17:00
95%
12/22/2015 17:00
74%
12/24/2015 8:00
90%
1/2/2016 8:00
66%
12/21/2015 17:00
OVERALL PROJECT STATUS
82%
85%
2/5/2016
2/5/2016
A
B
A
C
B
D
C
E
D
FE
G
F
H
G
H
0
0
0
0
0
0
0
0
Sr. No.
Task Name
Duration Start
1
A
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
B
19
20
8/4/2015 23:00
8/12/2015 8:00
8/12/2015 8:00
8/14/2015 8:00
8/12/2015 8:00
8/18/2015 8:00
9/24/2015 8:00
8/13/2015 8:00
10/15/2015 8:00
10/15/2015 8:00
10/22/2015 8:00
10/27/2015 8:00
10/22/2015 8:00
10/22/2015 8:00
10/22/2015 8:00
10/27/2015 8:00
10/30/2015 8:00
8/12/2015 8:00
12/9/2015 8:00
11/12/2015 8:00
21
22
23
24
25
26
15 days
3 days
5 days
5 days
2 days
4 days
9/21/2015 8:00
10/6/2015 8:00
10/9/2015 8:00
8/12/2015 8:00
8/19/2015 8:00
10/22/2015 8:00
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
10/28/2015 8:00
10/28/2015 8:00
11/5/2015 8:00
9/24/2015 23:00
10/16/2015 8:00
10/30/2015 8:00
8/19/2015 8:00
10/9/2015 8:00
9/1/2015 8:00
9/15/2015 8:00
8/18/2015 8:00
10/15/2015 8:00
11/4/2015 8:00
11/12/2015 8:00
11/16/2015 8:00
11/19/2015 8:00
11/12/2015 8:00
44
45
C
47
48
49
50
51
52
53
54
55
56
57
58
59
D
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
3 days
3 days
3 days
11/19/2015 8:00
11/30/2015 8:00
10/12/2015 8:00
10/12/2015 8:00
10/30/2015 23:00
11/12/2015 8:00
11/19/2015 23:00
10/20/2015 8:00
10/27/2015 8:00
10/12/2015 23:00
11/3/2015 8:00
11/12/2015 8:00
11/13/2015 8:00
12/3/2015 23:00
11/12/2015 8:00
11/25/2015 23:00
9/2/2015 17:00
9/2/2015 17:00
11/16/2015 8:00
11/2/2015 8:00
1/4/2016 8:00
11/2/2015 8:00
11/16/2015 8:00
11/19/2015 8:00
11/24/2015 8:00
11/16/2015 8:00
11/19/2015 8:00
9/21/2015 8:00
1/6/2016 8:00
12/11/2015 8:00
11/16/2015 8:00
10/12/2015 8:00
12/3/2015 23:00
12/18/2015 8:00
12/31/2015 23:00
12/9/2015 8:00
12/11/2015 8:00
9/30/2015 8:00
10/12/2015 8:00
12/3/2015 23:00
11/9/2015 8:00
11/12/2015 8:00
11/19/2015 8:00
9/30/2015 8:00
10/5/2015 8:00
10/8/2015 8:00
90
91
92
93
False ceiling
Diffuser fixing
Duct connections to diffuers
Point wiring
10 days
3 days
10 days
3 days
10/13/2015 8:00
10/27/2015 8:00
10/30/2015 8:00
10/27/2015 8:00
94
95
Light fixtures
Socket finishing
3 days
3 days
10/30/2015 8:00
10/7/2015 8:00
96
97
98
99
E
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
5 days
5 days
10 days
10 days
70 days
10 days
5 days
3 days
3 days
5 days
5 days
5 days
3 days
3 days
4 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
5 days
3 days
2 days
3 days
5 days
3 days
3 days
15 days
5 days
10 days
5 days
5 days
5 days
11/10/2015 8:00
12/15/2015 8:00
12/1/2015 8:00
11/17/2015 8:00
9/24/2015 23:00
9/24/2015 23:00
10/8/2015 23:00
10/15/2015 8:00
10/26/2015 8:00
11/2/2015 8:00
11/9/2015 8:00
11/16/2015 8:00
11/23/2015 8:00
11/26/2015 8:00
12/1/2015 8:00
11/3/2015 8:00
11/5/2015 8:00
11/9/2015 8:00
11/11/2015 8:00
11/13/2015 8:00
11/17/2015 8:00
11/19/2015 8:00
11/23/2015 8:00
11/25/2015 8:00
11/27/2015 8:00
12/1/2015 8:00
10/1/2015 8:00
10/8/2015 8:00
10/12/2015 8:00
10/14/2015 8:00
10/19/2015 8:00
10/26/2015 8:00
10/29/2015 8:00
10/13/2015 8:00
11/3/2015 8:00
11/10/2015 8:00
11/3/2015 8:00
11/10/2015 8:00
11/3/2015 8:00
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
F
G
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
Painting 2 coats
10 days
Screeding
7 days
Curing
7 days
Equipment positioning FBD
2 days
Ducting between AHU and Fluidisation chamber 9 days
Equipment positioning RMG
2 days
Equipment positioning Coater
2 days
Ducting between AHU and Fluidisation chamber 9 days
Equipment positioning Compression
2 days
Equipment positioning blender 1
1 day
Equipment positioning capsule filling
1 day
Equipment positioning tipper
1 day
Equipment positioning roll compactor
1 day
Equipment positioning blister packing 1
1 day
equipment positioning blister packing 2
1 day
equipment positioning tablet inspection belt
1 day
Epoxy Flooring
10 days
Door fixing
12 days
Door interlocking system installation
5 days
Commissioning of Production area
17 days
Cleaning of whole area
3 days
HVAC system Blowdown
3 days
Filter loading
3 days
Air balancing
3 days
water balancing
3 days
Integrity check
3 days
Road work
60 days
Service floor
96 days
Manifold insulation
5 days
Split AC installation for water system room
5 days
Ducting for Ventilation units
5 days
TFA ducting
5 days
Piping connections
5 days
Valves fixing
3 days
Instruments fixing
3 days
electrical connections to AHU
2 days
BMS panel fixing
2 days
BMS sensor installation
5 days
BMS cabling
5 days
BMS commissioning
5 days
AHU startup
2 days
UPS & battery rack installation
5 days
PA system installation in BMS room
5 days
EMS system installation in BMS room
3 days
Epoxy for water room
5 days
Partition inside water room
2 days
Water system connections
5 days
11/24/2015 8:00
12/7/2015 23:00
12/7/2015 23:00
12/16/2015 8:00
12/18/2015 23:00
12/18/2015 8:00
12/16/2015 8:00
12/17/2015 23:00
12/18/2015 8:00
12/22/2015 8:00
12/23/2015 8:00
12/24/2015 8:00
12/23/2015 8:00
12/24/2015 8:00
12/25/2015 8:00
12/28/2015 8:00
12/16/2015 23:00
12/3/2015 23:00
12/21/2015 8:00
12/28/2015 8:00
12/28/2015 8:00
12/31/2015 8:00
1/5/2016 8:00
1/8/2016 8:00
1/13/2016 8:00
1/18/2016 8:00
10/16/2015 8:00
8/10/2015 8:00
11/16/2015 8:00
11/23/2015 8:00
11/30/2015 8:00
12/7/2015 8:00
8/10/2015 8:00
10/8/2015 8:00
10/13/2015 8:00
10/14/2015 8:00
11/2/2015 23:00
11/4/2015 23:00
11/11/2015 23:00
11/18/2015 23:00
11/25/2015 23:00
8/10/2015 8:00
11/11/2015 8:00
10/19/2015 8:00
8/10/2015 8:00
9/16/2015 8:00
11/11/2015 8:00
182
183
H
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
10 days
10 days
98 days
3 days
10 days
2 days
2 days
2 days
2 days
3 days
3 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
2 days
5 days
2 days
2 days
2 days
2 days
1 day
1 day
1 day
3 days
3 days
2 days
2 days
2 days
3 days
7 days
7 days
10 days
8 days
10 days
3 days
1 day
1 day
5 days
5 days
2 days
5 days
1 day
5 days
11/25/2015 8:00
12/9/2015 8:00
8/10/2015 8:00
9/3/2015 8:00
10/22/2015 23:00
10/30/2015 8:00
11/30/2015 8:00
8/10/2015 8:00
8/20/2015 8:00
11/2/2015 23:00
11/5/2015 23:00
9/9/2015 23:00
9/14/2015 23:00
9/16/2015 23:00
9/18/2015 23:00
9/22/2015 23:00
9/24/2015 23:00
9/28/2015 23:00
9/30/2015 23:00
10/2/2015 8:00
10/12/2015 23:00
10/14/2015 23:00
10/16/2015 23:00
10/20/2015 23:00
10/22/2015 23:00
10/23/2015 23:00
10/26/2015 23:00
10/27/2015 23:00
10/30/2015 23:00
11/2/2015 23:00
11/4/2015 23:00
11/6/2015 23:00
12/21/2015 23:00
10/2/2015 8:00
11/3/2015 8:00
11/12/2015 23:00
11/2/2015 23:00
11/12/2015 23:00
11/26/2015 8:00
9/10/2015 8:00
12/4/2015 23:00
9/15/2015 8:00
11/19/2015 8:00
11/26/2015 8:00
11/20/2015 8:00
11/27/2015 8:00
11/27/2015 23:00
229
230
231
232
233
234
235
236
237
238
239
240
241
I
J
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
K
263
264
265
266
267
268
269
270
271
272
L
274
275
Flushing of pipes
2 days
Hydrotesting
2 days
Chiller commissioning
3 days
Foundation for cooling tower
5 days
Cooling tower commissioning
3 days
Air Compressor commissioning
3 days
Boiler commissioning
5 days
ETP commissioning
15 days
Hot water generator commissioning
2 days
Street light installation
1 day
External fire hydrant installation
2 days
Fire pumps installation
5 days
Fire ring circuit connections
2 days
Procurement
109 days
Process Equipments
96 days
SS furniture URS
2 days
SS furniture PO
7 days
SS furniture delivery at site
45 days
Sampling and Dispensing booths URS
26 days
Sampling and Dispensing booths PO
10 days
Sampling and Dispensing booths delivery at site 60 days
LPD URS
5 days
LPD PO
5 days
LPD Delivery
60 days
Sifter URS
26 days
Sifter PO
5 days
Sifter delivery at site
60 days
Multimill URS
26 days
Multimill PO
5 days
Multimill Delivery at site
60 days
Bins URS
26 days
Bins PO
5 days
Bins delivery at site
60 days
Micro Lab
45 days
Biosafety cabinet URS
3 days
Biosafety cabinet Ordering
5 days
Biosafety cabinet Delivery
30 days
Autoclave URS
3 days
Autoclave ordering
5 days
Autoclave delivery
30 days
Clean piping BOQ
2 days
Clean piping vendor finalisation
10 days
Additional LAN socket ordering for Micro area 5 days
LAN Socket delivery at site
10 days
QC area
87 days
Door sizes standardisation
1 day
Door GA drawings sent to structural consultant f 2 days
12/4/2015 23:00
12/8/2015 23:00
11/11/2015 23:00
10/30/2015 23:00
11/6/2015 23:00
11/11/2015 23:00
11/23/2015 23:00
9/21/2015 23:00
11/30/2015 23:00
8/10/2015 23:00
12/28/2015 8:00
9/8/2015 8:00
12/24/2015 8:00
8/4/2015 23:00
8/21/2015 23:00
9/25/2015 8:00
9/28/2015 23:00
10/7/2015 23:00
8/21/2015 23:00
9/28/2015 23:00
10/12/2015 23:00
9/25/2015 23:00
10/2/2015 23:00
10/9/2015 23:00
8/21/2015 23:00
9/28/2015 23:00
10/5/2015 23:00
8/21/2015 23:00
9/28/2015 23:00
10/5/2015 23:00
8/21/2015 23:00
9/28/2015 23:00
10/5/2015 23:00
9/24/2015 8:00
10/5/2015 23:00
10/8/2015 23:00
10/15/2015 23:00
10/5/2015 23:00
10/8/2015 8:00
10/14/2015 23:00
9/24/2015 8:00
9/28/2015 8:00
9/24/2015 8:00
10/1/2015 8:00
8/4/2015 23:00
8/10/2015 23:00
8/4/2015 23:00
276
277
278
M
280
281
282
283
284
285
N
287
288
289
290
291
292
293
294
A
B
C
D
E
F
G
H
I
J
K
L
M
N
2 days
5 days
45 days
89 days
3 days
10 days
30 days
19 days
10 days
45 days
82 days
6 days
10 days
50 days
6 days
7 days
30 days
10 days
10 days
8/6/2015 8:00
9/25/2015 8:00
10/1/2015 23:00
8/10/2015 8:00
9/9/2015 8:00
9/24/2015 8:00
10/7/2015 23:00
8/10/2015 8:00
9/28/2015 8:00
10/9/2015 23:00
8/31/2015 8:00
8/31/2015 8:00
10/1/2015 8:00
10/14/2015 23:00
10/7/2015 23:00
10/15/2015 23:00
10/26/2015 23:00
9/24/2015 23:00
9/24/2015 23:00
8/12/2015 8:00
8/12/2015 8:00
10/12/2015 8:00
9/2/2015 17:00
9/24/2015 23:00
10/16/2015 8:00
8/10/2015 8:00
8/10/2015 8:00
8/4/2015 23:00
8/21/2015 23:00
9/24/2015 8:00
8/4/2015 23:00
8/10/2015 8:00
8/31/2015 8:00
Finish
Finish1
1/20/2016 17:00 NA
11/12/2015 17:00 NA
8/13/2015 17:00 NA
8/17/2015 17:00 NA
8/13/2015 17:00 NA
8/19/2015 17:00 NA
9/25/2015 17:00 NA
8/17/2015 17:00 NA
10/19/2015 17:00 NA
10/21/2015 17:00 NA
10/26/2015 17:00 NA
10/29/2015 17:00 NA
10/26/2015 17:00 NA
10/23/2015 17:00 NA
10/23/2015 17:00 NA
10/29/2015 17:00 NA
11/12/2015 17:00 NA
12/15/2015 17:00 NA
12/15/2015 17:00 NA
11/19/2015 17:00 NA
3
4
102
10
11
10
10
10
13
16
246,
39
10/10/2015 17:00 NA
10/8/2015 17:00 NA
10/15/2015 17:00 NA
8/18/2015 17:00 NA
8/20/2015 17:00 NA
10/27/2015 17:00 NA
11/2/2015 17:00 NA
11/4/2015 17:00 NA
12/2/2015 17:00 NA
10/3/2015 8:00 NA
10/19/2015 17:00 NA
11/3/2015 17:00 NA
9/7/2015 17:00 NA
10/19/2015 17:00 NA
9/14/2015 17:00 NA
9/16/2015 17:00 NA
8/21/2015 17:00 NA
10/19/2015 17:00 NA
11/11/2015 17:00 NA
11/13/2015 17:00 NA
11/18/2015 17:00 NA
11/23/2015 17:00 NA
11/18/2015 17:00 NA
26
26
28
22,8
24
10
22,2
31,1
22
22
6
35
8
272
32,3
36,3
40,3
41
39
11%
15%
0% Amar Piping2
0% Amar Piping2
80% Amar Piping
0% Amar Piping2
0% Hitech Aircon
50% AP Electrical
0% AP electricla 2
0% PIIPL
100% AP Electrical
0% AP Electrical
0% ACES
0% AP Electrical
0% Amar Piping2
0% PIIPL
0% PIIPL
33%
0% Loading contractor
0% Clean piping
60% Amar Piping
0% Iclean
0% AP Electrical
100% Nishotech
100% Dhananjay Lagwankar
100% PIIPL2
0% Loading contractor,Nishotech
0% Nishotech
0% Nishotech
0% Alpha Pharma
0% AP Electrical
50% AP Electrical/Iclean
100% Iclean
0% Iclean
75% Amar Piping2
0% Amar Piping2
100% AP electricla 2
100% AP electricla 2
0% Iclean
0% Amar Piping2
0% AP Electrical
100% AP Electrical
0% ACES
11/27/2015 17:00 NA
43
12/11/2015 17:00 NA
44
12/17/2015 8:00 NA
10/30/2015 17:00 NA
21
11/13/2015 8:00 NA
47
11/18/2015 17:00 NA
54
11/26/2015 8:00 NA
49F
10/26/2015 17:00 NA
38
11/2/2015 17:00 NA
51
10/24/2015 8:00 NA
11/11/2015 17:00 NA
51,5
11/25/2015 17:00 NA
54
11/19/2015 17:00 NA
17
12/17/2015 8:00 NA
56,2
11/25/2015 17:00 NA
54
11/27/2015 8:00 NA
58
1/7/2016 17:00 NA
9/2/2015 17:00 NA
36
11/17/2015 17:00 NA
40
11/6/2015 17:00 NA
47
1/5/2016 17:00 NA
249
11/13/2015 17:00 NA
47
11/18/2015 17:00 NA
65
11/23/2015 17:00 NA
66
11/26/2015 17:00 NA
67
11/18/2015 17:00 NA
65
11/25/2015 17:00 NA
69
9/23/2015 17:00 NA
1/7/2016 17:00 NA
64
12/17/2015 17:00 NA
285
11/20/2015 17:00 NA
65
10/16/2015 17:00 NA
12/10/2015 8:00 NA
75,2
12/31/2015 17:00 NA
75,7
1/7/2016 8:00 NA
77
12/15/2015 17:00 NA
246
12/28/2015 17:00 NA
76F
12/21/2015 17:00 NA
10/14/2015 17:00 NA
12/10/2015 8:00 9/19/2015 17:00 278
11/11/2015 17:00
9/8/2015 17:00 47
11/18/2015 17:00 9/15/2015 17:00 84
11/20/2015 17:00 9/17/2015 17:00 85
0% ACES
0% PIIPL2
15%
0% Amar Piping
0%
0% Clean piping
0% Clean room furniture[1]
0% AP electricla 2
100% AP electricla 2
0%
0% PIIPL
100% PIIPL
0% PIIPL
0% Shaktimate[1]
0% PIIPL
0%
12%
0% Amar Piping2
0% Amar Piping2
0% Amar Piping
0% Loading contractor
0% PIIPL3
0% AP electricals 3
100% AP electricals 3
0% AP electricals 3
0% ACES
0% ACES
100% AP electricals 3
0% AP electricals 3
0% Loading contractor
0% Loading contractor
0% PIIPL3
0% Shaktimate[1]
0% PIIPL3
0% Rack Vendor[1]
0% Loading contractor
0% PIIPL3
0%
0% PIIPL2
0% Shaktimate[1]
0% Amar Piping
0% Amar Piping
0% Amar Piping
10/2/2015 17:00
10/7/2015 17:00
10/12/2015 17:00
0% AP electricals 3
100% AP electricals 3
50% AP electricals 3
8/31/2015 17:00
9/3/2015 17:00 87
9/8/2015 17:00 88
10/26/2015 17:00
10/29/2015 17:00
11/12/2015 17:00
10/29/2015 17:00
9/22/2015 17:00 89
9/25/2015 17:00 90
10/9/2015 17:00 91
9/25/2015 17:00 90
11/3/2015 17:00
10/9/2015 17:00
9/30/2015 17:00 93
10/9/2015 17:00
0% Iclean
0% ACES
0% ACES
100% AP electricals 3
0% AP electricals 3
0% AP electricals 3
0% AP electricals 3
0% Loading contractor
0% PIIPL2
0% PIIPL
5%
0%
0%
0% PIIPL2
0% PIIPL2
0% PIIPL2
0% PIIPL2
0% PIIPL2
0% Amar Piping
0% Amar Piping
0% Amar Piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% Clean piping
0% EMS Vendor
0% EMS Vendor
0% AP electricals 3
100% AP electricla 2
100% AP electricla 2
0% AP electricals 3
100% AP electricals 3
0% Iclean
0% ACES
0% ACES
0% AP electricla 2
0% AP electricla 2
0% Amar Piping2
12/7/2015 17:00 NA
12/16/2015 8:00 NA
12/16/2015 8:00 NA
12/17/2015 17:00 NA
12/31/2015 8:00 NA
12/21/2015 17:00 NA
12/17/2015 17:00 NA
12/30/2015 8:00 NA
12/21/2015 17:00 NA
12/22/2015 17:00 NA
12/23/2015 17:00 NA
12/24/2015 17:00 NA
12/23/2015 17:00 NA
12/24/2015 17:00 NA
12/25/2015 17:00 NA
12/28/2015 17:00 NA
12/30/2015 8:00 NA
12/19/2015 8:00 NA
12/25/2015 17:00 NA
1/20/2016 17:00 NA
12/30/2015 17:00 NA
1/4/2016 17:00 NA
1/7/2016 17:00 NA
1/12/2016 17:00 NA
1/15/2016 17:00 NA
1/20/2016 17:00 NA
1/7/2016 17:00 NA
12/22/2015 17:00 NA
11/20/2015 17:00 NA
11/27/2015 17:00 NA
12/4/2015 17:00 NA
12/16/2015 17:00 NA
10/7/2015 17:00 NA
10/12/2015 17:00 NA
10/15/2015 17:00 NA
10/15/2015 17:00 NA
11/4/2015 8:00 NA
11/11/2015 8:00 NA
11/18/2015 8:00 NA
11/25/2015 8:00 NA
11/27/2015 8:00 NA
10/9/2015 17:00 NA
11/17/2015 17:00 NA
11/16/2015 17:00 NA
9/15/2015 17:00 NA
9/17/2015 17:00 NA
11/24/2015 17:00 NA
130,
135
136
137
138F
138
137
141
141
143
144
145
289
147
148
149
137
278,
152
153
155
156
157
158
159
163
164
165
167
168
171
172
173
174
179
0% PIIPL
0%
0%
0% Loading contractor
0%
0% Loading contractor
0% Loading contractor
0%
0% Loading contractor
0% Loading contractor
0% Loading contractor
0% Loading contractor
0% Loading contractor
0% Loading contractor
0% Loading contractor
0% Loading contractor
0%
0% Shaktimate[1]
0% Iclean
0%
0% Bharat Sangam
0% ACES
0% ACES
0% ACES
0% ACES
0% ACES
0% PIIPL
8%
0% ACES
0% ACES
0% ACES
0% ACES
75% Amar Piping
0% Amar Piping
0% Amar Piping
100% AP electricals 3
0% ACES2
0% ACES2
0% ACES2
0% ACES2
0% ACES2
0% AP electricla 2
0% AP Electrical
0% AP electricals 3
0% PIIPL3
0% PIIPL3
0% Amar Piping,Nishotech,AP electricla 2
12/8/2015 17:00 NA
12/22/2015 17:00 NA
12/24/2015 8:00 NA
9/7/2015 17:00 NA
11/5/2015 8:00 NA
11/2/2015 17:00 NA
12/1/2015 17:00 NA
8/11/2015 17:00 NA
10/12/2015 17:00 NA
11/5/2015 8:00 NA
11/10/2015 8:00 NA
9/11/2015 8:00 NA
9/16/2015 8:00 NA
9/18/2015 8:00 NA
9/22/2015 8:00 NA
9/24/2015 8:00 NA
9/26/2015 8:00 NA
9/30/2015 8:00 NA
10/2/2015 8:00 NA
10/8/2015 17:00 NA
10/14/2015 8:00 NA
10/16/2015 8:00 NA
10/20/2015 8:00 NA
10/22/2015 8:00 NA
10/23/2015 8:00 NA
10/24/2015 8:00 NA
10/27/2015 8:00 NA
10/30/2015 8:00 NA
11/4/2015 8:00 NA
11/4/2015 8:00 NA
11/6/2015 8:00 NA
12/19/2015 8:00 NA
12/24/2015 8:00 NA
11/2/2015 17:00 NA
11/11/2015 17:00 NA
11/26/2015 8:00 NA
11/12/2015 8:00 NA
11/26/2015 8:00 NA
11/30/2015 17:00 NA
9/10/2015 17:00 NA
12/5/2015 8:00 NA
9/21/2015 17:00 NA
11/25/2015 17:00 NA
11/27/2015 17:00 NA
11/26/2015 17:00 NA
11/27/2015 17:00 NA
12/4/2015 8:00 NA
181
182
294F
209
187
191
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
223
187
211
212
213
215
215
215
218
219
220
224
226
227
0% Nishotech
0% PIIPL2
12%
100% Dhananjay Lagwankar
0%
0% Loading contractor
0% AP electricals 3
100% AP Electrical
100% Adarsh,AP electricla 2
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
100% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Loading contractor
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% Amar piping 3
0% PIIPL2
0% PIIPL2
0% ACES3
0% ACES3
0% Amar piping 3
0% Loading contractor
0% Loading contractor
0% Amar piping 3
0% Loading contractor
0% AP electricals 3
0% AP electricals 3
0% Bharat Sangam
0% Loading contractor
0% Amar piping 3
12/8/2015 8:00 NA
228
12/10/2015 8:00 NA
229
11/14/2015 8:00 NA
233
11/6/2015 8:00 NA
11/11/2015 8:00 NA
232
11/14/2015 8:00 NA
233
11/28/2015 8:00 NA
234F
10/10/2015 8:00 NA
223
12/2/2015 8:00 NA
235
8/11/2015 8:00 NA
12/29/2015 17:00 NA
241
9/14/2015 17:00 NA
12/25/2015 17:00 NA
1/2/2016 8:00 NA
1/2/2016 8:00 4/30/2016 17:00
9/28/2015 17:00 NA
10/7/2015 8:00 NA
244
12/9/2015 8:00 NA
245
9/26/2015 17:00 NA
10/10/2015 8:00 NA
247
1/2/2016 8:00 NA
248
10/2/2015 8:00 NA
10/9/2015 8:00 NA
250
1/1/2016 8:00 NA
251
9/26/2015 17:00 NA
10/3/2015 8:00 NA
253
12/26/2015 8:00 NA
254
9/26/2015 17:00 NA
10/3/2015 8:00 NA
256
12/26/2015 8:00 NA
257
9/26/2015 17:00 NA
10/3/2015 8:00 NA
259
12/26/2015 8:00 NA
260
11/26/2015 8:00 NA
10/8/2015 8:00 NA
10/15/2015 8:00 NA
263
11/26/2015 8:00 NA
264
10/8/2015 8:00 NA
10/14/2015 17:00 NA
266
11/25/2015 8:00 4/30/2016 17:00 267
9/25/2015 17:00 NA
10/9/2015 17:00 NA
269
9/30/2015 17:00 NA
10/14/2015 17:00 NA
271,
12/3/2015 8:00 NA
8/11/2015 8:00 NA
8/6/2015 8:00 NA
0% Amar piping 3
0% Amar piping 3
0% ACES3,Trane
0% PIIPL
0% ACES3
0% Chicago Pneumatic
0% Simcos
0% Rameshwari
0% Forbes Marshall
100%
100% Amar Piping2
0% Loading contractor
100% Amar Piping2
26%
22%
0% Dhananjay Lagwankar
0%
0%
100%
0%
0%
0%
0%
0%
100%
0%
0%
100%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%
0% Bharat Sangam,Elise
0% Indogerman[1]
0% Dhananjay Lagwankar
0% Bharat Sangam,Elise
0% Bharat Sangam,Elise,Dhananjay Lagwankar
0% AP electricla 2
60%
100% Dhananjay Lagwankar
100% Shaktimate[1]
8/7/2015 17:00 NA
275
10/1/2015 17:00 NA
276
12/3/2015 8:00 NA
277
12/11/2015 8:00 10/9/2015 17:00
9/11/2015 17:00 NA
10/7/2015 17:00 NA
11/18/2015 8:00 NA
281
9/3/2015 17:00 NA
10/9/2015 17:00 NA
12/11/2015 8:00 NA
284
12/23/2015 8:00 9/25/2015 17:00
9/7/2015 17:00 NA
10/14/2015 17:00 NA
12/23/2015 8:00 NA
288
10/15/2015 8:00 NA
10/24/2015 8:00 NA
290
12/5/2015 8:00 NA
291
10/8/2015 8:00 NA
10/8/2015 8:00 NA
11/12/2015 17:00 NA
12/15/2015 17:00 NA
12/17/2015 8:00 NA
1/7/2016 17:00 NA
12/31/2015 8:00 NA
1/7/2016 17:00 NA
12/22/2015 17:00 NA
12/24/2015 8:00 NA
1/2/2016 8:00 NA
1/2/2016 8:00 4/30/2016 17:00
11/26/2015 8:00 NA
12/3/2015 8:00 NA
12/11/2015 8:00 10/9/2015 17:00
12/23/2015 8:00 9/25/2015 17:00
15%
33%
15%
12%
5%
0%
8%
12%
22%
22%
0%
60%
33%
13%
18%
Remarks
Amended PO pending
Contractor
not mobilised
of pending
civil work
Cabling
completed
as beacause
per old design,
Pending
for IT scheme
finalisation from Alpha
Drawing approval pending from Alpha and order ammendment.
Pending for finalisation of civil contractor
Pending for false ceiling work
Pending for false ceiling work
Pending for order ammendment
Pending for finalisation of civil contractor and to be included in BOQ.
Pending for finalisation of civil contractor
Delayed due to site clearance from I clean
Spectrum to release BOQ by Sept. 7
Additional team to be mobilised by Amar Piping. Shall be mobilised from
04/10/2015
Contractor not mobilised beacause of PO amendment and IT clearance
Pending for rework of I clean
After Final finishing of civil work at the time of hand over to avoid any
damage.
PA system Ammendmend pending
Civil
Civil contractor not finalised
Civil contractor not finalised
Civil contractor not finalised
Civil contractor not finalised
Civil contractor not finalised
Pending for civil finishing and at the timr of handing over to avoid any damages
Ammendment
Civil cntractor finalisation
Tank farm pump pipe rack to be fabricated
Material delivery.
Material delivery.
This is to be checked
No status update
This equiipment delivery is very far, so scheduled manually
Action BY
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma
Alpha Pharma and I clean
Spectrum and Alpha Pharma for finalising contractor
Alpha Pharma
Chirst Nishotech
Chirst Nishotech
Chirst Nishotech
I clean
I clean
Sandeep Gupte
Sandeep Gupte
Alpha Pharma
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
ny damages
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Sandeep Gupte
Alpha Pharma
Spectrum
Alpha Pharma
Alpha Pharma
Sandeep Gupte
Alpha Pharma
Admin Block
Startup
66 days
8/12/2015 8:00
11/12/2015 17:00
Micro Lab
89 days
8/12/2015 8:00
12/15/2015 17:00
QC area
48 days
10/12/2015 8:00
12/17/2015 8:00
Stores
(PPM,SPM,FG,
RM, corridor 2
and Sampling) 91 days
9/2/2015 17:00
1/7/2016 17:00
Change room
and U/C
Corridor
58 days
9/30/2015 8:00
12/21/2015 17:00
Production
area
70 days
9/24/2015 23:00
12/31/2015 8:00
Road work
60 days
10/16/2015 8:00
1/7/2016 17:00
Service floor
96 days
8/10/2015 8:00
12/22/2015 17:00
Utility and
Pumphouse
98 days
8/10/2015 8:00
12/24/2015 8:00
Procurement
109 days
8/4/2015 23:00
1/2/2016 8:00
Process
Equipments
96 days
8/21/2015 23:00
1/2/2016 8:00
24/09/2015
1/19/2016
15%
100%
88
33%
95%
73
15%
92%
88
12%
75%
67
0%
82%
71%
5%
79%
67
0%
95%
95
8%
74%
36
12%
90%
74
22%
66%
22%
0%
.
13%
85%
.