ITEM NO.
A.
WORK DESCRIPTION
M.H./ UNIT
SQ.M.
SQ.M.
SQ.M.
SQ.M.
4.00
4.70
6.16
4.70
SQ.M.
SQ.M.
3.34
6.66
SQ.M.
SQ.M.
SQ.M.
17.20
22.00
1.00
B.
FORMWORKS FABRICATION
SQ.M.
2.15
C.
STRIPPING OF FORMS
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
0.50
2.58
2.06
1.70
PC
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
B.F.
2.00
0.29
0.30
0.53
1.94
0.85
0.70
1.60
0.43
0.27
0.53
0.91
PC
S.F.
2.00
0.83
WALL ON GROUND
WALL ABOVE 10'
BEAMS
COLUMNS
SUSPENDED SLAB
0 TO 18'
18' TO 36' UP
ELEVATED AND SHORED SLAB FORMING
STRIP OF FORMS
FLOOR SLAB AT GRADE STRIP OF FORMS
1.67
2.16
7.00
5.60
FRAME INSTALLATION
PLYWOOD INSTALLLATION
CABINET BOARDING
CABINET FRAMING
WOOD WALL PARTITION
PANEL WALL
FORMING WEIGHT ANCHOR BOLT
WET FORMING
E.
F.
SQ.M.
SQ.M.
B.F.
B.F.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.66
2.00
0.26
0.36
1.00
14.00
9.00
7.00
PC.
PC.
0.80
4.00
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
EACH
EACH
EACH
EACH
S.F.
SET
B.F.
B.F.
SQ.M.
9.26
6.24
9.26
6.34
6.76
20.00
24.00
20.00
50.00
0.63
3.20
0.44
0.66
6.24
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.34
2.86
4.00
10.00
21.06
8.70
6.00
9.00
8.00
1.00
6.00
4.00
2.40
3.60
17.00
2.28
1.43
SQ.M.
SQ.M.
SQ.M.
SQ.M.
3.20
2.66
4.00
10.66
G.
I.
SQ.M.
11.94
TINSMITHING WORK
CORR GI SHEETS:
LIFTING
INSTALLATION
INSTALLATION OF ASBESTOS ROOFING
INSTALLATION OF ALUMINUM GI SHEET
COPPER CLADDING ROOF DECK
FAB, GI GUTTER
GI SHEET ROOFING
FAB OF GI GUTTER
FAB. GI DOWNSPOUT
GUTTER CUT & SHAPE
INST. OF GUTTER
DOWNSPOUT CUT AND SHAPE
DOWNSPOUT INSTALLATION
CORR. GI ROOFING
CORR ALUMINUM ROOFING
BUILT UP ROOFING 4 PLY
PROTECTED METAL
CORR. ASBESTOS INST., LIFTING & HAULING
LEADERS & GUTTERS
SQ.M.
SQ.M.
SHT.
SHT.
L.M.
SHT.
SHT.
L.M.
L.M.
L.M.
L.M.
L.M.
L.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
2.16
6.12
2.00
1.60
1.01
6.94
1.64
1.05
1.94
0.32
1.78
0.59
0.27
3.60
3.60
17.00
4.00
3.40
1.20
CU.M.
CU.M.
SQ.M.
SQ.M.
10.00
50.00
2.00
2.86
KGS
KGS
KGS
CU.M.
CU.M.
0.14
0.16
0.20
32.00
3.60
CU.M.
CU.M.
CU.M.
SQ.M.
14.00
28.00
54.00
5.60
CU.M.
KGS
KGS
42.00
1.06
0.66
CU.M.
CU.M.
CU.M.
1.20
1.60
2.20
GRANULAR BACKFILL
GRANULAR SOIL BACKFILL
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND
EXCAVATION OF SAND &MARL
EXCAVATION OF MARL
BACKFILL OF SAND
BACKFILL OF SAND &MARL
BACKFILL OF MARL
FLOOR SLAB & GRADE:
GRADING MANUAL
EXCAVATION AND BACKFILL
FINE GRADING & FINISHING
GRADING MANUAL
FINISHING SOIL SURFACE
DIKES
ROAD WORKS
BASE COURSE
CURBS & GUTTER
4" THK ROAD
6" THK ROAD
8" THK ROAD
TROWEL FINISH
SPECIAL TOPPING
4" STONE OR SHELL ROAD
6" STONE OR SHELL ROAD
8" STONE OR SHELL ROAD
ACID PROOFING
ASPHALT PAVING:
FINE GRADING & FINISHING
PLACE BASE COURSE
ASPHALT
ACID BLOCK OR PAVING BLOCK:
FIND GRADING
INSTALL BRICK
CRUSH STONE OR SHELL SURFACING
FINE GRADING
PLACE SPREAD AND COMPACT STONE TO 4"
OVER 9" THK
TANK CUSHION
SAND CUSHION
APHALT RETAINER RING
NON GRANULAR BACKFILL
EXCAVATION MANUAL:
COMMON EARTH
LOAN OF SAND
CLAY OR HEAVY SOIL ROCK
ROCK
MECHANICAL EXCAVATION
COMMON EARTH
ROCK W/ JACKHAMMER
CU.M.
CU.M.
2.40
3.00
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
8.00
13.00
21.00
11.00
16.00
24.00
SQ.M.
CU.M.
2.60
36.00
SQ.M.
SQ.M.
CU.M.
0.90
1.10
2.40
SQ.M.
CU.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
SQ.M.
CU.M.
0.24
3.60
2.60
2.80
3.00
0.64
2.40
0.64
0.84
1.04
1.20
SQ.M.
SQ.M.
SQ.M.
0.84
0.40
0.40
SQ.M.
SQ.M.
0.84
8.40
SQ.M.
SQ.M.
SQ.M.
0.64
0.84
1.04
CU.M.
SQ.M.
CU.M.
1.40
0.40
4.00
CU.M.
CU.M.
CU.M.
CU.M.
16.00
2.62
3.28
5.26
CU.M.
CU.M.
13.34
33.34
BACKFILLING
COMMON MANUAL
GRAVEL FILL MANUAL
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH
2 TO 3
3 TO 4
4 TO 5
PLACING BINDER GRAVEL
ESCOMBRO BACKFILLING
SPREADING, TAMPING AND GRADING
MECHANICAL COMPACTION, PLATE COMPACTION
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12"
CLEARING UNDERGROWTH AND SHRUBS
DISPOSAL OF SOIL
MAULING OF SOIL
GRAVEL FILL
EXCAVATION CRANE AND CLAMPSHELL
WITH 8-MEN AND 2 CARPENTERS
CU.M.
CU.M.
1.64
10.00
L.M.
L.M.
L.M.
L.M.
CU.M.
CU.M.
SQ.M.
CU.M.
2.50
3.34
5.00
6.66
0.21
0.42
0.96
0.11
SQ.M.
SQ.M.
CU.M.
CU.M.
CU.M.
0.1
0.06
3.38
2.00
4.14
CU.M.
2.14
K.
1.32
1.32
1.48
1.64
1.97
2.16
2.3
2.64
4.38
6.58
9.84
13.14
19.7
20.62
24.1
27.38
30.68
32.86
36.14
41.08
0.38
1.48
1.64
1.96
2.16
4"
5"
6"
4.00 LAYING RCP 8 MEN (1 TEAM)
24"
36"
48"
6-18"
LAVATORY
WATER CLOSET
URINAL UTILITY STALL
URINAL PEDESTRAL TYPE
SHOWER AND INSTALL
5 MAN GROUP SHOWER
BAH TUBS
SLOPE SINK
HOT WATER HEATER
16 PERSON WASH SINK
DRINKING FOUNTAIN
EYE WASH
MISC. FIXTURES
PARTITIONS
LAYING OF 24" RCP
LAYING OF 36" RCP
LAYING OF 48" RCP
L.
L.M.
L.M.
L.M.
2.62
3.28
4.92
L.M.
L.M.
L.M.
L.M.
9.00
12.8
21.34
2.66
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
PIPE
PIPE
PIPE
16.00
24.00
48.00
32.00
20.00
72.00
48.00
28.00
28.00
52.00
26.00
16.00
4.00
16.00
8.00
12.80
21.32
S.M.
S.M.
S.M.
S.M.
5.00
24.00
10.00
10.00
TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
M.
S.M.
S.M.
34.00
60.00
FLG.
S.M.
L.M.
EACH
EACH
EACH
EACH
L.M.
L.M.
8.00
1.60
5.40
3.00
16.00
12.00
8.00
7.40
3.00
TRADE:FIRE PROOFING
INSTALL STUDS
INSTALL MESH
EACH
S.M.
1.00
2.40
POURED
FORMING
STRIP FORMS
POUR CONCRETE
CURING/PATCHING
FINISHING
TROWEL, PLASTERED
PNEUMATIC APPLICATION
GUNITE
APPLY FINEBRICK OR BLOCK
REMOVAL OF EXISTING OR OLD FIREPROOFING
APPLY FIREPROOFING PAINT
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR
HOSE REELS AND CARTS
FIRE EXTINGUISHERS
PERSONAL EQUIPMENT:
EYE WASH
SAFETY SHOWERS
BREATHING APPARATUS
SPRINKLER SYSTEM
SPRAY NOZZLES
WATER CANNONS
N.
O.
P.
TRADE:PERMANENT FENCING
INSTALL FENCE
INSTALL GATES
TO RAIL
BARBE WIRE, 3 STRANDS
TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL
OLD STRUCTURAL STEEL
NEW FLAT FLAT PLATES
SURFACE PREPARATION:
IN TERMS OF WEIGHT
IN TERMS OF AREA
SAND PREPARATION
TRADE:HEATING VENTILATING AND CONDITIONING
HEAVY PIPING
DUCT WORK INSTALL
DUCT WORK FAB.
PACKAGE UNIT AIR CONDITIONER
UNIT HEATER
FINNED CONVERTER
EXHAUST FAN PROPELLER
GRAVITY ROOF PAINT
POWER ROOF VENT
ROUND ROOF VENT
S.M.
S.M.
S.M.
S.M.
S.M.
S.M.
28.00
12.00
140.00
1.20
1.40
5.40
S.M.
PC.
S.M.
S.M.
2.40
1.60
5.00
6.00
EACH
EACH
EACH
10.00
30.00
10.00
EACH
EACH
EACH
20.00
20.00
10.00
EACH
EACH
2.00
10.00
L.M.
L.M.
L.M.
L.M.
2.40
6.00
0.60
0.60
TON
S.M.
S.M.
20.00
1.10
0.64
TON
S.M.
TON
16.00
0.86
60.00
L.M.
S.M.
S.M.
EACH
EACH
EACH
EACH
L.M.
EACH
EACH
7.00
12.00
36.00
48.00
24.00
10.00
16.00
14.00
48.00
16.00
PLUMBING PIPING
Q.
MISCELLANEOUS
WATER STOP INSTALLATION
CAULKING SLAB JOINT
ASPHALTING
GROUTNG AND TOOL PLASTERING
WATER PROOFING RUBBERIZED
COPPER CLADDING ROOF DECK
WATER PROOFING FLINKOTE
DEMOLITION OF ADOBE WALL
PAINTING
COPPER WATER STOP CUT AND SHAPE
COPPER WATER STOP CUT AND INSTALLATION
SETTING ANCHOR BOLT
SETTING ANCHOR BOXES
L.M.
7.00
L.M.
L.M.
S.M.
S.M.
S.M.
L.M.
S.M.
CU.M.
S.M.
L.M.
L.M.
KG
CU.M.
1.34
0.40
1.60
3.34
1.10
1.00
0.54
3.20
0.68
11.00
22.00
97.00
3.64
HIGH
2.00
2.35
3.08
2.35
1.60
1.88
2.46
1.88
1.67
3.33
1.34
2.66
9.00
11.00
0.60
6.88
8.80
0.40
1.08
0.86
0.25
1.29
1.03
0.85
0.20
1.03
0.82
0.68
0.83
1.08
0.67
0.86
3.50
2.80
2.80
2.24
1.00
0.14
0.36
0.27
0.97
0.43
0.35
0.80
0.21
0.13
0.27
0.46
0.80
0.11
0.29
0.21
0.77
0.34
0.28
0.64
0.17
0.11
0.10
0.36
1.00
0.42
0.80
0.33
1.33
1.00
0.13
0.18
0.50
7.00
4.50
3.50
1.06
0.90
0.10
0.14
0.40
5.60
3.60
2.80
0.40
2.00
0.32
1.60
4.63
3.12
4.63
3.12
3.38
10.00
12.00
10.00
25.00
0.31
1.60
0.22
0.33
3.12
3.70
2.50
3.70
2.50
2.70
8.00
9.60
8.00
20.00
0.25
1.28
0.18
0.26
2.50
1.67
1.43
2.00
5.00
10.53
4.35
3.00
4.50
4.00
0.50
3.00
2.00
1.20
1.80
9.50
1.14
0.72
1.34
1.34
1.60
4.00
8.42
3.48
2.40
3.60
3.20
0.40
3.40
1.60
0.96
1.44
6.80
0.91
0.57
1.60
1.33
2.00
5.33
1.28
1.06
1.60
4.26
5.97
4.78
1.08
3.06
1.00
9.80
0.51
3.47
0.82
0.53
0.97
0.16
9.00
0.30
0.13
1.80
1.80
8.50
2.00
1.70
0.60
0.86
2.45
0.80
0.64
0.40
2.78
0.66
0.42
1.78
0.13
0.71
0.24
0.11
1.44
1.44
6.80
1.60
1.36
0.48
5.00
25.00
1.00
1.43
4.00
20.00
0.80
1.14
0.07
0.08
0.10
16.00
1.80
0.06
0.06
0.08
12.80
1.44
7.00
14.00
27.00
2.80
5.60
11.20
21.60
2.24
21.00
0.53
0.33
16.80
0.42
0.26
0.60
0.80
1.10
0.48
0.64
0.88
1.20
1.50
0.96
1.20
4.00
6.50
10.50
5.50
8.00
12.00
3.20
5.20
8.40
4.40
6.40
9.60
1.30
18.00
1.04
14.40
0.45
0.55
1.20
0.36
0.44
0.96
0.12
1.80
1.30
1.40
1.50
0.32
1.20
0.32
0.42
0.52
0.60
0.10
1.44
1.04
1.12
1.20
0.26
0.96
0.26
0.34
0.42
0.48
0.42
0.20
0.20
0.34
0.16
0.16
0.42
4.20
0.34
3.36
0.32
0.42
0.52
0.26
0.34
0.42
0.70
0.20
2.00
0.56
0.16
1.60
8.00
1.31
1.64
2.63
6.40
1.05
1.31
2.10
6.67
16.67
5.34
13.34
0.82
5.00
0.66
4.00
1.25
1.67
2.5
3.33
0.11
0.21
0.48
0.06
1
2.34
2
2.66
0.08
0.17
0.38
0.04
0.05
0.03
1.69
1.00
2.07
0.04
0.02
1.35
0.8
1.66
1.07
0.86
0.66
0.66
0.74
0.82
0.98
1.08
1.15
1.32
0.53
0.53
0.59
0.66
0.70
0.86
0.92
1.06
2.19
3.29
4.92
6.57
9.85
10.31
12.05
13.69
15.34
16.43
18.07
20.54
1.75
2.63
3.94
5.26
7.98
8.25
9.64
10.95
12.27
13.14
14.46
16.43
0.19
0.74
0.82
0.98
1.08
0.15
0.59
0.66
0.78
0.86
1.31
1.64
2.46
1.05
1.31
1.97
4.00
6.40
10.67
1.33
3.20
5.12
8.54
1.06
8.00
12.00
24.00
16.00
10.00
36.00
24.00
14.00
14.00
26.00
13.00
9.00
2.00
8.00
4.00
6.40
10.66
6.40
9.60
19.20
12.80
8.00
28.80
19.20
11.20
11.20
20.80
10.40
6.40
1.60
6.40
3.20
5.12
8.53
2.50
12.00
5.00
5.00
2.00
9.60
4.00
4.00
17.00
30.00
13.60
24.00
4.00
0.80
2.70
1.50
8.00
6.00
4.00
3.70
1.50
3.20
0.64
2.16
1.20
6.40
4.80
3.20
2.96
1.20
0.50
1.20
0.40
0.96
14.00
6.00
70.00
0.60
0.70
2.70
11.20
4.80
56.00
0.48
0.56
2.16
1.20
0.80
2.50
3.00
0.96
0.64
2.00
2.40
5.00
15.00
5.00
4.00
12.00
4.00
10.00
10.00
5.00
8.00
8.00
4.00
1.00
5.00
80.00
4.00
1.20
3.00
0.30
0.30
0.96
2.40
0.24
0.24
1.00
0.55
0.32
9.00
44.00
26.00
8.00
30.00
6.40
0.34
24.00
3.50
6.00
18.00
24.00
12.00
5.00
8.00
7.30
24.00
8.00
2.80
4.80
14.40
19.20
9.60
4.00
6.40
5.84
19.20
6.40
3.50
2.80
0.67
0.20
0.80
1.67
0.55
0.50
0.27
1.60
0.34
6.00
11.00
49.00
1.82
0.54
0.16
0.64
0.84
0.28
0.25
0.14
0.80
0.17
0.03
0.06
0.24
0.91
LOW
AVERAGE
HIGH
(METER)
3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8
0.58
0.59
0.60
0.61
0.64
0.22
0.23
0.23
0.24
0.25
0.16
0.16
0.17
0.17
0.18
0.60
0.61
0.64
0.66
0.68
0.23
0.24
0.25
0.25
0.26
0.17
0.17
0.18
0.18
0.19
3 TO 4
4 TO 5
5 TO 6
6 TO 7
7 TO 8
CREW:
1
3
6
10
TOOLS:
ONE LOT CARPENTRY TOOLS
8 TOOLS HOUR
8
24
48
80 MANHOURS
MEDIUM FRAME
HEAVY FRAME
STEEL JOIST
LOW
36.00
32.73
40.00
MAN-HOURS
AVERAGE
13.85
12.63
15.37
CREW:
1
4
4
2
1
6
18
LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS
8
32
32
16
8
48
144 MANHOURS
HIGH
10.00
9.11
11.08
EQUIPMENT-HOURS
LOW
7.00
6.36
7.78
TOOLS:
0.50 TOWER CRANE
2.00 WELDING TRANSFORME
1.00 LOT TOOLS
3.50
LOW
EQUIPMENT-HOURS
LOW
HIGH
46.67
40.00
35.00
43.08
18.06
15.56
13.33
16.47
13.02
11.20
9.66
11.91
18.33
15.71
13.75
16.92
35.00
31.11
35.00
32.94
13.33
11.91
10.77
12.27
9.66
8.62
7.78
9.18
13.75
12.22
13.75
12.94
LEAD MAN
RIGGERS
FITTERS
WELDERS
CRANE OPERATOR
HELPERS
MANDAYS
8
16
32
16
8
32
112 MANHOURS
TOOLS:
0.50
2.00
2.00
1.00
5.50
CARPENTRY TOOLS
TOOLS HOUR
EQUIPMENT-HOURS
AVERAGE HIGH
2.69
1.94
2.46
1.77
2.98
2.15
TOWER CRANE
WELDING TRANSFORMER
LOT TOOLS
4.00
16.00
8.00
28.00 TOOL HOURS
EQUIPMENT-HOURS
AVERAGE HIGH
7.10
6.11
5.24
6.47
5.12
4.40
3.79
4.68
5.24
4.68
4.23
5.00
3.79
3.38
3.06
3.61
4.00
16.00
16.00
8.00
44.00 EQPT. HOURS
PROJECT TITLE:
LOCATION:
ITEM NO.
ESTIMATED QUANTITIES:
A.
MATERIALS:
ITEM OF WORK:
UNIT:
DESCRIPTION
B.
NO.
LABOR/MANPOWER:
C.
NO.
EQUIPMENT/TOOLS:
DESCRIPTION
DESCRIPTION
QTY.
UNIT
UNIT COST
NO.
NO.-DAYS
DAILY RATE
NO.
NO.-DAYS
HOURLY RATE
E
F
G
H
I
AMOUNT
AMOUNT
AMOUNT
PROBABLE OUTPUT
D.
30.00 cu.m./hr.
300.00 sq.m./hr
0.033 hr/m
0.003 hr/m
200.00
25.00
50.00
3.00
0.005
0.040
0.020
0.333
sq.m./hr
cu.m./hr.
cu.m./hr.
sq.m./hr
hr/m
hr/m
hr/m
hr/m
70.00 cu.m./hr.
0.014 hr/m
90.00 cu.m./hr.
0.011 hr/m
700.00 sq.m./hr
300.00 sq.m./hr
40.00 cu.m./hr.
0.001 hr/m
0.003 hr/m
0.025 hr/m
600.00 sq.m./hr
0.002 hr/m
135.00 cu.m./hr.
0.007 hr/m
24.00 cu.m./hr.
0.042 hr/m
240.00 cu.m./hr.
0.004 hr/m
24.00 cu.m./hr.
0.042 hr/m
1,600.00 sq.m./hr
0.001 hr/m
SPRAYING PHALT
8.00 cu.m./hr.
0.125 hr/m
40.00 cu.m./hr.
0.025 hr/m
MANPOWER:
MATERIALS:
300
Trench Excavation
30
m3/hr
232.55
m3/hr
232.55
m3/hr
384.62
m3/hr
303.03
m3/hr
769.23
m3/hr
cavation
29.41 m3/hr
125.00
m3/hr
125.00
m3/hr
142.86
125.00
333.33
m3/hr
769.23 sq.m./hr
m3/hr
588.23 sq.m./hr
m3/hr
1,666.67 sq.m./hr
76.92
m3/hr
115.38
m3/hr
58.82
m3/hr
88.23
m3/hr
166.67
m3/hr
250.00
m3/hr
65.00
MT/hr
32.50
MT/hr
300 SQ.M.
MT
drums