You are on page 1of 2

Beton existent

bmiez (mm2)=

C12/15

Beton camasa

C25/30

500

bcamasa (mm2)=

hmiez (mm2)=

500

hcamasa (mm2)=

700

Eb, miez (N/mm2)=

27000

Eb, camasa (N/mm2)=

31000

Amiez(mm2)=

250000

Acamasa(mm2)=

240000

Beton existent
bmiez (mm2)=
hmiez (mm2)=
Eb, miez (N/mm2)=
Amiez(mm )=
2

C12/15

Beton camasa

700

C25/30

400

bcamasa (mm2)=

600

400

hcamasa (mm2)=

600

27000

Eb, camasa (N/mm2)=

31000

160000

Acamasa(mm )=

200000

tu =

0.0001

Aechiv(mm2)=

490000

Eechiv(N/mm2)=

28959

Rt, echiv (N/mm2)=

1.448

Rc, echiv (N/mm )=

16.88

tu =

0.0001

Aechiv(mm2)=

360000

Eechiv(N/mm2)=

29222

Rt, echiv (N/mm2)=

1.461

Rc, echiv (N/mm )=

17.12

11.26

11.41