Control School, IDT-ONGC

after bleeding
Lower drill string & hang it off on the rams. open Annular BOP
pressure.
Record SIDPP, SICP and Pit gain'

2.5.6 When String ts

out of Hole or Above The BOP On Floating Rig (sub-sea)

a) open fail safe valve on choke line when choke is in close position'
b) Close blind shear ram.
c) Record shut-in pressure & pit gain'

2.6 SHUT IN PRESSURE INTERPRETATION


2.6"1 Shut -in Drill Pipe Pressure (SIDPP)
the hydrostatic
The shut in pressure on the drill stiing side is the difference between
enters during
kick
a
pressure of drilling ftuiO anO the formltion fluid pressure. When
annulus becomes
iritting, the drili string remains uncontaminated whereas
pressure of drilling fluid, the
contaminated with influx. lf slDpp is added to hydrostatic
resultant pressure will be the pressure of the formation
the formation
SIDPP is used to determine the kill mud weight required to balance
.

pressure by using the equation given below

SIDPP(psi)
Kill Mud DensitY (PPg) =

+ original Mud Density(PPg)

0.052 x Well TVD( ft)

gauge on the choke


The shut in drill pipe pressure should be read & recorded from the
of kill mud density' it is
control panel. since tiue slDpp is determined for the calculation
the closure and
recommended to read and record the SIDPP immediately after
sIDPP should be
subsequently after every 3-5 minutes. The recorded values of
the well is closed
tabulatediplotted to ascertained the true value of SIDPP Once
to the formation
initially the SIDPP starls increasing till the BHP .becomes equal
of the
pr"".uru. The time taken for stabiisation depends upon the permeability gas/gas
is
influx
formation. SlDpp may further increase but ai a slower rate if the
mixture.

2.6.2 Shut -in Casing Pressure (SICP)


combined fluid
The shut in pressure in the annulus side is the difference between the
with
contaminated
is
hydrostatic pressures and formation fluid pressure. Since annulus
to
used
can not be
formation fluid (oil, gas, salt waier or combinations) therefore slcP
has
calculate kill mud iensity horryever it is used to cietermine kind of influx which
determine
to
us
entered the well bore. Ouiing kilt ope;ation casing pressure will allow
pressures on the
the pressure being exerted aI various points in the well bore and also
BOP equipment and choke lines.