(Electrical Works)
Item#
Description
I.
Unit
GENERAL REQUIREMENTS
1.0
2.0
3.0
4.0
5.0
II.
Mobilization/Demobilization
Temporary Facilities
Provision for Temporary Supply of Water, Electricity & Telephone
Insurance, Bonds & Permits
As-Built Shop Drawings (CADD Generated)
Total - I
/lot
/lot
/lot
/lot
/lot
ELECTRICAL WORKS
ROUGHING-IN WORKS, CONDUITS, FITTINGS AND SUPPORTS, LABOR IN PLACE
A.
1.0
RSC Pipe
a. 25mm. dia.
b. 32mm dia.
c. 40mm. Dia
d. 50mm. dia.
e. 80mm. dia.
f. 90mm. dia.
2.0 PVC Pipe
a. 20mm. dia.
b. 25mm. dia.
/length
/length
/length
/length
/length
/length
/length
/length
Sub-total II.A
B.
a. 3.5sq.m. THHN/THWN
b. 5.5 sq.m. THHN/THWN
c. 2.0 sq.m. THHN/THWN
d. 14 sq.m. THHN/THWN
/l.m.
/l.m.
/l.m.
/l.m.
Sub-total II.B
C.
1.0 Panel PP
/assy
Sub-total II.C
D.
E.
/pc
/pc
/pc
/pc
/set
/set
/set
/set
h. Exhaust Fan
/set
/set
/set
/set
Sub-total II.E
F.
1.0
2.0
3.0
/set
/set
/set
Sub-total II.F
G.
/lot
Sub-total II.L
H.
a. Conduit Fittings
b. Hanger & Supports
/lot
/lot
Sub-total II.M
Total II
GRAND TOTAL
ill Quantities
QTY
Unit Cost
1.00
1.00
1.00
1.00
50,000.00
15,000.00
20,000.00
30,000.00
1.00
10,000.00
Amount
50,000.00
15,000.00
20,000.00
30,000.00
10,000.00
125,000.00
2.00
173.00
2.00
1,228.00
1,677.00
1,887.00
2,305.00
5,128.00
6,706.00
80.60
122.10
2,456.00
13,943.80
244.20
16,644.00
413.00
130.00
632.00
30.00
19.34
29.59
46.74
73.68
7,988.25
3,847.09
29,537.78
2,210.49
43,583.61
1.00
33,000.00
33,000.00
33,000.00
45.00
34.00
2.00
2.00
51.00
62.00
87.00
1,200.00
2,295.00
2,108.00
174.00
2,400.00
6,977.00
738.00
1,372.00
1,072.00
7,567.00
1,215.00
-
6.00
7.00
4.00
23.00
123.00
196.00
268.00
329.00
4.00
303.75
233.00
2,059.00
1.00
3,000.00
3,000.00
14,964.00
49.00
4.00
2.00
377.00
3,122.00
1,500.00
18,473.00
12,488.00
3,000.00
30,961.00
1.00
30,000.00
30,000.00
30,000.00
1.00
1.00
20,000.00
30,000.00
20,000.00
30,000.00
50,000.00
226,129.61
351,129.61