You are on page 1of 1

F.F.L +36.

888
1.

08/09/2014

REDUCE DROP TO 50MM FROM BASEMENT 2A TO GROUND LEVEL

2.

08/09/2014

ADD A STEP AT GROUND LEVEL

TOP OF ROOF
F.F.L +178.27

LEVEL 3A MEZZANINE

F.F.L +35.30

S.S.L +35.200

F.F.L +33.888

WALKWAY

LEVEL 3A

F.F.L +32.30

F.F.L +32.25

S.S.L +32.200

F.F.L +30.40

HAKCIPTA TERPELIHARA
Semua rekaan adalah hakmilik RDA Harris Architect Sdn. Bhd. dan tidak boleh diguna atau ditiru tanpa
kebenaran bertulis daripadanya dan mestilah dikembalikan selepas selesai projek tersebut. Kontraktor
hendaklah mengikut segala spesifikasi lukisan ini. Ukiran mestilah diperiksa di tapak binaan, sebarang
perbazaan yang terdapat hendaklah dilaporkan kepada arkitek sebelum sebarang kerja pembinaan dimulakan.

CADANGAN MEMBINA DAN MENYIAPKAN 2 BLOK 27 TINGKAT


SOHO, DAN 28 TINGKAT PANGSAPURI SERVIS DI ATAS LOT
PT 294, BANDAR SUNWAY, PJS7, MUKIM PETALING, DAERAH
PETALING, SELANGOR DARUL EHSAN.

CAR PARK

PODIUM 3A LEVEL

F.F.L +28.50

F.F.L +28.45

FLAT ROOF

S.S.L +28.400

LMR

F.F.L +170.30

F.F.L +170.25

S.S.L +170.200

UNTUK TETUAN:
DK-MY PROPERTIES SDN. BHD.

F.F.L +27.182

PODIUM 3 LEVEL
S.S.L +26.900

F.F.L +168.888

CAR PARK
F.F.L +25.70

PODIUM 2A LEVEL

F.F.L +25.65

S.S.L +25.600

LEVEL 26 MEZZANINE

F.F.L +167.30

S.S.L +167.200

F.F.L +24.382

PODIUM 2 LEVEL
S.S.L +24.100

F.F.L +165.888

CAR PARK
F.F.L +22.90

PODIUM 1A LEVEL

................................................................

LEMBAGA
ARKITEK
MALAYSIA

F.F.L +22.85

S.S.L +22.800

AR. ABDUL HARIS OTHMAN


ARKITEK PROFESIONAL
No Pendaftaran: A/A 63

F.F.L +21.535

F.F.L +45.888

PODIUM 1 LEVEL
S.S.L +21.300

ARCHITECTS SDN BHD

RDA-Harris Architects Sdn Bhd


259, Jalan Ampang,
50450, Kuala Lumpur,
Malaysia.
Tel : +603.4256.9906
Fax : +603.4253.2705
Email : rdaharis@streamyx.com

CAR PARK
F.F.L +20.00

MEZZANINE A LEVEL

F.F.L +19.95

S.S.L +19.900

HALLWAY

LEVEL 6

F.F.L +44.30

F.F.L +44.25

S.S.L +44.200

F.F.L +18.635

MEZZANINE LEVEL

F.F.L +42.888

S.S.L +18.400

GROUND LEVEL
(SOHO)

DRIVEWAY

CAR PARK
F.F.L +17.10

F.F.L +17.05

F.F.L +17.05

S.S.L +17.000

LEVEL 5 MEZZANINE

F.F.L +41.30

S.S.L +41.200

GROUND LEVEL
(SERVICE APT)

F.F.L +15.688
F.F.L +39.888

S.S.L +15.500

FAN ROOM

BASEMENT 1A

CAR PARK
F.F.L +14.10

F.F.L +14.05

HALLWAY

F.F.L +14.05

S.S.L +14.000

LEVEL 5

F.F.L +38.30

F.F.L +38.25

S.S.L +38.200

F.F.L +12.688

STAIR 1 DETAIL -3 (SECTION)

F.F.L +36.888

DETAIL 1
FAN ROOM

BASEMENT 2A
S.S.L +11.000

F.F.L +11.05

CAR PARK
F.F.L +11.10

RDAI

1 : 50

DANNY

08/09/2014

F.F.L +11.05

LEVEL 3A MEZZANINE
S.S.L +35.200

F.F.L +35.30

STAIR 1 DETAIL - 3 (SECTION)


1 : 50

DTL CD
NO. PROJEK:

CONSTRUCTION DRAWING

RDAI-13-900-003

202

You might also like