Professional Documents
Culture Documents
2000 XC70 VVT Replacement Procedure PDF
2000 XC70 VVT Replacement Procedure PDF
1(10)
"VCC-097794 EN 2011-05-21"
Remove:
- the right front wheel.
- the nuts for the cover in the fender liner.
Install the upper camshaft belt cover.
2(10)
"VCC-097794 EN 2011-05-21"
3(10)
"VCC-097794 EN 2011-05-21"
Reinstall
Install the variable valve timing (VVT) unit with
the toothed belt pulley:
4(10)
"VCC-097794 EN 2011-05-21"
5(10)
"VCC-097794 EN 2011-05-21"
6(10)
"VCC-097794 EN 2011-05-21"
Reinstall
Install:
- the front camshaft belt cover.
Tighten to 12 Nm.
Nm
- the upper camshaft belt cover.
Tighten to 8 Nm.
Nm
- the auxiliaries belt.
- the cable duct. 3 nuts.
- the expansion tank.
- the servo reservoir.
Wipe clean.
Check the level and top up as necessary.
Note! Check that the hoses are correctly
positioned.
7(10)
"VCC-097794 EN 2011-05-21"
8(10)
"VCC-097794 EN 2011-05-21"
9(10)
"VCC-097794 EN 2011-05-21"
Remove
- the upper camshaft belt cover.
- the connector for the control valve.
- the screws retaining the valve.
- the valve and the gasket.
Wipe clean.
10(10)