Professional Documents
Culture Documents
TheFPSOKakapNatunaisinstalledatKakapKHfield,
approximately175mileswestofGreatNatunaIslandinthe
NationSea,offshoreIndonesia.
TheFPSOinitiallystartedoutproducing8,000barrelsofoilper
dayfrom3wells.Productionwellswerelaterexpandedtotenfor
atotalofapproximately25,000barrelsofoilperday.
TheFPSOKakapNatunaconsistsofapipelineendmanifold
(PLEM)connectedbyaflexiblerisertoacatenaryanchorleg
mooring(CALM)system,attachedtothesternbyrigiddelta
frameyoke.
ScopeofWork
Engineering
Procurement
Construction
Installation
UnitName
FPSOKakapNatuna
Contract
EPCI+BareBoatCharter(Ownershipwastransferredtotheclient)
FirstOil
April1986
Client
MarathonPetroleumIndonesiaLtd.
Status
Sold
FieldName
KakapKHField
Country
Indonesia
WaterDepth
88m(288ft)
New/Conv
Conversion
MooringType
CALMRigidYoke
StorageCapacity
760,000bbls
OilProduction
25,000bopd
GasProduction
25mmscfd
WaterProduction
60,000bwpd
CopyrightMODEC,Inc.Allrightsreserved.