A. OB Removal
Unit / Nomor

Shift I

Lokasi

Material

Distance

OB, bcm

Fuel

HM

PC 300

Ltr/jam

Prod'ty

Keterangan

Lokasi

Material

Distance

Shift II
OB, bcm

Fuel

DAILY
HM

Coal, Mt

Fuel

Keterangan

OB, bcm

Prod'ty

HM

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!

0.0

0.0

#DIV/0!

#DIV/0!
0.0

Ltr/jam

#DIV/0!

#DIV/0!
0.0

Prod'ty

0.0

0.0

Ltr/bcm

MTD

YTD

1,831.2

108,111.8

#DIV/0!

BBM

0.0

Ltr/Bcm

B. Coal Mining
Unit / Nomor

Shift I
Lokasi

Material

Distance

Shift I I
HM

PC 300

Keterangan

Prod'ty

Lokasi

Material

Distance

Coal, Mt

Fuel

DAILY
HM

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
PC 200

201

C4

254.0

Prod'ty

#DIV/0!

10.0

0.00

Estafet OB

254.0

Keterangan

Coal, Mt

HM

MTD

Prod'ty

0.0

Ltr/coal

YTD

0.0

17,139.60

#DIV/0!

BBM

#DIV/0!

#DIV/0!

0.0

#DIV/0!

#DIV/0!

0.0

0.0

0.0

Ltr/Coal

0.0

1,391.0

#DIV/0!

C. SUPPORT UNIT
Unit / Nomor
DZ01

Shift I
HM

BD(hrs)

10.0

Shift II

Fuel

Keterangan

HM

250

Scarp Jalan OB

5.0

BD(hrs)

Fuel

Keterangan

230

Dossing OB

LOST TIME (Hrs)

Type Unit
PC 300

Start engine delay

Meal/Over shift

0.25

1.00

301

M. unit

BD

OB LOST by Time (Bcm)

Shift I
Mulai

Stop

0.1

10.00

D 85 SS

MG 511

Cuaca

Hujan

GD01

9.0

302
303
201

Scrap Jalan OB

250

230

PC 200

OB LOST by Rain (Bcm)


11.88

TOTAL

1.00

0.25

0.00

10.00

7:00

OB LOST by Idle (Bcm)

C. DUMP TRUCK
Unit / Nomor

EXC

Shift I
Ritase
BD (hrs)

PC

OB dump to Displ
OB dump to Displ

31.0
27.0

6.0
5.0

M-05

0.0

0.0

M-06

0.0

0.0

Operation

Keterangan

OB

250

32

6.0

OB dump to Displ

M-02

EX-301

PIT-1

OB

250

31

6.0

M-03
M-04

EX-302
EX-301

PIT-1
PIT-1

OB
OB

250
250

31
27

6.0
5.0

OB/Rit

BD (hrs)

Operation

Keterangan

Rit

Jam

Mulai

EX-303

PIT-1

OB

H-09
H-10

EX-303

PIT-1

OB

H-11

EX-303

PIT-1

OB

250

250

48

250

45

1,750

267.0

D. Hauling
From

53

7.0

OB dump to Displ

7.0

OB dump to Displ

7.0

OB dump to Displ

0.0

0.0

Rate

Coal Type

Tonage

Barge

Buyer

Disiapkan,
Inter'diate

Jetty

Keterangan
-

H. Support Facilities
Unit
Fuel

LIMONITE

Ship
Commence Complete

Diperiksa,

Tonage
(MT)

Diketahui,

Karyawan

0.00

6.00
0.00
0.00

Shift I :

Vol. mm

mm
Hujan

Shift II :

Scrap

3 mm
Kabut

Total

Berdebu

3 mm

Lain-lain

MTD

Penggunaan BBM Solar

7.0 STOCK AWAL


0.0 MASUK

7.0 PEMAKAIAN HARI INI


0.0 STOCK AKHIR
7.0
LITER / BCM
44.0
LITER / Coal

Shift I I

1 orang

orang

Foreman
Opt. Exca

orang
4 orang

orang
orang

Opt. Dozer
Checker
Mekanik
Helper
Fuelman

1
1
2
3
1

Pumpman
Dumpman

Ltr
Ltr
Ltr

Total

Ltr
Ltr
Ltr

Shift I

Supervisor

Ltr
Ltr

Ltr
Ltr

Total

(Jam)

Shift I
7,690
3,000

1,391
9,299
#DIV/0!

3
Daily
Shift II
9,299

9,299
#REF!

Total
7,690
3,000

1,391
9,299
#REF!

Rental
9,299

9,299

F. Man Power

Tug Boat

G. Stock
Rom

48.0
0.0
45.0
267.0

0.0

E. Shipment
To

Coal Type
NIKEL

53.0
0.0

Total/Hari
Jam

0.00

#VALUE! #VALUE! #VALUE!

H-07
H-08

Stop

0.00

OB dump to Displ

Jarak

PIT-1

Jarak

Kabut

TOTAL

Shift I I

Lokasi

Berdebu
6.0 Int Curah Hujan
6.0

Material

EX-302

Jam

0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00

32.0
31.0

Lokasi

M-01

13:00

Scrap

Shift II

orang
orang
orang
orang
orang

1 orang
orang
orang
orang
orang

2 orang
orang

orang
orang

15 orang

1 orang

Catatan :
> Shift 1 (siang) :

> Pemblokiran jalan access tambang dari pendemo pukul 09:00 13:00, mengakibatkan terhambatnya supply makanan ke lapangan

> Shift 2 (Malam) :

PT. Prima Energy Services

Kepada

: CV. Bunda Kandung

Job Site CV. Bunda Kandung - Des. Paring Lahung Kal-Teng

Up.

Kepada

LAPORAN HARIAN (Daily Report)


Hari :

Senin

Tgl

: Bpk Mustopa A

: Timbul K

: Bpk Timothy SS

: Bpk. Ramly

: Bpk. Indra Imihardja

01 Maret 2011

A. OB Removal
Unit / Nomor

PC 300

Shift I
Lokasi

Material

Shift I I

Distance

OB, bcm

Fuel

HM

Prod'ty

Ltr/jam

Keterangan

301

C4

250

750.0

350.0

8.0

93.75

44

Estafet 5 hrs

302

C4

OB

250

750.0

372.0

8.0

93.75

47

Estafet 5 hrs

303

C4

OB

250

9.0

36.80

36

331.2

321.0

1,831.2

1,043.0

Coal, Mt

Fuel

Lokasi

Material

Distance

OB, bcm

Fuel

DAILY
HM

Prod'ty

Ltr/jam

Keterangan OB, bcm

#DIV/0!

0.0

0.0

Prod'ty

HM

750.0

8.0

93.8

750.0

8.0

93.8

331.2

9.0

36.8

Ltr/bcm

MTD

YTD

1,831.2
0.80

108,111.8
BBM

1,831.2

Ltr/Bcm

B. Coal Mining
Unit / Nomor

Shift I
Lokasi

Material

Distance

Shift I I
HM

Lokasi

Material

Distance

Coal, Mt

Fuel

DAILY
HM

Prod'ty

Keterangan

Coal, Mt

#DIV/0!

PC 300
PC 200

Keterangan

Prod'ty

C4

9.0

0.00

Prod'ty

0.0

#DIV/0!

201

HM

0.0

YTD

0.0

17,139.60
BBM

#DIV/0!

0.0

General work

MTD

#DIV/0!

0.0

0.0

Ltr/coal

0.0

Ltr/Coal

0.0

1,469.0

#DIV/0!

C. SUPPORT UNIT
Unit / Nomor

Shift I
HM

BD(hrs)

Shift II

Fuel

Keterangan

DZ01

8.0

291

Scarp Jalan OB

MG 511 GD01

4.0

135
426

Scrap Jalan OB

D 85 SS

HM

BD(hrs)

Fuel

Keterangan

Start engine delay

Meal/Over shift

0.25

1.00

301
302
303
201

PC 300
0

LOST TIME (Hrs)

Type Unit

PC 200

M. unit

BD

OB LOST by Time (Bcm)

OB LOST by Rain (Bcm)

EXC

Shift I
Ritase
BD (hrs)

1.00

0.25

0.00

10.00

OB LOST by Idle (Bcm)

PC

TOTAL

Shift I I

Lokasi

Operation

Keterangan

FM 320

H-07
H-08
H-09
H-10
H-11

EX-303

PIT-1

OB

250

16

3.0

OB dump to Displ

EX-303

PIT-1

OB

250

16

3.0

OB dump to Displ

EX-303

PIT-1

OB

250

16

3.0

OB dump to Displ

750

48.0

D. Hauling
From

0.0

To

Rate

Coal Type

Tonage
0

Barge

Buyer

Disiapkan,
Inter'diate
Rom
364.32

Keterangan
Jetty
7,900.95

H. Support Facilities
Unit
Fuel
LV-01/PES
LV-02/PES
LV-03/PES
LV-04/PES
LT-01
LT-02
MP-01
FT-01
Genset
Total

16.0
0.0
16.0
0.0
16.0
48.0

0.0

Stop

0.00
0.50
0.00
6.00

Total/Hari
Jam

(Jam)

0.00

0.50

Kabut

0.00
0.00
Shift II :

Vol. mm

mm
Hujan

Scrap

15.5 mm
Kabut

15.5

0.5

Shift I :

Penggunaan BBM Solar

3.0 STOCK AWAL


0.0 MASUK
3.0 PEMAKAIAN HARI INI
0.0 STOCK AKHIR
3.0
LITER / BCM
9.0
LITER / Coal

Shift I
9,159

Daily
Shift II
7,690

1,469
7,690
0.80

7,690
#REF!

Total

Berdebu

Total
9,159
0
1,469
7,690
#REF!

15.5 mm

Lain-lain

Rental
7,690
7,690

F. Man Power

Tug Boat

G. Stock
Coal Type
Clean Coal
Dirty Coal

0.0

E. Shipment

Jam

Mulai

6.00

0.0

Rit

Shift II
Jam

Scrap

0.0

Keterangan

BD (hrs)

13:00

M-06

Operation

OB/Rit

7:00

M-02
M-03
M-04
M-05

Jarak

Jarak

18:00

0.0
0.0
0.0
0.0
0.0

Material

Stop

17:30

Berdebu
0.0 Int Curah Hujan
0.0
0.0
MTD
0.0
0.0

Lokasi

M-01
MAN TGA
40.480

Hujan

12.87

TOTAL

Shift I
Mulai

0.1

10.00

C. DUMP TRUCK
Unit / Nomor

Cuaca

Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr

Temy Hardiansyah

Ship
Commence Complete

Diperiksa,

Tonage (MT)

Diketahui,

Karyawan

Shift I

Supervisor
Foreman
Opt. Exca

1 orang
orang
4 orang

Opt. Dozer
Checker
Mekanik
Helper
Fuelman
Pumpman
Dumpman
Total

1
1
2
3
1
2

orang
orang
orang
orang
orang
orang
orang
15 orang

Shift I I
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang
orang

Catatan :
> Shift 1 (siang) :

> Shift 2 (Malam) :

> Tanggal 28 Februari sore s/d malam, hujan turun pukul 17:30PM s/d 21
> Unit Produksi 3 fleet dan 3 DT

T. HIJAU DAUN MAS


4, Kepulauan
Simpang Senggarang
- Tanjun
Riau - Indonesia
Front Area

5,000 m

Thickness

2.0 m

Nikel (mt)

14,000 mt Working D

31 Days

Limonite (mt12,600 mt Hours/Day

8 Hours

PLAN
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Nikel (mt)

Limonite
(mt)

451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
451.61
14,000.00

406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
406.45
12,600.00

Reported by,

ACTUAL

Cumm.

Cumm.

Clean, mt

Dirty, mt

406.45
812.90
1,219.35
1,625.81
2,032.26
2,438.71
2,845.16
3,251.61
3,658.06
4,064.52
4,470.97
4,877.42
5,283.87
5,690.32
6,096.77
6,503.23
6,909.68
7,316.13
7,722.58
8,129.03
8,535.48
8,941.94
9,348.39
9,754.84
10,161.29
10,567.74
10,974.19
11,380.65
11,787.10
12,193.55
12,600.00

451.61
903.23
1,354.84
1,806.45
2,258.06
2,709.68
3,161.29
3,612.90
4,064.52
4,516.13
4,967.74
5,419.35
5,870.97
6,322.58
6,774.19
7,225.81
7,677.42
8,129.03
8,580.65
9,032.26
9,483.87
9,935.48
10,387.10
10,838.71
11,290.32
11,741.94
12,193.55
12,645.16
13,096.77
13,548.39
14,000.00

Checked by,

NIKEL ORE MINI


Day Shift
Rate
Tonnage
57
84
109
166
188
218
28
29
30

909

1,076.00
1,624.00
2,100.00
3,048.00
3,536.00
3,984.00
544.00
348.00
456.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,716.00

Night Shift
Rate

Regards by,
DIRTY
CLEAN

Temy Hardiansyah
Data Processing

Asep Ruskandar
Mine Plan

Sites Manager

BARGING

anjungpinang
sia
ACTUAL

IKEL ORE MINING


Night Shift
Tonnage

Err:508

Total
1,076.00
1,624.00
2,100.00
3,048.00
3,536.00
3,984.00
544.00
348.00
456.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,716.00

Fuel Ratio ETD' DIRTY


Fuel (liter)
NIKEL AT
FRONT
Cumm, mt
Ltr/ton
1,076.00
2,700.00
4,800.00
7,848.00
11,384.00
15,368.00
15,912.00
16,260.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
16,716.00
0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(2,716.00)

FRONT TO STOCK PILE I


Rate

Tonnage

57
84
109

1,076.00
1,624.00
2,100.00
0.00
2,048.00
3,004.00
544.00
348.00
456.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11,200.00

108
157
28
29
30

602

Front Loading

Yearly Production & Shipment


May
###

June

July

Aug

#REF!

YTD
#REF!

###

10,732.37

Dirty
Plan
Actual
Ach'ment

May
3,361.00

June
20,295.71

July

Aug

YTD
23,656.71

YTD

14,000.0
16,716.0
119%
108,111.8

MONTHLY NIKEL PRODUCTION REPORT


FRONT : ____________________________
HAULING NIKEL

TOCK PILE I

FRONT TO STOCK PILE II

Cumm, ton
1,076.00
2,700.00
4,800.00
4,800.00
6,848.00
8,717.55
7,074.55
5,919.55
5,430.55
5,430.55
2,791.75
2,071.75
280.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75
55.75

Rate

80
61

Err:508

t Loading

Tonnage

Cumm, ton

0.00
0.00
0.00
0.00
1,339.20
882.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:508

0.00
0.00
0.00
0.00
1,339.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20
2,221.20

FRONT TO STOCK PILE III


Rate

Tonnage

103
243
167
105

1,134.45
2,187.00
1,503.00
945.00

256
80
199
25

2,638.80
720.00
1,791.00
225.00

Err:508

Err:508

Bauxite Stock

Clean

A + B (CLEAN STO

Cumm, ton

Total Clean
Bauxite
0.00
0.00
0.00
0.00
1,339.20
2,016.45
2,187.00
1,503.00
945.00
0.00
2,638.80
720.00
1,791.00
225.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:508

Weekly Plant

Barging

Dirty Stock

12,600.00
13,365.45

12,600.00

3,177.45 mt

13,365.45

Clean Stock
Jetty MOCO

###

3,161.29

106%

106%

Jetty T. PAGI

0.00 mt

3,161.29

ETD Clean Bauxite at Front -1,901.2 mt


Total
###

3,161.29

25,196.86

17,807.74

PLAN

55.75
DIRTY

4,516.13
14,000.00

PORT
___

+ B (CLEAN STOCK 90%)


Cumm, ton
1,500.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

FRONT TO STOCK PILE IV


Rate

Tonnage

0.00
0.00
0.00
0.00
0.00
0.00
1,101.00
1,101.00
1,820.00
2,921.00
1,060.00
3,981.00
1,820.00
5,801.00
1,870.00
7,671.00
1,517.00
9,188.00
1,420.00
10,608.00
1,080.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00
11,688.00 11,688.00

53
91
53
91
91
74
71
54

578

Weekly Plant
PLAN
CLEAN

Cumm, mt

ACTUAL
DIRTY

CLEAN

9,852.00

5,542.65

1,348.00

7,822.80

11,200.00

.00
.00
13,365.45

STOCK PILE
JETTY
MOCO

BARGING

Ton

Tonnage

Rate

9,237.00
9,237.00
9,237.00
9,237.00
9,237.00
9,237.00
9,237.00
10,338.00
12,158.00
13,218.00
15,038.00
16,908.00
18,425.00
19,845.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00
20,925.00

Err:508

HAULING TRA

JETTY MOCO TO JETT

T. HIJAU DAUN MAS


4, Kepulauan
Simpang Senggarang
- Tanjun
Riau - Indonesia
Front Area

20,000 m2 Thickness

1.5 m

Dirty Plan
Clean Plan

42,000 mt Working D
37,800 mt Hours/Day

31 Days
8 Hours

PLAN
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Dirty
Bauxite
(mt)

Clean
Bauxite
(mt)

1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
1,354.84
42,000.00

1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
1,219.35
37,800.00

Reported by,

ACTUAL

Cumm.

Cumm.

Clean, mt

Dirty, mt

1,219.35
2,438.71
3,658.06
4,877.42
6,096.77
7,316.13
8,535.48
9,754.84
10,974.19
12,193.55
13,412.90
14,632.26
15,851.61
17,070.97
18,290.32
19,509.68
20,729.03
21,948.39
23,167.74
24,387.10
25,606.45
26,825.81
28,045.16
29,264.52
30,483.87
31,703.23
32,922.58
34,141.94
35,361.29
36,580.65
37,800.00

1,354.84
2,709.68
4,064.52
5,419.35
6,774.19
8,129.03
9,483.87
10,838.71
12,193.55
13,548.39
14,903.23
16,258.06
17,612.90
18,967.74
20,322.58
21,677.42
23,032.26
24,387.10
25,741.94
27,096.77
28,451.61
29,806.45
31,161.29
32,516.13
33,870.97
35,225.81
36,580.65
37,935.48
39,290.32
40,645.16
42,000.00

Checked by,

BAUXITE MININ
Day Shift
Rate
Tonnage

19

93
45
78
51
71

357

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00
0.00
0.00
0.00
1,812.00
900.00
1,560.00
0.00
1,020.00
0.00
1,350.00
0.00
0.00
0.00
0.00
0.00
0.00
7,022.00

Night Shift
Rate

Regards by,
DIRTY
CLEAN

Temy Hardiansyah
Data Processing

Asep Ruskandar
Mine Plan

Sites Manager

BARGING

anjungpinang
sia
ACTUAL

BAUXITE MINING
Night Shift
Tonnage

Err:508

Fuel (liter)
Total

Cumm, mt

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00
0.00
0.00
0.00
1,812.00
900.00
1,560.00
0.00
1,020.00
0.00
1,350.00
0.00
0.00
0.00
0.00
0.00
0.00
7,022.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00
380.00
380.00
380.00
2,192.00
3,092.00
4,652.00
4,652.00
5,672.00
5,672.00
7,022.00
7,022.00
7,022.00
7,022.00
7,022.00
7,022.00
7,022.00
0

Fuel Ratio ETD' DIRTY


BAUXITE
AT FRONT
Ltr/ton
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
#DIV/0!
#DIV/0!
#DIV/0!
0.0
0.0
0.0
#DIV/0!
0.0
#DIV/0!
0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
34,978.00

FRONT TO DIRTY STOCK


Rate

19

93
45
78
51
71

357

###

June

July

Aug

#REF!

YTD
#REF!

###

10,732.37

Dirty
Plan
Actual
Ach'ment

May
3,361.00

June
20,295.71

July

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00
0.00
0.00
0.00
1,812.00
900.00
1,560.00
0.00
1,020.00
0.00
1,350.00
0.00
0.00
0.00
0.00
0.00
0.00
7,022.00

Front Loading

Yearly Production & Shipment


May

Tonnage

Aug

YTD
23,656.71

YTD

42,000.0
4,958.0
12%
108,111.8

MONTHLY BAUXITE PRODUCTION REPORT - PERIODE AUGUS


FRONT V (ASLAWIYAH) - WACOPEK
HAULING BAUXITE

IRTY STOCK

FRONT TO WBX / A

Cumm, ton

DIRTY STOCK TO WBX / B

Rate

Tonnage

Cumm, ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Err:508

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:508

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
380.00
380.00
380.00
380.00
2,192.00
3,092.00
4,652.00
4,652.00
5,672.00
5,672.00
7,022.00
7,022.00
7,022.00
7,022.00
7,022.00
5,774.00
4,958.00

t Loading

Rate

102
67
Err:508

Tonnage

1,248.00
816.00
Err:508

Bauxite Stock

Clean

Barging

37,800.00
2,064.00
5%
25,196.86

37,800.00

Dirty Stock

A + B (CLEAN STO

Cumm, ton

Total Clean
Bauxite
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,248.00
816.00
Err:508

Weekly Plant
PLAN

4,958.00
DIRTY

2,844.00 mt

2,064.00

Clean Stock
Jetty MOCO

720.00 mt

9,483.87

5%

Jetty T. PAGI

0.00 mt

9,483.87

ETD Clean Bauxite at Front 24,484.6 mt


Total
###

9,483.87

17,807.74

13,548.39
42,000.00

ODE AUGUST 2011


EK

+ B (CLEAN STOCK 90%)


Cumm, ton
1,500.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

WBX TO JETTY MOCO


Rate

44
4
48

CLEAN

Tonnage

Rate

660.00
60.00
720.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
660.00
720.00
720.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
660.00
720.00
720.00

Err:508

.00

.00

3,930.00
7,022.00

JETTY MOCO TO JETT

Ton

CLEAN

3,092.00

HAULING TRA

Cumm, mt

ACTUAL
DIRTY

BARGING

Tonnage

Weekly Plant
PLAN

STOCK PILE
JETTY
MOCO

.00
2,064.00
2,064.00

T. HIJAU DAUN MAS


4, Kepulauan
Simpang Senggarang
- Tanjun
Riau - Indonesia
Front Area

3,000 m

Thickness

1.0 m

Dirty Plan
Clean Plan

4,200 mt
3,780 mt

Working D
Hours/Day

31 Days
8 Hours

PLAN
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Dirty
Bauxite
(mt)
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
135.48
4,200.00

Reported by,

Clean
Bauxite
(mt)
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
121.94
3,780.00

ACTUAL

Cumm.

Cumm.

Clean, mt

Dirty, mt

121.94
243.87
365.81
487.74
609.68
731.61
853.55
975.48
1,097.42
1,219.35
1,341.29
1,463.23
1,585.16
1,707.10
1,829.03
1,950.97
2,072.90
2,194.84
2,316.77
2,438.71
2,560.65
2,682.58
2,804.52
2,926.45
3,048.39
3,170.32
3,292.26
3,414.19
3,536.13
3,658.06
3,780.00

135.48
270.97
406.45
541.94
677.42
812.90
948.39
1,083.87
1,219.35
1,354.84
1,490.32
1,625.81
1,761.29
1,896.77
2,032.26
2,167.74
2,303.23
2,438.71
2,574.19
2,709.68
2,845.16
2,980.65
3,116.13
3,251.61
3,387.10
3,522.58
3,658.06
3,793.55
3,929.03
4,064.52
4,200.00

Checked by,

BAUXITE MININ
Day Shift
Rate
Tonnage

124
62
62

143
81
84

117
24
697

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
1,030.00
0.00
980.00
0.00
0.00
2,425.50
1,316.00
0.00
1,416.00
0.00
0.00
0.00
0.00
0.00
2,020.00
480.00
0.00
11,447.50

Night Shift
Rate

Regards by,
DIRTY
CLEAN

Temy Hardiansyah
Data Processing

Asep Ruskandar
Mine Plan

Sites Manager

BARGING

anjungpinang
sia
ACTUAL

BAUXITE MINING
Night Shift
Tonnage

Err:508

Fuel (liter)
Total

Cumm, mt

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
1,030.00
0.00
980.00
0.00
0.00
2,425.50
1,316.00
0.00
1,416.00
0.00
0.00
0.00
0.00
0.00
2,020.00
480.00
0.00
11,447.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
2,810.00
2,810.00
3,790.00
3,790.00
3,790.00
6,215.50
7,531.50
7,531.50
8,947.50
8,947.50
8,947.50
8,947.50
8,947.50
8,947.50
10,967.50
11,447.50
11,447.50
0

Fuel Ratio ETD' DIRTY


BAUXITE
AT FRONT
Ltr/ton
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
(7,247.50)

FRONT TO DIRTY STOCK


Rate

Tonnage

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Front Loading

Yearly Production & Shipment


May
###

June

July

Aug

#REF!

YTD
#REF!

###

10,732.37

Dirty
Plan
Actual
Ach'ment

May
3,361.00

June
20,295.71

July

Aug

YTD
23,656.71

YTD

4,200.0
0.0
0%
108,111.8

MONTHLY BAUXITE PRODUCTION REPORT - PERIODE AUGUS


FRONT VI (HASAN DAUD) - SEI TOCA
HAULING BAUXITE

IRTY STOCK

FRONT TO WBX / A

Cumm, ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate

124
62
62

143
81
84

117
24
Err:508

t Loading

Tonnage

Cumm, ton

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
515.00
0.00
490.00
0.00
0.00
1,212.75
658.00
0.00
708.00
0.00
0.00
0.00
0.00
0.00
1,010.00
240.00
0.00
Err:508

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
1,405.00
1,405.00
1,895.00
1,895.00
1,895.00
3,107.75
3,765.75
3,765.75
4,473.75
4,473.75
4,473.75
4,473.75
4,473.75
4,473.75
5,483.75
5,723.75
5,723.75

DIRTY STOCK TO WBX / B


Rate

Err:508

Tonnage

Err:508

Bauxite Stock

Clean
3,780.00
5,723.75
151%
25,196.86

Barging
3,780.00

Dirty Stock

A + B (CLEAN STO

Cumm, ton

Total Clean
Bauxite
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
515.00
0.00
490.00
0.00
0.00
1,212.75
658.00
0.00
708.00
0.00
0.00
0.00
0.00
0.00
1,010.00
240.00
0.00
Err:508

Weekly Plant
PLAN

5,723.75

Clean Stock
Jetty MOCO

4,826.00 mt

948.39

151%

Jetty T. PAGI

0.00 mt

948.39

ETD Clean Bauxite at Front -5,073.3 mt


Total
650.50 mt

948.39

17,807.74

897.75 mt

DIRTY

1,354.84
4,200.00

ODE AUGUST 2011


OCA

+ B (CLEAN STOCK 90%)


Cumm, ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

CLEAN

BARGING

Cumm, mt

Ton

Tonnage

Rate

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,460.00
2,390.00
3,510.00
3,510.00
3,510.00
4,826.00
4,826.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,460.00
2,390.00
3,510.00
3,510.00
3,510.00
4,826.00
4,826.00

Err:508

WBX TO JETTY MOCO


Rate

Tonnage

78
48
60

1,460.00
930.00
1,120.00

69
255

1,316.00
4,826.00

Weekly Plant
PLAN

STOCK PILE
JETTY
MOCO

ACTUAL
DIRTY

CLEAN
-

.00

890.00

2,875.75

0.00

1,958.00
5,723.75

HAULING TRA

JETTY MOCO TO JETT

T. HIJAU DAUN MAS


4, Kepulauan
Simpang Senggarang
- Tanjun
Riau - Indonesia
Front Area

200,000 m Thickness

2.0 m

Dirty Plan
Clean Plan

560,000 mt Working D
504,000 mt Hours/Day

31 Days
8 Hours

PLAN
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Dirty
Bauxite
(mt)

Clean
Bauxite
(mt)

18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
18,064.52
16,258.06
560,000.00 504,000.00

Reported by,

ACTUAL

Cumm.

Cumm.

Clean, mt

Dirty, mt

16,258.06
32,516.13
48,774.19
65,032.26
81,290.32
97,548.39
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Checked by,

18,064.52
36,129.03
54,193.55
72,258.06
90,322.58
108,387.10
126,451.61
144,516.13
162,580.65
180,645.16
198,709.68
216,774.19
234,838.71
252,903.23
270,967.74
289,032.26
307,096.77
325,161.29
343,225.81
361,290.32
379,354.84
397,419.35
415,483.87
433,548.39
451,612.90
469,677.42
487,741.94
505,806.45
523,870.97
541,935.48
560,000.00

BAUXITE MININ
Day Shift
Rate
Tonnage

124
62
62

143
81
84

117
24
697

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
1,030.00
0.00
980.00
0.00
0.00
2,425.50
1,316.00
0.00
1,416.00
0.00
0.00
0.00
0.00
0.00
2,020.00
480.00
0.00
11,447.50

Night Shift
Rate

Regards by,
DIRTY
CLEAN

Temy Hardiansyah
Data Processing

Asep Ruskandar
Mine Plan

Sites Manager

BARGING

anjungpinang
sia
ACTUAL

BAUXITE MINING
Night Shift
Tonnage

Err:508

Fuel (liter)
Total

Cumm, mt

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
1,030.00
0.00
980.00
0.00
0.00
2,425.50
1,316.00
0.00
1,416.00
0.00
0.00
0.00
0.00
0.00
2,020.00
480.00
0.00
11,447.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,780.00
2,810.00
2,810.00
3,790.00
3,790.00
3,790.00
6,215.50
7,531.50
7,531.50
8,947.50
8,947.50
8,947.50
8,947.50
8,947.50
8,947.50
10,967.50
11,447.50
11,447.50
0

Fuel Ratio ETD' DIRTY


BAUXITE
AT FRONT
Ltr/ton
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
0.0
#DIV/0!
0.0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
###

FRONT TO DIRTY STOCK


Rate

Tonnage

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Front Loading

Yearly Production & Shipment


May
###

June

July

Aug

#REF!

YTD
#REF!

###

10,732.37

Dirty
Plan
Actual
Ach'ment

May
3,361.00

June
20,295.71

July

Aug

YTD
23,656.71

YTD

560,000.0
0.0
0%
108,111.8

MONTHLY BAUXITE PRODUCTION REPORT - PERIODE AUGUS


FRONT I (PERJUANGAN) - SEBAUK
HAULING BAUXITE

IRTY STOCK

FRONT TO WBX / A

Cumm, ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate

124
62
62

143
81
84

117
24
Err:508

t Loading

Tonnage

Cumm, ton

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
515.00
0.00
490.00
0.00
0.00
1,212.75
658.00
0.00
708.00
0.00
0.00
0.00
0.00
0.00
1,010.00
240.00
0.00
Err:508

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
1,405.00
1,405.00
1,895.00
1,895.00
1,895.00
3,107.75
3,765.75
3,765.75
4,473.75
4,473.75
4,473.75
4,473.75
4,473.75
4,473.75
5,483.75
5,723.75
5,723.75

DIRTY STOCK TO WBX / B


Rate

Err:508

Tonnage

Err:508

Bauxite Stock

Clean

Barging

504,000.00 504,000.00
5,723.75
5,723.75
1%
25,196.86

1%
17,807.74

Dirty Stock

A + B (CLEAN STO

Cumm, ton

Total Clean
Bauxite
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
890.00
515.00
0.00
490.00
0.00
0.00
1,212.75
658.00
0.00
708.00
0.00
0.00
0.00
0.00
0.00
1,010.00
240.00
0.00
Err:508

Weekly Plant
PLAN

Clean Stock
Jetty MOCO

4,826.00 mt

126,451.61

Jetty T. PAGI

0.00 mt

126,451.61

###

126,451.61

###

180,645.16
560,000.00

ETD Clean Bauxite at Front


Total

897.75 mt

DIRTY

ODE AUGUST 2011


UK

+ B (CLEAN STOCK 90%)


Cumm, ton
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

CLEAN

BARGING

Cumm, mt

Ton

Tonnage

Rate

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,460.00
2,390.00
3,510.00
3,510.00
3,510.00
4,826.00
4,826.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,460.00
2,390.00
3,510.00
3,510.00
3,510.00
4,826.00
4,826.00

Err:508

WBX TO JETTY MOCO


Rate

Tonnage

78
48
60

1,460.00
930.00
1,120.00

69
255

1,316.00
4,826.00

Weekly Plant
PLAN

STOCK PILE
JETTY
MOCO

ACTUAL
DIRTY

CLEAN
-

.00

890.00

2,875.75

0.00

1,958.00
5,723.75

HAULING TRA

JETTY MOCO TO JETT

T. HIJAU DAUN MAS


4, Kepulauan
Simpang Senggarang
- Tanjungpinan
Riau - Indonesia
NIKEL PRODUCTION SUMMARY
PT. HIJAU DAUN MAS - JOB SITES

RATE
909

RATE
602

FRONT I
TONNAGE
16,716.00

FRONT I
TONNAGE
11,200.00

RATE

FRONT I
TONNAGE

1,319

13,365.45

RATE
578

357

7,022.00

CRUDE NIKEL STOCK


FRONT II
RATE
TONNAGE
357

7,022.00

WASHED NIKEL STOCK


FRONT II
RATE
TONNAGE
169

2,064.00

697

RATE
0

RATE
697

HAULING NIKEL STOCK PILE TO JETTY _______


FRONT I
FRONT II
TONNAGE
RATE
TONNAGE
RATE
11,688.00
48
720.00
255

CLEAN NIKEL STOCK


MONTH
TONNAGE

TOTAL

NIKEL MINING FRONT TO STOCK PILE


FRONT II
RATE
TONNAGE
RATE

0.00

RATE

RATE

TONNAGE

11,447.50

1,963

35,185.50

FRONT III
TONNAGE
0.00

TOTAL CRUDE NIKEL


RATE

TONNAGE

959

18,222.00

TOTAL WASHED NIKEL

FRONT III
TONNAGE

RATE

TONNAGE

5,723.75

2,185

21,153.20

FRONT III
TONNAGE
4,826.00

CLEAN NIKEL STOCK JETTY


MONTH
TONNAGE

TOTAL

TOTAL NIKEL MINING

FRONT III
TONNAGE

0.00

TOTAL HAULING TO JETTY


RATE
881

RATE

TONNAGE
17,234.00

TAHUN
2013

BULAN
11

Front Area
Dirty Plan
Clean Plan

20,000 m
56,000 mt
50,400 mt

BJ BOUXITE
PC 330

PC 210

TANGGAL
1

Thickness
Working
Days
Hours/Day

1.3

BCM

2.0 m
### Dirty Pla
### Clean Pla
DP

DUMP TRUCK
DT 6
DT 10
4,667

2,800

4,200

2,520

CP

2.1

2.73

20,513

18,462

1.2

1.56

35,897

32,308

PC300
151
90

Date
PLAN

Dirty Bauxite (mt)


Clean Bauxite (mt)
Cumm.
Clean, mt
Cumm.
Dirty, mt
Day Shift

ACTUAL

BAUXITE
MINING

Night Shift

Roda
Rate
Roda
Tonnage
Roda
Rate
Roda
Tonnage

6
10

Rate

01

02

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

3,251.61

1,806.45

3,612.90
120

181

48

3,620

2,400

3,620

2,400

3,620

6,020

Roda 6
Roda 10
Tonnage

Rate

Cumm, ton
Rate

FRONT TO
WBX / A Tonnage
Cumm, ton
HAULING
Rate
DIRTY
BAUXITE STOCK TO
Tonnage
WBX / B
Cumm, ton
A+B
Total Clean Bauxite
(CLEAN
Cumm, ton
STOCK 90%)
Rate
WBX TO
JETTY MOCO Tonnage
Cumm, mt
STOCK PILE
Ton
Tonnage
BARGING
Rate
HAULING JETTY MOCO
TO JETTY T.
Tonnage
TRANSIT
PAGI
Cumm, mt
STOCK PILE JETTY T.
Ton
PAGI
Tonnage
BARGING

REMARKS

Saturday

6
10

Total
Accumulasi ( MT )
Fuel (liter)
Fuel Ratio
Ltr/ton
ETD' DIRTY BAUXITE AT FRONT
FRONT TO
DIRTY
STOCK

Friday

RATE DT/DAY
DT 6
DT 10

DT/DAY
DT 6

DT 10

151

90

22

13

135

81

19

12

Monday

Sunday

Tuesday

04

03

Wednesday

05

06

Thursday
07

Friday

Saturday

08

09

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

4,877.42

6,503.23

8,129.03

9,754.84

11,380.65

13,006.45

14,632.26

5,419.35

7,225.81

9,032.26

10,838.71

12,645.16

14,451.61

16,258.06

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

7,076

8,132

9,188

10,244

11,300

12,356

13,412

Monday

Sunday

Tuesday

11

10

Wednesday

12

13

Thursday
14

Friday

Saturday

15

16

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

16,258.06

17,883.87

19,509.68

21,135.48

22,761.29

24,387.10

26,012.90

18,064.52

19,870.97

21,677.42

23,483.87

25,290.32

27,096.77

28,903.23

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

14,468

15,524

16,580

17,636

18,692

19,748

20,804

Monday

Sunday

Tuesday

18

17

Wednesday

19

20

Thursday
21

Friday

Saturday

22

23

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

27,638.71

29,264.52

30,890.32

32,516.13

34,141.94

35,767.74

37,393.55

30,709.68

32,516.13

34,322.58

36,129.03

37,935.48

39,741.94

41,548.39

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

21,860

22,916

23,972

25,028

26,084

27,140

28,196

Monday

Sunday

Tuesday

25

24

Wednesday

26

27

Thursday
28

Friday

Saturday

29

30

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

39,019.35

40,645.16

42,270.97

43,896.77

45,522.58

47,148.39

48,774.19

43,354.84

45,161.29

46,967.74

48,774.19

50,580.65

52,387.10

54,193.55

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

29,252

30,308

31,364

32,420

33,476

34,532

35,588

Sunday
01
1,806.45

56,000.00

1,625.81

50,400.00

50,400.00
56,000.00
8

352.00

48

1,621.00

1,056
1,056
36,644

TAHUN
2013

BULAN
11

Front Area
Dirty Plan
Clean Plan

20,000 m
56,000 mt
50,400 mt

BJ BOUXITE
PC 330

PC 210

TANGGAL
1

Thickness
Working
Days
Hours/Day

1.3

BCM

2.0 m
### Dirty Pla
### Clean Pla
DP

DUMP TRUCK
DT 6
DT 10
4,667

2,800

4,200

2,520

CP

2.1

2.73

20,513

18,462

1.2

1.56

35,897

32,308

PC300
151
90

Date
PLAN

Dirty Bauxite (mt)


Clean Bauxite (mt)
Cumm.
Clean, mt
Cumm.
Dirty, mt
Day Shift

ACTUAL

BAUXITE
MINING

Night Shift

Roda
Rate
Roda
Tonnage
Roda
Rate
Roda
Tonnage

6
10

Rate

01

02

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

3,251.61

1,806.45

3,612.90
120

181

48

3,620

2,400

3,620

2,400

3,620

6,020

Roda 6
Roda 10
Tonnage

Rate

Cumm, ton
Rate

FRONT TO
WBX / A Tonnage
Cumm, ton
HAULING
Rate
DIRTY
BAUXITE STOCK TO
Tonnage
WBX / B
Cumm, ton
A+B
Total Clean Bauxite
(CLEAN
Cumm, ton
STOCK 90%)
Rate
WBX TO
JETTY MOCO Tonnage
Cumm, mt
STOCK PILE
Ton
Tonnage
BARGING
Rate
HAULING JETTY MOCO
TO JETTY T.
Tonnage
TRANSIT
PAGI
Cumm, mt
STOCK PILE JETTY T.
Ton
PAGI
Tonnage
BARGING

REMARKS

Saturday

6
10

Total
Accumulasi ( MT )
Fuel (liter)
Fuel Ratio
Ltr/ton
ETD' DIRTY BAUXITE AT FRONT
FRONT TO
DIRTY
STOCK

Friday

RATE DT/DAY
DT 6
DT 10

DT/DAY
DT 6

DT 10

151

90

22

13

135

81

19

12

Monday

Sunday

Tuesday

04

03

Wednesday

05

06

Thursday
07

Friday

Saturday

08

09

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

4,877.42

6,503.23

8,129.03

9,754.84

11,380.65

13,006.45

14,632.26

5,419.35

7,225.81

9,032.26

10,838.71

12,645.16

14,451.61

16,258.06

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

7,076

8,132

9,188

10,244

11,300

12,356

13,412

Monday

Sunday

Tuesday

11

10

Wednesday

12

13

Thursday
14

Friday

Saturday

15

16

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

16,258.06

17,883.87

19,509.68

21,135.48

22,761.29

24,387.10

26,012.90

18,064.52

19,870.97

21,677.42

23,483.87

25,290.32

27,096.77

28,903.23

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

14,468

15,524

16,580

17,636

18,692

19,748

20,804

Monday

Sunday

Tuesday

18

17

Wednesday

19

20

Thursday
21

Friday

Saturday

22

23

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

27,638.71

29,264.52

30,890.32

32,516.13

34,141.94

35,767.74

37,393.55

30,709.68

32,516.13

34,322.58

36,129.03

37,935.48

39,741.94

41,548.39

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

21,860

22,916

23,972

25,028

26,084

27,140

28,196

Monday

Sunday

Tuesday

25

24

Wednesday

26

27

Thursday
28

Friday

Saturday

29

30

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,806.45

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

1,625.81

39,019.35

40,645.16

42,270.97

43,896.77

45,522.58

47,148.39

48,774.19

43,354.84

45,161.29

46,967.74

48,774.19

50,580.65

52,387.10

54,193.55

48

48

48

48

48

48

48

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

1,056

29,252

30,308

31,364

32,420

33,476

34,532

35,588

Sunday
01
1,806.45

56,000.00

1,625.81

50,400.00

50,400.00
56,000.00
8

352.00

48

1,621.00

1,056
1,056
36,644

PT. HIJAU DAUN MAS


14 Kepulauan
Simpang Senggarang
- Tanjungpinang
nd,
Riau - Indonesia
WEEKLY REPORT (MAR 14-20th 2011)

Weekly Progress Report


Project: BK
Production Activities
Coal Mining
INVENTORY
In Pit
ISP Stockpile (km17)
ROM Stockpile
Jetty Sockpile
PRODUCTION
OVB
Coal Uncovered
S.R.
MINING
Pit to Jetty
Pit to Stockpile (km17)
Stockpile to Jetty
BARGING

Last Week
Plan
Actual
25,000
10,000
6,000.00
5,000
1,080.00
5,000 Err:508
5,000
5,898.089
35,000
35,000
14,000
6,000.00
2.5
15,000.00
5,000.00
5,000.00
1,080.00
5,000.00
11,688.00
10,000.00 Err:509

Excavator Equipment Productivity 1


EX-301
EX-302
EX-303
EX-201

Fleet Utilization2
Prepared by,
Temy Hardiansyah
Data Processing - Eng. Dept
PT. PES Job Sites Bunda Kandung
Paring Lahung

62%

OVB
117.85
115.00
88.32
General Work

Variance
-4000
-3920

% Variance

898.089

-40%
-78%
#VALUE!
18%

-35000
-8000
-2.5

-100%
-57%
0%

-5000

-100%
0%
0%
Err:509

Err:509
COAL

38.05

Comments

Fleet Availability3
Fleet Fuel Factor4

82%
#DIV/0!

Sales Activities
Buyer
1. Mitra Barito
2. Artha Perdana

Prices
IDR
IDR

Grade
27,000 51-53
27,000 51-53

Plan

Ref:
1
BCM/Op.Hr.
2
Utilization = op.hrs./24 hrs
3
Availablity = op.hrs/ (on shift repairs+off-shift repairs+op.hrs.)
4
Fuel Factor using OVB bcm + Coal (@ 1.3 tonnes/bcm)

Prepared by,
Temy Hardiansyah
Data Processing - Eng. Dept
PT. PES Job Sites Bunda Kandung
Paring Lahung

Actual
5500
5500

0
0

Variance
Comments
-5500 No Loading
-5500 Reschedule

ang

Prepared by,
Temy Hardiansyah
Data Processing - Eng. Dept
PT. PES Job Sites Bunda Kandung
Paring Lahung

Prepared by,
Temy Hardiansyah
Data Processing - Eng. Dept
PT. PES Job Sites Bunda Kandung
Paring Lahung

To. Bp. Mustopa A


Catatan :
> Tgl. 12 maret 2010
Berdasarkan surat dari jakarta per tgl. 01 maret 2010 untuk unit Dz 101, PC 200- 211 & 212 tidak dirental lagi oleh TUC.
Tapi karena permintaan Operation TUC untuk keperluan tambang unit masih digunakan secara temporary.
Untuk Dz 101 digunakan sebagai unit pengganti Dz 102 & 103 yang BD di awal bulan maret, sehingga Dz 101 yang digunakan untuk Operational.
Dz. 101 digunakan sampai dengan tgl. 04 maret 2010 shift malam (II), karena per tgl. 04 maret 2010 (II) - 11 maret 2010 unit Dz 101 BD
(berdasarkan lap. BD dari pengawas unit).
Per tgl. 11 maret 2010, Dozer yang ready digunakan untuk operational hanya Dz 103, karena Dz 101 & 102 masih BD.
Pemakaian unit PMC yang sudah tidak dirental tapi masih digunakan oleh TUC sudah di info kan kepada pak Agung.

Data Unit D 155 PMC


Unit / Nomor

D 155

BD(hrs)

Maret 2010
Keterangan

101

154.00 BD, Pertgl. 04 maret 2010 (shift II) sudah tidak digunakan lagi

102
103

231.00 BD, Mulai awal 01 maret 2010 s/d tgl. 11 maret 2010
Ready

> Keterangan untuk surat Pak Agung yang di tujukan untuk PT. P M C
> Jam BD terhitung dari tgl. 01 maret - 11 maret 2010