Agreement No.

: 13562301
GASCO Project No. : 5623

Interconnection of ADWEC CRS to DEL at TAWEELAH


RESPONSE SHEET TO GASCO DOCUMENT REVIEW COMMENTS
GASCO TRANSMITTAL NUMBER

DATE

REVIEW
CODE

08/08/2016

S/N

1.0

Section/Page Ref.

COMPANY Comments

1. Cable penetration and spares shall be


properly sealed to provide protection from
fire, gas, smoke; chemical, liquid etc.MAR
shall be submitted accordingly.
2. Core cutting of concrete wall for MCT
opening shall cut the reinforcement bars,
which are placed 150mm c/c both ways,
inside and outside face of the wall. Therefore
contractor shall submit the design
calculations to ensure that cutting of
reinforcement shall not compromise
structural integrity of wall.
3. Separate method statement for core cutting
of concrete wall shall be submitted for
companys review & approval.

DOCUMENT No.

DOCUMENT TITLE

REVISION

5623-PP-GEN-15003

Method Statement For Multi


Cable Transit (MCT)
Installation

CONTRACTOR Response

1. Comment incorporated.MAR attached


2. Sketch attached as per specification.
3. Core cutting methodology elaborated in this
document.

Status/ Remarks