You are on page 1of 2

Date

: APRIL 05, 2016

To

: G.M. MANINGAS CONSTRUCTION INC.

Thru

: MR. FERNAN S. SIMEON


Project Head

Project

: CELLSITES PROJECT

Subject

: COST PROPOSAL

========================================================================
Dear Sir,
We are pleased to submit in your good office our cost proposal for the aforementioned project. Below
are the rates per item including the scope of works, exclusion, terms & conditions.
Description
UOM
1.) STRUCTURAL DESIGN & ANALYSIS:
NEW ROOFTOP CELLSITES
BIPOD_LIGHT DUTY
site
9M & 12M

Unit Rate

Php19,000.00

Amount

Php19,000.00

15M & 18M

site

Php21,000.00

Php21,000.00

EXISTING BUILDING

site

Php19,000.00

Php19,000.00

15M, 18M & 21M

Site

Php25,000.00

Php25,000.00

EXISTING BUILDING
2.) STRUCTURAL DESIGN & ANALYSIS:
NEW GREENFIELD CELLSITES
GREEN FIELD CELLSITE_FOUNDATION
DESIGN ONLY

site

Php25,000.00

Php25,000.00

30M

Site

Php17,000.00

Php17,000.00

40M, 50M

Site

Php21,000.00

Php21,000.00

Site
Site

Php25,000
Php25,000

MINITOWER_LIGHT DUTY

3.) STRUCTURAL DESIGN & ANALYSIS:


COLOC ROOFTOP CELLSITES
BIPOD_LIGHT & LIGHT DUTY
BIPOD_LIGHT & MEDIUM DUTY

Php25,000
Php25,000

INCLUSION:
necessary);
EXCLUSION:

Detailed Pre-Construction Design (particular to the above items), Structural


Analysis & Design, evaluation and calculation (retrofitting design if
Structural Certificates, Professional Engineer Endorsement. As per
specification.
Site Survey, GOV'T Taxes, PERMITS, As-Built Plans

TERMS & CONDITIONS:


Down Payment

- Fifty percent (50%) down payment upon issuance of Purchase Order

Final Payment

- Fifty percent (50%) of the Contract Price upon approval of


Client.

Prepared By: