BW Pioneer - Norsk Offshoredag 27 May PDF
BW Pioneer - Norsk Offshoredag 27 May PDF
MPF01 FPDSO
Petrobras, Black Sea
3.000m drilling wd
1.000.000 bbls storage
DP unit
DeepProducer FPSO DP
FPSOcean
Maersk, Qatar
4.200.000 bbls storage
Spread mooring
Marine P&ID & D&ID system drawings for class review and approval
Ship systems incl ballast & bilge, fire & deluge etc
BW Pioneer FPSO
LOA
LPP
BM
DM
Draft
241m
232 m
42 m
20,4 m
13,9 m
RULES / REGULATIONS
LAW / RULES
Outer Continental Shell Lands Act
USCG Authorities
Hull / Structure
MMS Authorities
Topside (Hydrocarbon)
Classification Society
DNV
FPSO Standard
ULS (Ultimate Limit State for Hull and Deck Modules & Equipment)
Presence of eddy current means beam seas can not be excluded, i.e.
headings ranging from head seas to beam seas
Issues:
Low freeboard at full draught
Non-colinear wind/waves/current
Motion & Model test:
Revealed green sea to be a concern
ULS (cont.)
Possibility of beam seas leads to large transverse and vertical accelerations
Head sea
30
Head sea
90
Flare tower
3.8
7.6
Deck module
2.4
4.9
Helideck
2.3
5.8
Topside design
GTD requirement for z-quality for all structure in laminar tension
FLS Methodology
Trading tanker / consumed fatigue life
Inspection of vessel
Mapping of historic damages
Basis for selection of consumed fatigue assessment methods
(Nauticus Hull Fatigue vs Stochastic Fatigue)
Historic trade and damage assessed by Nauticus Hull Fatigue
Fatigue calculations for typical ballast and full load conditions based on
previous sailing history
Different operational environments included by scaling of fe-factor (ref
DnV 30.7) Period
Sailing route
1992 to 1994
1995 - 1996
1997 1999
2000 - 2003
2003 - 2004
2004 - 2004
2004 - 2007
2009 -
Caribbean US Gulf
Far East Australia
Caribbean US Gulf
Europe and Mediterranean
Caribbean US Gulf
Europe
Caribbean US Gulf
Permanently located as FPSO at Walker
Ridge location
Normal Requirements
Specified heading profile
head sea +/- 30 deg
FLS summary
Conversion projects differ from newbuilding since structure already has
demonstrated its actual fatigue performance (trading as tanker)
Identification of critical details - with high confidence level
Required design fatigue life as FPSO is 16 years included DFF of minimum 2
on all details
Details of stiffeners connection to bhd was improved in waterline area
Relatively long design life as FPSO, with limited possibilites of repair,
necessitate thorough fatigue analysis
Side damage
Long. Extent:
Transv. Extent:
Vert. extent:
PAI Requirements