You are on page 1of 21

CONOCO INDONESIA INC. LTD.

INFRASTRUCTURE GROUP

SPECIFICATION

CLAD / LINED LINE PIPE

DOCUMENT NUMBER: 84501-9230-2L-042

REV

ISSUE

PREPARED BY

For use

Dean Hewitt

REVIEWED BY

APPROVED BY

ISSUE DATE

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
2 of 21

REVISION CONTROL SHEET


LATEST REV

DATE ISSUED

PREPARED

REVIEWED

APPROVED

COMMENTS

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
3 of 21

TABLE OF CONTENTS

1.

INTRODUCTION.......................................................................................................4

2.

PROCESS OF MANUFACTURE..............................................................................5

3.

CHEMICAL REQUIREMENTS.................................................................................7

4.

PRODUCTION MECHANICAL TEST REQUIREMENTS........................................8

5.

WELDING.................................................................................................................9

6.

HYDROSTATIC TESTING......................................................................................10

7.

DIMENSIONAL REQUIREMENTS AND TOLERANCES......................................10

8.

NONDESTRUCTIVE TESTING..............................................................................11

9.

WORKMANSHIP....................................................................................................14

10. PIPE CONTROL TALLY SHEET............................................................................15


11.

PIPE MARKING......................................................................................................15

12. PIPE COATING.......................................................................................................16


13. TRANSPORTATION AND HANDLING..................................................................16
14. MILL TEST CERTIFICATES...................................................................................16
15. DOCUMENTATION AND CERTIFICATION...........................................................17
16. QUALITY ASSURANCE.........................................................................................18
17. PRODUCT INSPECTION.......................................................................................19
APPENDIX - A

MPS MINIMUM REQUIREMENTS............................................20

APPENDIX - B

CHEMICAL ANALYSIS OF BASE MATERIAL.........................21

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
4 of 21

1. INTRODUCTION
1.1 Scope
This document defines the minimum quality and acceptability governing the
design, materials, manufacture, testing, handling, and shipping of all Grades of
Clad / Lined Line Pipe.
Contractor shall obtain Company written approval for any deviations from the
requirements of this document or specifications, standards and drawings
referenced herein or elsewhere in the Contract.
This document and the codes, specifications and referenced documents listed in
1.2 below are not intended to be all-inclusive. The requirements set forth do not
relieve Contractor of his responsibility to perform all services in a safe manner, to
meet applicable codes and standards, to comply with government regulations or
to supply a product capable of performing its intended service.
1.2 Codes, Specifications, And References
The latest editions of all applicable codes, specifications and references shall
define the minimum requirements applicable to the subject work and no
statement contained in this Specification shall be construed as limiting the work
to such minimum requirements.
Wherever conflicts or omissions between codes, specifications and contract
occur, the most onerous condition shall apply. Contractor is responsible for
reviewing the list below and informing the Company of any omissions. All conflicts
shall be formally brought to the attention of the Company.
Applicable Codes
API Spec 5L
API Spec 5LD

Specification for Line Pipe


Specification for CRA Clad or Lined Steel Pipe

API RP 5L1

Railroad Transportation of Line Pipe

API RP 5LW

Marine Transportation of Line Pipe on Barges and


Marine Vessels

ASME BPVC
Section V

Nondestructive Examination

ASME B31.8

Gas Transmission and Distribution Piping Systems

ASTM A264

Standard Specification for Stainless Chromium-Nickel SteelClad Plate, Sheet, and Strip

ASTM A370
ASTM A578

Mechanical Testing of Steel Products


Standard

Specification

for

Straight-Beam

Ultrasonic

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
5 of 21

Examination of Plain and Clad Steel Plates for Special


Applications
ASTM B424

Standard Specification for Ni-Fe-Cr-Mo-Cu Alloy (UNS


N08825 and UNS N08221) Plate, Sheet, and Strip

NACE MR0175

Sulfide Stress Cracking Resistant Metallic Materials for


Oilfield Equipment

ASTM E59-78

Method for Sampling Steel and Iron for Determination of


Chemical Composition

ASTM E92-82

Vickers Hardness Testing of Metallic Materials

ASTM E350-88

Method for Chemical Analysis of Carbon Steel, Etc.

ASTM E112

Methods for Determining Average Grain Size

ASTM E709

Magnetic Particle Examination

ASNT-TC-1A
EN 10204
SEP 1914

Personnel Qualification and Certification in Nondestructive


Testing Level II
Certificates on Material Testing
Non-destructive Testing of Fusion Welds in Stainless
Steel Pipes

Company Specifications
84501-9200-9L-027 Welding Procedure & Welder Performance Qualification
84501-9230-2L-035 Welding Specification for Flowlines to API 1104 : 1999
84501-9230-2L-009 Induction Bends
84501-9200-1L-025 Positive Material Identification
2. PROCESS OF MANUFACTURE
The manufacture shall be carried out in accordance with a pre-approved
Manufacturing Procedure Specification (MPS) provided by Manufacturer. The
MPS shall include as a minimum a detailed step by step of the manufacture
process, for both the outer line pipe and inner cladding or lining, including but not
limited to steel making, targeted chemical analysis, pipe manufacture, heat
treatment, end finishing, inspection, storage and transport.
The MPS shall include reference to specifications and sources of all materials
used in the manufacture of the line pipe.
Manufacturer shall state in the MPS all parameters related to the quality of the
final product as defined in the specification which can be monitored during
manufacturing. This is to enable definition of the inspection of these items. Both
nominal values and ranges of these parameters shall be stated.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
6 of 21

The layout of the MPS shall enable Company to define easily and unambiguously
the responsibilities of Company's designated inspector during the manufacture.
Minimum MPS requirements are included in Appendix A.
The MPS shall be approved by Company prior to commencement of the
manufacture of the line pipe.
2.1 Steelmaking
The base material carbon steel pipe furnished to this specification shall be
seamless to API 5L for lined pipe and longitudinally welded (submerged arc
welded) for metallurgically clad pipe, with internal CRA cladding or lining, as
defined in API 5LD. Centrifugally cast pipe shall not be supplied. The line pipe
shall be a proven weldable clad or lined product. Both metallurgically and
mechanically bonded pipes are acceptable to this specification.
All steel shall be produced by the basic oxygen process, fully killed, and made to
a fine grain practice. Continuous casting shall be used unless otherwise
approved by Company. Provisions shall be made for low sulfur and low
phosphorus refining. Rare earth additions are prohibited.
Seamless pipe shall be manufactured by hot forming. Welded pipe shall be
manufactured from plate rolled from continuously cast slab.
The use of mill-jointers shall not be permitted except in the case of metallurgically
clad pipe where two equal size joints are joined in the mill to obtain the full joint
length required in Section 7.3 of this specification.
Pipe shall be suitable for:

Field welding without the necessity of post weld heat treatment if specified
on the purchase order.

Bending to form 5 x D, 3 X D or other stipulated radius linepipe bends.


Method of bending is to be developed by Contractor and approved by
Company.

2.2 Plate, Sheet and Strip


Plate sheet and strip material for the manufacture of welded pipe shall be in
accordance with ASTM A264. Plate sheet and strip material for the CRA layer
shall be in accordance with ASTM B424 UNS NO8825.
A test piece cut from one plate per cast, without the CRA layer, shall be tested in
accordance with, and shall meet the requirements of, paragraphs 4.2 to 4.5
inclusive of this specification in order for the cast to qualify for pipe manufacture.
Plates shall be inspected for laminations and bonding between base and clad
materials by the ultrasonic method in accordance with procedures defined in

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
7 of 21

ASTM A578, Level II over a width of at least 1-inch along the edges where
welding is to be performed and throughout the plate at regular intervals, not to
exceed 6 inch spacing. Laminar defects larger than 0.250 in2 within 1 inch of the
edge are not acceptable. Defects larger than 2 in2 are not acceptable in the
interior of the plate laminar.
A test piece cut from one clad plate per cast, for metallurgically clad pipe, shall be
tested in accordance with, and meet ASTM A264 shear strength requirements.
A gripping test for determining the bond strength of lined pipe shall be performed.
Test procedure and criteria shall be agreed with Company.
2.3 Pipe Fabrication
For lined pipe, the pipe ends shall be seal welded to a procedure approved by
Company. Procedure for seal welding in the field to be performed by installation
contractor for cutbacks shall be provided. Seal welding procedures shall include
the seal welding operation, process, consumables and inspection.
The line pipe shall be suitable for manual welding using conventional pipeline
welding techniques and for automatic welding employing the systems currently in
use by the major pipelay contractors for pipelines. Manufacturer shall submit
evidence which satisfactorily demonstrates the material weldability to installation
contractors and Companys satisfaction.
3. CHEMICAL REQUIREMENTS
3.1 Chemical Composition
For Metallurgically Clad pipe
In addition to the latest revision of API Spec 5L requirements, the base material
shall meet the chemical composition requirements stated in Appendix B of this
Specification. The CRA layer shall meet the requirements of API 5LD material
grade LC 2242 (UNS N08825) except that maximum carbon content shall be
0.030. The chemical composition shall be controlled within the limits specified in
Appendix B for the base material and as specified in API 5LD for the CRA layer.
Manufacturer shall submit the proposed range and target values for each element
in the MPS.
Product analysis shall be performed on the more frequent of each lot of 50 pipes
or at least once per heat.
If any ladle or product analysis for any heat fails to meet the Specification
requirements, no pipe shall be accepted from that heat.
For Mechanically Clad pipe

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
8 of 21

Shall meet the respective ASTM / API requirements.


3.2 Heat Treatment
The line pipe shall be heat treated to achieve the properties herein. A postforming normalizing or quenching and tempering heat treatment is required for
seamless pipe. Controlled rolled, accelerated cooled or quenched and tempered
heat treatment is acceptable for plate for welded pipe. The heat treatment times
and temperatures shall be specified in the MPS.
4. PRODUCTION MECHANICAL TEST REQUIREMENTS
4.1 General
Mechanical testing of the base material and weldments shall be in accordance
with API 5L and as modified below and shall be carried out on test rings cut from
the ends of a randomly selected pipe. The number and frequency of tests shall
be as specified in API 5L unless otherwise stated. Testing of the CRA layer shall
be carried out to API 5LD. All test results shall be made available to Company for
review.
All mechanical and metallurgical tests shall be performed on one pipe selected
from the more frequent of each lot of 50 pipes or once per heat.
Alternate ends of the pipe shall be tested after the final production heat
treatment. Significant variations shall be investigated and resolved.
4.2 Tensile Tests
The yield strength range shall conform to API Spec 5L PSL 2.
Tensile tests shall be performed to determine yield strength, tensile strength,
elongation, and yield / tensile ratio. Written records of all mechanical property
tests shall be furnished to Company. The steel will be a maximum API 5L X60
yield strength level.
Substitution of higher strength grade of line pipe in place of the grades ordered
shall not be acceptable.
The ratio of yield stress to ultimate tensile stress in the finished pipe shall not
exceed 0.90.
The minimum elongation shall be as required by API 5L, Appendix D plus 1%.
For each pipe to be accepted, all tests must be successful.
4.3 Charpy Impact Tests

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
9 of 21

Three full size transverse Charpy V-notch impact specimens, representing one
test, shall be tested at a temperature of 0o F (-18 OC) or at least 10OC below the
minimum design temperature whichever is less. The minimum design
temperature shall consider the blowdown, gas filling, or upset condition. All tests
are to be made in the final heat treatment condition.
Testing shall be performed in accordance with API Spec 5L SR5 and ASTM A370.
For both transverse and longitudinal specimens, the notched axis shall be
perpendicular to the pipe surface.
Full size specimens (10 mm x 10 mm) shall be used where possible. For full size
transverse specimens, the minimum average absorbed energy per set of three
specimens shall be 36 ft-lb (50 J). The minimum absorbed energy of an individual
specimen shall be 30 ft-lb (40 J).
Flattening of the pipe prior to specimen preparation is not permitted. Retesting,
for Charpy V-notch tests only, is permitted if specimens show obvious defects or
defective preparation and is in accordance with this Specification.
4.4 Hardness Tests
Pipe Hardness shall conform to the requirements for welding qualification, if
applicable for welded pipe or to NACE MR0175 for sour service application.
4.5 Resetting
If one of the tests representing a lot fails to conform to the requirements in this
specification, Manufacturer shall repeat all tests on specimens cut from 10 % of
the additional lengths of pipe from the same lot. If such specimens conform to
the requirements, all remaining pipe of the lot will be accepted. If any one of the
specimens fail, the entire lot shall be rejected. However, Manufacturer may elect
to test each individual pipe remaining in the lot. Pipes, which fail any test, shall
be rejected.
5. WELDING
Prior to any welding a Welding Procedure Specification (WPS) shall be
established for Company review according to 84501-9200-9L-027.
Circumferential butt welds shall be in accordance with the requirements 845019230-2L-035.
Repair welding of the CRA layer is not permitted.
6. HYDROSTATIC TESTING

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
10 of 21

Hydrostatic testing shall be applied to each pipe to API 5LD after final heat
treatment, expansion and straightening by use of inhibited water at a temperature
of not less than 40 OF (4.4OC) nor more than 100OF (37.8OC). The use of inhibited
water shall be specified in the MPS. Chloride content of the hydrotest water shall
be limited in accordance with API 5LD.
The hydrostatic test pressure shall correspond to the pressure required to
generate the hoop stress in the pipe wall equal to 90% of SMYS. The minimum
hold time for hydrostatic testing shall not be less than 15 seconds at the specified
test pressure.
Hydrostatic testing apparatus, which shall include a pressure recorder, master
gauge and working gauge, shall be used for all testing and shall provide a record
of the test pressure and duration of test. The hydrotest apparatus shall be
calibrated as required by Manufacturers quality plan, using a dead weight tester.
Written records of all hydrostatic tests shall be furnished to Company.
Any leak in the pipe body is a cause for rejection.
7. DIMENSIONAL REQUIREMENTS AND TOLERANCES
7.1 Diameter
The outside diameter (OD) shall be within 0.75 % of specified. The inside
diameter is defined as including the CRA layer (base pipe OD 2 x base pipe
specified wall thickness 2 x CRA layer specified thickness). The inside
diameter (ID) for a distance of 4 inches from the end of the pipe shall not be more
than 1/16 in. larger nor more than 1/64 in. smaller than specified, as measured
with inside calipers, inside micrometers, a telescope gauge or a similar device.
The inside diameter at the ends may be machined, provided that the termination
of the machining is suitably tapered in accordance with ASME B31.8 and that the
CRA clad or liner thickness tolerances are maintained. The out of roundness for
a distance of 4 inches (101.6 mm) on each OD end shall not exceed 0.5 %
when checked with a limit gage.
7.2 Wall Thickness
The specified nominal wall thickness shall be 10 % measured within 6 inches
(150 mm) from each end of the pipe and +12.5 / -10 % for the remaining pipe
body. The minimum thickness of CRA layer shall not be less than the specified
CRA layer wall thickness. The clad layer wall thickness shall be 3.0 mm for lined
and metallurgically clad pipe. Ultrasonic testing shall be employed to show that
the minimum wall thickness of the base pipe and clad layer is maintained.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
11 of 21

7.3 Length
At least 98% of pipe joint lengths shall be 12.2 m + 0.3 m, -0 m. The remaining
pipe joint lengths shall be > 11.5 m. Deviations to accommodate proposed
installation method must receive approval from Company.
7.4 Pipe End Squareness
Pipe ends shall be cut square at 90o to the pipe axis to within 1/16 in. (1.6 mm) at
any point for all pipes. The method of checking shall be specified in the MPS.
7.5 Pipe End Bevel
Grinding of the bevel is prohibited.
7.6 Gouges and Dents
Gouge and dent repair procedures shall be specified in the MPS.
7.7 Straightness
Measurement frequency of straightness shall be five pipes per shift provided that
these are visually determined to be the worst pipe. If any of these pipes are
rejectable, then inspection frequency shall be increased to ten pipes per shift with
these ten being the worst deviations, obtained visually, after physically rolling the
pipe.
7.8 Weight
The weight of each pipe shall be in the range of +12.5/-3.5 % of nominal weight
per foot. Weight shall be determined by automatic weighing machine.
8. NON-DESTRUCTIVE TESTING
8.1 General
All inspections shall be performed after cold expansion, heat treating, cold sizing,
straightening and hydrostatic testing.
The nondestructive testing equipment used to inspect the pipe shall be checked
with applicable reference standards in a manner similar to that used in regular
production, at least once per shift. If on checking against the reference standard,
the equipment is found to be faulty or to require recalibration, all pipe tested since
the previous calibration shall be retested.
Nondestructive inspection procedures and equipment shall be subject to approval
by Company prior to manufacture of the pipe.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
12 of 21

All nondestructive examinations shall be carried out by personnel qualified to


ASNT-SNT-TC-lA (latest edition) Level II requirements or equivalent.
8.2 Radiography
Radiography is applicable to welded pipe only.
All welds, including the seal weld ends of lined pipe, shall be radiographically
examined and meet the requirements of 84501-9230-2L-035.
8.3 Ultrasonic Testing
All bevelled ends shall be ultrasonically inspected over a width of two (2) inches
around the circumference of the pipe prior to bevelling. A 1/8-inch diameter flat
bottom hole will be used as a rejection standard. Laminations, disbonding or
other defects with a greater reflected signal than the rejection standard are not
acceptable.
Imperfections from UT inspection that produce a signal greater than the reference
standards shall be considered a defect and attended to as stated in Section 9.3
of this document.
Dynamic calibration of the ultrasonic inspection tools and reference standards
shall be employed. Inspection shall be performed at the line pipe production rate.
8.3.1 DSAW Metallurgically Clad Linepipe
The full length of each DSAW metallurgically Clad welded seam including 1 inch
on each side shall be inspected for transverse and longitudinal defects and
disbonding by automatic ultrasonic (UT) method in accordance with Section 9 of
API 5L. The reference standard shall contain 1/16 inch (1.6 mm)
OD drilled holes and machined N5 notches.
The full girth of each circumferential weld in metallurgically clad pipe shall be
inspected for transverse and longitudinal defects by manual UT method in
accordance with Section 9 of API 5L. The reference standard shall contain 1/16
inch (1.6 mm) OD drilled holes and machined N5 notches.
8.3.2 Mechanically Lined Linepipe
The mechanically lined seamless pipe shall be inspected by the UT method for
transverse and longitudinal defects in accordance with API Spec. 5L, SR4.3. The
reference standard shall contain a 1/16 inch (1.6 mm) OD drilled hole and
transverse and longitudinal machined N5 type notches, on the inside surface and
outside surface of the pipe and separated by a distance large enough to produce
separate signals.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
13 of 21

All bevelled ends shall be ultrasonically inspected over a width two (2) inches
around the circumference of the outer pipe after bevelling.
8.4 Eddy Current Testing
The longitudinal seam weld of the CRA liner for mechanically lined pipe shall be
subjected to 100% examination by Eddy Current Testing in accordance with the
specification SEP 1914. Any indications shall be evaluated in accordance with the
requirements of specification 84501-9230-2L-035.
8.5 Liquid Penetrant Examination
The longitudinal weld seam inside the pipe (CRA layer) for a distance of 24
inches from the ends and the beveled ends of clad and lined pipe shall be 100%
liquid penetrant examined in accordance with ASME V, Article 6.
The minimum dwell time for penetrant and developer shall be 15 minutes.
The acceptance criteria for the welds is:

Crack like defects not permitted.

Linear indications not permitted.

The maximum pore diameter shall be 1.5 mm.

The maximum number of pores permitted in a length of 10 inches shall be


four. Any two pores shall be separated by more than 1.5 mm measured
edge to edge.

All repair areas shall be subject to liquid penetrant examination and


ultrasonic thickness test.

No indications shall be permitted on the beveled ends.


8.6 Magnetic Particle Examination
Pipe end bevels shall be inspected for laminations by magnetic particle
procedure in accordance with ASTM E709. No indications shall be permitted.
For welded pipe all external and internal (where accessible) surfaces of the base
material welds shall be 100% magnetic particle examined in accordance with
ASTM E709.
The acceptance criteria is:

Crack like defects not permitted.

Linear indications not permitted.

The maximum pore diameter shall be 1.5 mm.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
14 of 21

The maximum number of pores permitted in a length of 10 inches shall be


four. Any two pores shall be separated by more than 1.5 mm measured
edge to edge.

All repair areas shall be subject to magnetic particle examination and ultrasonic
thickness test.
8.7 Residual Magnetism
Residual magnetism may cause welding problems. The maximum permissible
magnetic flux density shall be 20 gauss, as measured completely around the end
of the pipe using a gauss meter. Every pipe shall be checked as it is loaded for
shipment from the pipe mill. All pipe exhibiting a magnetic flux density greater
than 20 gauss shall be degaussed prior to loading for shipment.
8.8 Inspection
Company or Company representative may employ inspection at any stage of
production of the pipe and shall have access to all parts of the works whenever
work on this job is being carried out.
9. WORKMANSHIP
9.1 Compliance
Manufacturer is responsible for complying with all provisions of this specification.
Company may make any investigation necessary to verify compliance by
Manufacturer and may reject any material that fails to meet this specification.
9.2 Verification and Calibration of Measuring Devices
Measuring instruments shall be calibrated or verified at least once every
operating shift. Verifying the accuracy of measuring devices shall consist of
inspection for wear and conformance to specified dimensions. Verifying the
accuracy of rulers and other non-adjustable measuring devices shall consist of a
visual check for legibility of markings and general wear of fixed reference points.
9.3 Disposition of Defects
Imperfections, described in API 5L, Section 7.8, and API 5LD, Section 11 that
exceed the specified criteria shall be considered defects. Pipe containing defects
must be given one of the following dispositions:

The defect shall be removed by grinding provided the remaining pipe wall
thickness is within the limit specified in section 8.2 of this specification.
The ground areas shall be carefully dressed to ensure a smooth transition
with the surrounding surface of the pipe and that no sharp notch results.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
15 of 21

The section of pipe containing the defect shall be cut off provided the pipe
length requirements are met.

The entire pipe shall be rejected.

Manufacturer shall submit all repair procedures to Company for approval prior to
the manufacture of pipe. Manufacturer shall take all reasonable precautions to
minimize reoccurring damage to the pipe.
9.4 Rejection
Material which shows defects on mill inspection or subsequent to acceptance at
Manufacturer's works, or which proves defective when properly applied in
service, may be rejected, and Manufacturer so notified.
9.5 Rejectable Flaws
Rejectable flaws shall include cracks, leaks and laminations. Rejects due to nondestructive tests and end laminations shall be in accordance with the relevant
sections above.
9.6 Rejection Records
Manufacturer shall prepare a rejection rate record and maintain a current record
of all rejected pipes, complete with reasons or causes for rejection. Production
shall be halted if rejection rates become unacceptable (greater than 3 % after 10
% of the pipe in the lot has been produced). Production shall not be continued
until after the causes of this rejection rate are determined, steps are taken to
prevent these from occurring during the rest of the production order, Company is
notified, and finally, written approval by Company is given.
10. PIPE CONTROL TALLY SHEET
Manufacturer shall maintain a Pipe Control Tally Sheet that shall be updated on a
daily basis. This sheet shall show the status of all pipes in the order at all times.
11. PIPE MARKING
11.1

Requirements
Each length of pipe shall be paint-stenciled with all of the required API markings.
All markings shall be paint stenciled onto the outside surface of one end of the
pipe. Markings shall be in block capital letters with a minimum height of 0.75
inches (19 mm). Markings shall be included on the inside of the pipe at one end
and shall include as a minimum:

Name of manufacturer

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

11.2

DOCUMENT NUMBER
84501-9230-2L-042

Heat/lot number

Sequential pipe identifying number

REV
0

DATE

PAGE
16 of 21

Die Stamping
Bevel shall have hard stamp numbers to ensure traceability using a round softnosed die.

12. PIPE COATING


All pipes shall be furnished bare and free of all mill coating.
13. TRANSPORTATION AND HANDLING
13.1

Transportation Preparation
The billets, slabs and pipe from each heat shall remain, as much as practical,
segregated during the entire manufacturing, testing, inspection and shipping
processes.
Care shall be taken to ensure that mechanical damage is not caused during
handling and transportation of pipe. Handling procedures and details of pipe
transportation shall be submitted to Company for approval. All pipes shall be
handled, loaded and shipped in accordance with API RP 5L1 and 5LW as
applicable. The dimensional tolerances and surface conditions of each pipe shall
apply to the pipe condition as received by Company at the shipping destination.
Pipe shall be delivered without salt contamination.

13.2

End Protectors
End protectors are required. The use of the mill's standard steel end protector
shall be detailed in the MPS.

14. MILL TEST CERTIFICATES


14.1

General
Mill test certificates shall be supplied in the English language. One original and
two copies are required for each lot of not more than 100 pipe lengths. All pipes
shall be shown on the mill test certificates. All certificates shall be available prior
to pipe arrival.

14.2

Required Data
The following data are required as a minimum on all mill certificates:

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

14.3

DOCUMENT NUMBER
84501-9230-2L-042

Purchase order number

Heat/lot identifying numbers

Pipe identifying numbers

Ladle analysis

Product analysis

Carbon equivalent

Heat Treatment

All required mechanical test results

Specification limits

NDE results

Line pipe outside diameter and wall thickness.

REV
0

DATE

PAGE
17 of 21

Format
The layout of the mill certificate shall include the following as a minimum:

Signature of responsible official of Manufacturer signifying compliance with


this specifications requirements

Mill Location

Heat Number

Purchase order number

Pipe number (s)

Pipe grade

Heat treatment records

Micrographic examination record where specified

Dimensional report.

Layout of certificate may be per Manufacturers standard format, however the


data required in paragraph 14.2 shall be reported including heat treatment and
Company P. O. number.
15. DOCUMENTATION AND CERTIFICATION
Manufacturer shall supply documentation relating to the supply of line pipe to
Company for approval.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
18 of 21

Full certification of the results of inspection and testing shall be provided by


Manufacturer and shall be validated by Company representative in accordance
with EN 10204 3.1.C, except where Company agrees, prior to the start of
production, to accept EN 10204 3.l.B certificates for specific results.
Certification shall cover all results required by this specification and shall be
marked with sufficient information to enable full traceability to the items it
represents and the relevant specifications and procedures.
All reports and inspection certificates shall be signed by Manufacturer and
Company representative to signify compliance with the requirements of this
specification.
16. QUALITY ASSURANCE
16.1

General
The quality system implemented by Manufacturer shall establish and maintain a
fully documented Quality Assurance/Quality Control system.
Any verification of quality performed by Company or Company representative
shall not relieve Manufacturer of the responsibility to produce acceptable line pipe
nor shall it preclude any subsequent rejection of line pipe.
Manufacturer shall establish and maintain control of all special processes, which
are essential to production, inspection or safety. Equipment, processing
environment and Manufacturer personnel shall be subject to appropriate
qualifications or certifications.
Manufacturer shall maintain quality records as documenting evidence of
conformance to quality requirements. These records shall be made available to
Company representative for review.

16.2

Quality Plan
Prior to the start of any manufacturing process Manufacturer shall prepare a
Quality Plan which sets forth witness, hold, review, repair, and monitor points for
review and approval by Company. Manufacturers subsequent Quality Control of
the Work shall strictly adhere to the agreed Quality Plan. The implementation of
the Quality plan may be subject to monitoring by Company and in addition, may
be audited following an agreed period of notice. Manufacturer shall ensure that
the Quality Plan requirements specified are applied to all materials, equipment
and services provided.
Manufacturer shall inspect the line pipe to ensure compliance with the purchase
order requirements. A check shall be made of all inspection records to verify that
the line pipes were inspected at all points shown in the Quality Plan and that
these records are complete and available to Company representative.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
19 of 21

Material traceability shall be maintained throughout the manufacturing process.


Manufacturer's Quality Plan shall stipulate the traceability procedures, which shall
be incorporated into the MPS.
17. PRODUCT INSPECTION
Company representative shall inspect the pipe and witness the required tests.
Reasonable notice, at least two weeks for the first production test and one day
thereafter, shall be given of the times at which the production tests are to be
made.
Company inspectors and representatives shall have free entry to all parts of
Manufacturer's facilities that concern the manufacture and testing of the ordered
pipe during all times while work on this order is being performed.
Manufacturer shall provide all reasonable facilities to Company inspectors,
without charge, to satisfy him that the pipe is being manufactured in accordance
with this specification. Such facilities shall include, but not be limited to, office
space, office equipment and telecommunication equipment. All inspection shall
be made at the place of manufacture, prior to shipment, unless otherwise
specified in the purchase order. Inspection will be so conducted as not to
interfere unnecessarily with the operation of the works.

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

APPENDIX - A

DOCUMENT NUMBER
84501-9230-2L-042

REV
0

DATE

PAGE
20 of 21

MPS Minimum Requirements

The MPS shall include but not be limited to the following items for the CRA
layer/liner and base pipe as applicable:

Name of steel mill

Steel making method

De-oxidation method

Desulphurization method

Chemical composition range and target composition

Special additions

Ladle treatments

Vacuum de-gassing

Ingot, slab or billet handling practices

Clad plate formation, rolling, heat treatment and final sizing

Cleaning and special coating of cladding and backing plates

Pickling of CRA plates

Casting practices

Frequency of centerline segregation monitoring

Pipe forming practice (incl. instrumentation to ensure proper control of


processing temperatures, heat treatment procedures and other measures
utilized to ensure consistency of both the mechanical properties and
dimensional tolerances of the line pipe).

Pipe forming temperature range

Centerline segregation evaluation procedure

Bonding Shear Strength Measurement Procedures for clad pipe

Gripping Force Strength Measurement Procedures and Criteria for lined


pipe

Pipe End Sealing Method

Pipe Welding Procedures

Weld Repair Procedures

Heat treatment (incl. temperatures, hold times, heating and cooling rates,
cooling medium and furnace details)

Radial Expansion for Liner and Base Pipe

Hydrostatic Test Procedure

Pickling and Passivating

Pipe Tracking System

Quality Plan

Non-destructive Testing Procedures (incl. visual inspection, equipment


details, calibration methods and frequency, scanning procedure and
matrix, probe details, recording/reporting methods, alarm system)

Handling, Transport and Storage Procedures

Squareness Verification Procedures

Dent and Gouge Repair Procedures

CONOCO INDONESIA INC. LTD.


INFRASTRUCTURE GROUP
SPECIFICATION
TITLE
CLAD / LINED LINE PIPE

APPENDIX - B

DOCUMENT NUMBER
84501-9230-2L-042

DATE

PAGE
21 of 21

Chemical Analysis of Base Material

ELEMENT
C

REV
0

Product Analysis, max


weight %
0.16

Mn

1.60

Si

0.50

0.02

0.015

Cu

0.35

Ni

0.40

Mo

0.25

Cr

0.30

Al (total)

0.06

Nb

0.05

0.10

Ti

0.05

0.01

0.0005

Ca

0.004

CE, max

0.40

Pcm, max

0.25

1. For each reduction of 0.01% of the maximum allowed C content, an increase of


the Mn content of 0.05% above the maximum specified up to 1.8% is allowed for
steels with SMYS > = 485 M Pa
2.
Mo: maximum 0.35 % if V is not intentionally added.
3.
0.5 - 1.0% Cr may be used subject to agreement.
4.
(Nb + V)% max : 0.12 %
5.
Al : N >= 2: 1 (not applicable to Ti killed steels)
6.
CE = C + Mn/6 + (Cr + Mo+ V )/5 + (Cu + Ni )/15
7.
Pcm = C + Si/30 + (Mn + Cr + Cu)/20+ Ni/60+Mo/15 + V/10 + 5B