Professional Documents
Culture Documents
SN Determination
Design Inputs
W18 =
R=
So =
MR =
Pi =
Pt =
6,100,000
95
Reliability
0.45
3,000
Standard Deviation
psi
4.5
Initial Serviceability
2.5
Terminal Serviceability
DESIGN SN =
6.20
2 For the first layer, use the E of the next lower layer as the MR in the Inputs Box below th
3 The minimum layer thickness is calculated in column H. Enter the "practical" layer thickn
4 Repeat steps 2 and 3 for each layer, always using the E of the next lower layer as the M
5 Check to ensure resulting SN meets or exceeds required SN
6 Note that this procedure is not valid if any layer beneath layer 1 has an E greater than 40
Layer No.
(topmost)
(bottommost)
Layer 1
Layer 2
Layer 3
Layer 4
Layer 5
Layer 6
Layer 7
Layer 8
Subgrade
Description
Layer
Coefficient, ai
Drainage
Coefficient, mi
AC Layer
0.44
1.00
Gran Base A
0.14
0.90
Gran Base 2
0.14
0.80
Gran. Subbase
0.11
0.80
Subgrade
N/A
N/A
Inputs Box
W18 =
R=
So =
MR =
Pi =
Pt =
6,100,000
95
0.45
35,000
psi
4.5
2.5
SN on top of layer =
2.71
ayer as the MR in the Inputs Box below this table and enter the resulting layer SN.
sing the E of the next lower layer as the MR in the Inputs Box spreadsheet below this table.
s required SN
SN Using E of next
Min. Layer
Practical Layer
Elastic
lower layer in
Thickness, D,
Thickness, D,
Associated
Modulus, psi
inches
inches
SN
400,000
3.33
7.57
7.50
35,000
3.33
0.24
6.00
20,000
3.69
-3.27
3.00
15,000
6.20
20.55
21.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
N/A
N/A
3,000
N/A
6.24
Total Pavement
Thickness, inches,
3.30
0.76
0.34
1.85
0.00
0.00
0.00
0.00
N/A
25.08
37.50
6.20
Design is sufficient
Calculated SN
SN to Match
n is sufficient
Layer No.
(topmost)
(bottommost)
Layer 1
Layer 2
Layer 3
Layer 4
Layer 5
Layer 6
Layer 7
Layer 8
Subgrade
Description
Layer
Coefficient, ai
Drainage
Coefficient, mi
AC Wearing
0.44
1.00
Gran. Base A
0.14
1.00
Gran. Base B
0.14
0.80
Gran. Subbase
0.11
0.80
Subgrade
N/A
N/A
Design SN to Match
Layer
Thickness, in
SN
N/A
1.76
1.68
1.34
1.32
0.00
0.00
0.00
0.00
N/A
Trial SN
6.10
Design SN to Match
6.20
4.00
12.00
12.00
15.00
W18 =
PCC MR =
E=
k-value =
R=
So =
J=
Cd =
Pi =
Pt =
14,000,000
psi
4,000,000 psi
250 psi/in
90 %
650
0.39
3.2
Drainage Coefficient
4.5
Initial Serviceability
2.5
Terminal Serviceability
DESIGN D, inches, =
10.51
ade Reaction