AnlsID
ResID
2201 Paku
6090 Papan (3x20) cm (Borneo)
6087 Usuk : 5/7 (Borneo)
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.3000
0.0200
0.0200
0.2000
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
M3
2.0000
0.0090 Err:509
0.0050 Err:509
22,967.67
Jumlah
206 Mandor
ResID
OH
Upah
16,899.00
1,464.58
1,689.90
10,139.40
0.00
0.00
0.00
30,192.88
0.3330
139,685.32
Jumlah
AnlsID
Jumlah Harga
Bahan
Sat.
M3
M'
KG
KG
KG
M3
M3
Koef.
0.0350
1.4000
0.6000
1.5000
16.8000
0.0270
0.0405
Harga Satuan
0.00
0.00
0.00
0.00
45,935.33
45,935.33
46,515.21
46,515.21
Jumlah Harga
Bahan
Upah
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20
20
20
20
20
OH
OH
OH
OH
OH
Jumlah
0.0175
1.0000
1.0000
2.1000
1.0050
107,243.93
107,243.93
107,243.93
91,046.13
139,685.32
1,876.77
107,243.93
107,243.93
191,196.88
140,383.75
547,945.25
AnlsID
ResID
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
1.0000
0.0056
91,046.13
139,685.32
JAM
1.0000
48,218.48
BUAH
LITER
BUAH
Sat.
0.1667 Err:509
2.0000 Err:509
0.0111 Err:509
Koef.
Harga Satuan
OH
OH
0.7500
0.0250
91,046.13
139,685.32
LS
1.0000
4,942.39
Jumlah Harga
Bahan
Upah
91,046.13
782.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
91,828.37
Err:509
Upah
Err:509
Jumlah Harga
Bahan
68,284.60
3,492.13
0.00
0.00
0.00
71,776.73
0.00
-
AnlsID
ResID
Sat.
OH
OH
Koef.
0.9000
0.0450
Harga Satuan
91,046.13
139,685.32
Upah
81,941.52
6,285.84
88,227.36
Jumlah Harga
Bahan
-
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
0.2500
0.0083
91,046.13
139,685.32
LS
1.0000
4,942.39
Jumlah
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
0.3000
0.0100
91,046.13
139,685.32
Jumlah Harga
Bahan
Upah
22,761.53
1,159.39
0.00
23,920.92
Jumlah Harga
Bahan
Upah
27,313.84
1,396.85
33
M3
1.2000
290,214.98
0.00
348,257.97
33
LS
1.0000
4,942.39
0.00
28,710.69
348,257.97
Jumlah
AnlsID
ResID
Sat.
OH
Koef.
0.3000
Harga Satuan
91,046.13
Upah
27,313.84
Jumlah Harga
Bahan
-
33
33
33
206 Mandor
1208 tanah timbunan
802 Alat bantu
Jumlah
OH
0.0100
139,685.32
1,396.85
M3
1.2000
96,942.00
0.00
116,330.40
LS
1.0000
34,476.21
0.00
28,710.69
116,330.40
AnlsID
ResID
1260 Sirtu
Sat.
Koef.
OH
OH
0.2500
0.0250
91,046.13
139,685.32
M3
1.2000
233,939.19
464,670.64
Jumlah
AnlsID
ResID
Harga Satuan
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.7800
0.0390
0.0390
0.3900
91,046.13
139,685.32
123,471.86
107,243.93
M3
M3
1.2000
0.4320
230,762.80
290,214.98
Jumlah
AnlsID
ResID
1102 Semen PC
1220 Batu Belah 15/20
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.5000
0.0750
0.0750
0.7500
91,046.13
139,685.32
123,471.86
107,243.93
KG
M3
202.0000
1.2000
1,126.60
230,762.80
Jumlah Harga
Bahan
Upah
22,761.53
3,492.13
0.00
26,253.67
280,727.03
280,727.03
Jumlah Harga
Bahan
Upah
71,015.98
5,447.73
4,815.40
41,825.13
0.00
0.00
123,104.25
276,915.36
125,372.87
402,288.23
Jumlah Harga
Bahan
Upah
136,569.20
10,476.40
9,260.39
80,432.95
0.00
0.00
227,573.20
276,915.36
44
M3
Jumlah
0.4850
204,233.21
0.00
236,738.93
99,053.11
603,541.66
AnlsID
ResID
Sat.
Koef.
AnlsID
1102 Semen PC
1214 Bata Merah Press Mesin
1252 Pasir Pasang
Jumlah
ResID
KG
BUAH
M3
Sat.
14.3700
70.0000
0.0400
Koef.
Harga Satuan
91,046.13
139,685.32
123,471.86
107,243.93
27,313.84
2,095.28
1,234.72
10,724.39
1,126.60
844.95
204,233.21
0.00
0.00
0.00
41,368.23
Harga Satuan
Pasangan Bata Merah Uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 5 Ps (m2) (SNI 6897:2008-10)
71
201 Pekerja
OH
0.3000
56,330.00
71
206 Mandor
OH
0.0150
73,229.00
71
211 Kepala Tukang batu
OH
0.0100
84,495.00
71
243 Tukang Batu
OH
0.1000
50,697.00
71
71
71
1102 Semen Pc
1214 Bata Merah Press Mesin
1252 Pasir Pasang
Jumlah
KG
BH
M3
9.6800
70.0000
0.0450
Upah
1,126.60
844.95
204,233.21
Upah
16,899.00
1,098.44
844.95
5,069.70
0.00
0.00
0.00
23,912.09
Jumlah Harga
Bahan
16,189.24
59,146.50
8,169.33
83,505.07
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
10905.488
59146.5
9190.49461857
79,242.48
AnlsID
ResID
1102 Semen PC
1252 Pasir Pasang
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.3000
0.0150
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
7.7760
0.0230
1,126.60
204,233.21
Jumlah
AnlsID
ResID
1102 Semen PC
1252 Pasir Pasang
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.3000
0.0150
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
5.1840
0.0260
1,126.60
204,233.21
Jumlah
AnlsID
ResID
Sat.
Koef.
Harga Satuan
Upah
Jumlah Harga
Bahan
16,899.00
1,098.44
1,267.43
7,604.55
0.00
0.00
26,869.41
Upah
8,760.44
4,697.36
13,457.81
Jumlah Harga
Bahan
16,899.00
1,098.44
1,267.43
7,604.55
0.00
0.00
26,869.41
5,840.29
5,310.06
11,150.36
Jumlah Harga
AnlsID
ResID
Acian (m2)
126
126
126
126
126
201 Pekerja
206 Mandor
211 Kepala Tukang Batu
243 Tukang Batu
1102 Semen PC
Jumlah
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.2000
0.0100
0.0100
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
KG
3.2500
1,126.60
Upah
11,266.00
732.29
844.95
5,069.70
0.00
17,912.94
Bahan
3,661.45
3,661.45
AnlsID
ResID
AnlsID
1102 Semen PC
1205 Agregat Pecah Mesin 20-30 mm
1249 Pasir Beton
Jumlah
ResID
1102 Semen PC
1205 Agregat Pecah Mesin 20-30 mm
1249 Pasir Beton
2004 Besi Beton
2201 Paku
2303 Kawat Beton
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
2.0000
1.0000
0.0350
0.3500
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
M3
336.0000
0.8100
0.5400
1,126.60
226,395.43
110,821.45
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
OH
OH
5.3000
0.2620
0.2650
0.2750
1.0500
1.3000
56,330.00
84,495.00
73,229.00
50,697.00
50,697.00
50,697.00
KG
M3
M3
KG
KG
KG
336.0000
0.8100
0.5400
157.5000
1.5000
2.2500
1,126.60
226,395.43
110,821.45
12,545.18
22,967.67
20,359.36
Jumlah Harga
Bahan
Upah
112,660.00
73,229.00
2,957.33
17,743.95
0.00
0.00
0.00
206,590.28
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
621,761.48
Jumlah Harga
Bahan
Upah
298,549.00
22,137.69
19,405.69
13,941.68
53,231.85
65,906.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
1,975,865.13
34,451.50
45,808.57
207
207
207
M3
LITER
0.2000
0.4000
1,402,617.00
3,013.66
0.00
0.00
LS
1.0000
82,815.24
0.00
473,172.00
280,523.40
1,205.46
0.00
2,959,615.54
AnlsID
ResID
Sloof Beton
208
208
208
208
208
208
208
208
208
208
208
208
208
208
208
AnlsID
1102 Semen PC
1205 Agregat Pecah Mesin 20-30 mm
1249 Pasir Beton
2004 Besi Beton
2201 Paku
2303 Kawat Beton
6030 Kayu Kelas III
7022 Minyak Bekisting
815 Alat Bantu Pengecoran
Jumlah
ResID
Sat.
OH
OH
OH
OH
OH
OH
KG
M3
M3
KG
KG
KG
M3
LITER
LS
Sat.
OH
OH
OH
OH
OH
OH
Koef.
Harga Satuan
Jumlah Harga
Bahan
Upah
5.6500
0.3230
0.2830
0.2750
1.4000
1.5600
56,330.00
84,495.00
73,229.00
50,697.00
50,697.00
50,697.00
336.0000
0.8100
0.5400
210.0000
2.0000
3.0000
0.2700
0.6000
1,126.60
226,395.43
110,821.45
12,545.18
22,967.67
20,359.36
1,402,617.00
3,013.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
2,634,486.84
45,935.33
61,078.09
378,706.59
1,808.19
1.0000
82,815.24
0.00
530,284.99
3,743,776.53
Koef.
7.0500
0.4030
0.3530
0.2750
2.1000
1.6500
Harga Satuan
56,330.00
84,495.00
73,229.00
50,697.00
50,697.00
50,697.00
318,264.50
27,291.89
20,723.81
13,941.68
70,975.80
79,087.32
Upah
397,126.50
34,051.49
25,849.84
13,941.68
106,463.70
83,650.05
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
0.00
0.00
209
209
209
209
209
209
209
209
209
209
209
209
1102 Semen PC
1205 Agregat Pecah Mesin 20-30 mm
1249 Pasir Beton
2004 Besi Beton
2201 Paku
2303 Kawat Beton
6011 Dolken Kayu Dia. 8 cm
6021 Kayu Balok Kelas II
6030 Kayu Kelas III
6059 Plywood (T = 9 mm)
7022 Minyak Bekisting
815 Alat Bantu Pengecoran
Jumlah
KG
M3
M3
KG
KG
KG
BTG
M3
M3
LBR
LITER
LS
336.0000
0.8100
0.5400
315.0000
4.0000
4.5000
20.0000
0.1500
0.4000
3.5000
2.0000
1,126.60
226,395.43
110,821.45
15,178.56
22,967.67
20,359.36
25,725.18
4,757,068.50
1,402,617.00
111,251.75
3,013.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0000
82,815.24
0.00
661,083.25
378,537.60
183,380.30
59,843.58
4,781,246.40
91,870.67
91,617.13
514,503.60
713,560.28
561,046.80
389,381.13
6,027.31
0.00
7,771,014.79
AnlsID
ResID
AnlsID
1102 Semen PC
1205 Agregat Pecah Mesin 20-30 mm
1249 Pasir Beton
2004 Besi Beton
2201 Paku
2303 Kawat Beton
6011 Dolken Kayu Dia. 8 cm
6021 Kayu Balok Kelas II
6030 Kayu Kelas III
6059 Plywood (T = 9 mm)
7022 Minyak Bekisting
815 Alat Bantu Pengecoran
Jumlah
ResID
Sat.
OH
OH
OH
OH
OH
OH
KG
M3
M3
KG
KG
KG
BTG
M3
M3
LBR
LITER
LS
Sat.
OH
Koef.
Harga Satuan
Jumlah Harga
Bahan
Upah
6.3500
0.3330
0.3180
0.2750
1.4000
1.6500
56,330.00
84,495.00
73,229.00
50,697.00
50,697.00
50,697.00
336.0000
0.8100
0.5400
210.0000
3.2000
3.0000
16.0000
0.1400
0.3200
2.8000
1.6000
1,126.60
226,395.43
110,821.45
12,545.18
22,967.67
20,359.36
16,459.63
4,757,068.50
1,402,617.00
111,251.75
3,013.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
2,634,486.84
73,496.54
61,078.09
263,354.02
665,989.59
448,837.44
311,504.90
4,821.85
1.0000
82,815.24
0.00
577,686.68
5,085,330.74
Koef.
0.0200
Harga Satuan
56,330.00
357,695.50
28,136.84
23,286.82
13,941.68
70,975.80
83,650.05
Upah
1,126.60
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah Harga
Bahan
0.00
216
216
216
206 Mandor
212 Kepala Tukang Besi
244 Tukang Besi
OH
OH
OH
0.0000
0.0000
0.0300
73,229.00
84,495.00
50,697.00
0.00
0.00
1,520.91
0.00
0.00
0.00
216
JAM
0.0200
312,302.66
0.00
0.00
KG
KG
1.0500
0.0220
12,092.30
30,136.55
0.00
0.00
2,647.51
216
216
12,696.92
663.00
13,359.92
AnlsID
ResID
Sat.
Koef.
Harga Satuan
ResID
0.0200
0.0000
0.0000
0.0300
56,330.00
73,229.00
84,495.00
50,697.00
1,126.60
0.00
0.00
1,520.91
0.00
0.00
0.00
0.00
JAM
0.0200
312,302.66
0.00
0.00
KG
KG
1.0500
0.0220
12,092.30
30,136.55
0.00
0.00
2,647.51
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
7.0000
0.3500
2.1000
21.0000
56,330.00
73,229.00
84,495.00
50,697.00
M3
KG
KG
1.1000
1.2500
1.0000
5,025,000.00
22,967.67
40,868.78
Jumlah
AnlsID
ResID
Upah
OH
OH
OH
OH
Jumlah
AnlsID
Jumlah Harga
Bahan
Sat.
Koef.
Harga Satuan
Upah
12,696.92
663.00
13,359.92
Jumlah Harga
Bahan
394,310.00
25,630.15
177,439.50
1,064,637.00
0.00
0.00
0.00
1,662,016.65
0.00
0.00
0.00
0.00
5,527,500.00
28,709.58
40,868.78
5,597,078.36
Jumlah Harga
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.0000
0.0500
0.3000
3.0000
56,330.00
73,229.00
84,495.00
50,697.00
M3
KG
0.0400
0.5000
7,775,229.90
40,868.78
Upah
56,330.00
3,661.45
25,348.50
152,091.00
0.00
0.00
237,430.95
Bahan
0.00
0.00
0.00
0.00
311,009.20
20,434.39
331,443.59
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.0000
0.0500
0.3000
3.0000
56,330.00
73,229.00
84,495.00
50,697.00
M3
KG
0.0400
0.5000
7,775,229.90
40,868.78
Jumlah
AnlsID
ResID
2201 Paku
6031 Kayu Papan Kelas I
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.6700
0.3350
0.2000
2.0000
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
0.1500
0.0600
22,967.67
7,775,229.90
Jumlah
AnlsID
ResID
Sat.
Koef.
Harga Satuan
Upah
Jumlah Harga
Bahan
56,330.00
3,661.45
25,348.50
152,091.00
0.00
0.00
237,430.95
Upah
0.00
0.00
0.00
0.00
311,009.20
20,434.39
331,443.59
Jumlah Harga
Bahan
37,741.10
24,531.72
16,899.00
101,394.00
0.00
0.00
180,565.82
Upah
0.00
0.00
0.00
0.00
3,445.15
466,513.79
469,958.94
Jumlah Harga
Bahan
366
366
366
366
366
366
201 Pekerja
206 Mandor
214 Kepala Tukang Kayu
252 Tukang Kayu
2201 Paku
6089 Papan (2x20) cm (Borneo)
Jumlah
OH
OH
OH
OH
0.1000
0.0500
0.0100
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
0.0600
0.0088
22,967.67
4,399,936.30
5,633.00
3,661.45
844.95
5,069.70
0.00
0.00
15,209.10
0.00
0.00
0.00
0.00
1,378.06
38,719.44
40,097.50
AnlsID
ResID
AnlsID
ResID
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.1500
0.0080
0.0050
0.0500
56,330.00
73,229.00
84,495.00
50,697.00
M2
1.0500
21,123.75
Sat.
Koef.
Harga Satuan
Upah
8,449.50
585.83
422.48
2,534.85
0.00
11,992.66
Upah
OH
OH
OH
OH
0.1000
0.0100
0.0100
1.0000
56,330.00
73,229.00
84,495.00
50,697.00
5,633.00
732.29
844.95
50,697.00
KG
M2
0.0400
1.2000
15,429.91
88,973.24
0.00
0.00
57,907.24
Sat.
OH
OH
Koef.
0.1000
0.0100
Harga Satuan
56,330.00
73,229.00
Jumlah Harga
Bahan
Upah
5,633.00
732.29
22,179.94
22,179.94
Jumlah Harga
Bahan
617.20
106,767.88
107,385.08
Jumlah Harga
Bahan
-
440
440
440
440
OH
OH
0.0100
1.0000
84,495.00
50,697.00
844.95
50,697.00
KG
M2
0.0400
1.2000
15,429.91
85,959.58
0.00
0.00
57,907.24
617.20
103,151.50
103,768.69
AnlsID
ResID
AnlsID
1102 Semen PC
1252 Pasir Pasang
9015 Kloset Jongkok Porselen Kw. A
Jumlah
ResID
1102 Semen PC
1252 Pasir Pasang
9028 wastafel Komplit (Kran + Sipon) Kw. A
Jumlah
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.0000
0.1600
1.5000
1.5000
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
UNIT
6.0000
0.0100
1.0000
1,126.60
204,233.21
150,682.75
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.2000
0.1000
1.5000
1.4500
56,330.00
73,229.00
84,495.00
50,697.00
KG
M3
UNIT
6.0000
0.0100
1.0000
1,126.60
204,233.21
452,048.25
Upah
Jumlah Harga
Bahan
56,330.00
11,716.64
126,742.50
76,045.50
0.00
0.00
0.00
270,834.64
Upah
67,596.00
7,322.90
126,742.50
73,510.65
0.00
0.00
0.00
275,172.05
0.00
0.00
0.00
0.00
6,759.60
2,042.33
150,682.75
159,484.68
Jumlah Harga
Bahan
6,759.60
2,042.33
452,048.25
460,850.18
AnlsID
ResID
Sat.
Koef.
Harga Satuan
Upah
OH
OH
OH
OH
0.0100
0.0050
0.0100
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
563.30
366.15
844.95
5,069.70
BUAH
1.0000
30,136.55
0.00
6,844.10
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
30,136.55
30,136.55
AnlsID
ResID
AnlsID
1102 Semen PC
1104 Semen Warna
1214 Bata Merah Press Mesin
1252 Pasir Pasang
9242 Porselin 10 x 20 cm Warna
Jumlah
ResID
1102 Semen PC
1214 Bata Merah Press Mesin
1252 Pasir Pasang
1255 Pasir Urug
4006 Buis Beton Dia 0.80 m
Jumlah
Sat.
OH
OH
OH
OH
KG
KG
BUAH
M3
BUAH
Sat.
Koef.
Harga Satuan
6.0000
0.3000
0.3000
3.0000
56,330.00
73,229.00
84,495.00
50,697.00
120.0000
6.0000
0.4000
0.3000
220.0000
1,126.60
2,253.20
844.95
204,233.21
1,024.64
Koef.
Harga Satuan
OH
OH
OH
OH
0.3800
0.0190
0.0190
0.1900
56,330.00
73,229.00
84,495.00
50,697.00
KG
BH
M3
M3
BH
9.2700
222.7500
0.0549
0.0621
1.1000
1,126.60
844.95
204,233.21
290,214.98
180,819.30
Upah
Jumlah Harga
Bahan
337,980.00
21,968.70
25,348.50
152,091.00
0.00
0.00
0.00
0.00
0.00
537,388.20
Upah
21,405.40
1,391.35
1,605.41
9,632.43
0.00
0.00
0.00
0.00
0.00
34,034.59
135,192.00
13,519.20
337.98
61,269.96
225,421.39
435,740.54
Jumlah Harga
Bahan
10,443.58
188,212.61
11,212.40
18,022.35
198,901.23
426,792.18
AnlsID
ResID
Sat.
Koef.
2.1600
0.1080
0.7200
0.7200
114.0000
166.9500
0.0330
0.1200
0.1840
4.8500
Harga Satuan
56,330.00
73,229.00
84,495.00
50,697.00
1,126.60
844.95
226,395.43
110,821.45
204,233.21
9,806.94
Upah
121,672.80
7,908.73
60,836.40
36,501.84
0.00
0.00
0.00
0.00
0.00
0.00
226,919.77
Jumlah Harga
Bahan
128,432.40
141,064.40
7,471.05
13,298.57
37,578.91
47,563.66
375,409.00
AnlsID
ResID
AnlsID
ResID
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0360
0.0018
0.0060
0.0600
56,330.00
73,229.00
84,495.00
50,697.00
LJR
0.3000
188,057.14
Sat.
OH
OH
OH
OH
LJR
Sat.
OH
OH
OH
OH
Koef.
0.0540
0.0027
0.0090
0.0900
0.3000
Koef.
0.0100
0.0050
0.0100
0.1000
Harga Satuan
56,330.00
73,229.00
84,495.00
50,697.00
188,057.14
Harga Satuan
56,330.00
73,229.00
84,495.00
50,697.00
Upah
Jumlah Harga
Bahan
2,027.88
131.81
506.97
3,041.82
0.00
5,708.48
Upah
3,041.82
197.72
760.46
4,562.73
0.00
8,562.72
Upah
563.30
366.15
844.95
5,069.70
56,417.14
56,417.14
Jumlah Harga
Bahan
56,417.14
56,417.14
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
534
534
7160 Sabun
9018 Kran Air 3/4
KG
BH
0.0250
1.0000
31,342.01
42,191.17
Jumlah
AnlsID
ResID
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0150
0.0008
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
M2
1.0000
109,336.53
Sat.
Koef.
Harga Satuan
0.00
0.00
6,844.10
783.55
42,191.17
42,974.72
Jumlah Harga
Bahan
Upah
844.95
58.58
1,267.43
7,604.55
0.00
9,775.51
109,336.53
109,336.53
Jumlah Harga
Bahan
Upah
OH
OH
OH
OH
0.0600
0.0003
0.0060
0.0060
KG
KG
1.1000
0.0800
0.00
0.00
-
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.6500
0.0320
0.0650
0.6500
56,330.00
73,229.00
84,495.00
50,697.00
M2
1.1000
272,637.20
Upah
36,614.50
2,343.33
5,492.18
32,953.05
0.00
77,403.05
Jumlah Harga
Bahan
299,900.92
299,900.92
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
1.0500
0.0052
0.1050
1.0500
56,330.00
73,229.00
84,495.00
50,697.00
M2
1.0000
753,413.75
Jumlah
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0100
0.0050
0.0100
0.5000
56,330.00
65,000.00
84,495.00
50,697.00
BUAH
1.0000
114,518.89
Jumlah
AnlsID
ResID
Sat.
OH
Koef.
0.0050
Harga Satuan
Jumlah Harga
Bahan
Upah
59,146.50
380.79
8,871.98
53,231.85
0.00
121,631.12
753,413.75
753,413.75
Jumlah Harga
Bahan
Upah
563.30
325.00
844.95
25,348.50
0.00
27,081.75
0.00
0.00
0.00
0.00
114,518.89
114,518.89
Jumlah Harga
Bahan
Upah
-
572
572
572
572
206 Mandor
211 Kepala Tukang Kayu
243 Tukang Kayu
9103 Kunci Pintu Kamar Mandi
Jumlah
OH
OH
OH
0.0025
0.0050
0.5000
Buah
1.0000
0.00
-
AnlsID
ResID
Sat.
Koef.
Harga Satuan
ResID
0.0150
0.0008
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
844.95
58.58
1,267.43
7,604.55
Buah
1.0000
30,136.55
0.00
9,775.51
Sat.
Koef.
Harga Satuan
ResID
Upah
0.0100
0.0005
0.0100
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
563.30
36.61
844.95
5,069.70
Buah
1.0000
24,109.24
0.00
6,514.56
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0150
0.0008
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
Buah
1.0000
21,095.59
30,136.55
30,136.55
Jumlah Harga
Bahan
OH
OH
OH
OH
Jumlah
AnlsID
Upah
OH
OH
OH
OH
Jumlah
AnlsID
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
24,109.24
24,109.24
Jumlah Harga
Bahan
Upah
844.95
58.58
1,267.43
7,604.55
0.00
21,095.59
Jumlah
9,775.51
21,095.59
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0100
0.0005
0.0100
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
563.30
36.61
844.95
5,069.70
Buah
1.0000
12,054.62
0.00
6,514.56
Jumlah
AnlsID
ResID
Sat.
Koef.
Harga Satuan
ResID
Upah
OH
OH
OH
OH
0.0200
0.0100
0.0200
0.2000
56,330.00
73,229.00
84,495.00
50,697.00
1,126.60
732.29
1,689.90
10,139.40
Buah
1.0000
12,054.62
0.00
13,688.19
Jumlah
AnlsID
Upah
Sat.
OH
OH
OH
OH
Koef.
0.0600
0.0030
0.0600
0.6000
Harga Satuan
56,330.00
73,229.00
84,495.00
50,697.00
Upah
3,379.80
219.69
5,069.70
30,418.20
Jumlah Harga
Bahan
0.00
0.00
0.00
0.00
12,054.62
12,054.62
Jumlah Harga
Bahan
12,054.62
12,054.62
Jumlah Harga
Bahan
-
586
Buah
1.0000
150,682.75
Jumlah
AnlsID
ResID
AnlsID
ResID
1102 Semen PC
1104 Semen Warna
1252 Pasir Pasang
9243 Keramik Lantai KM 20 x 20 cm
Jumlah
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.0150
0.0008
0.0150
0.1500
56,330.00
73,229.00
84,495.00
50,697.00
M2
1.1000
133,806.28
Sat.
OH
OH
OH
OH
KG
KG
M3
BUAH
Koef.
Harga Satuan
0.6200
0.0300
0.0350
0.3500
56,330.00
73,229.00
84,495.00
50,697.00
11.3800
1.5000
0.0420
25.0000
1,126.60
2,253.20
204,233.21
2,109.56
0.00
39,087.39
Upah
150,682.75
150,682.75
Jumlah Harga
Bahan
844.95
58.58
1,267.43
7,604.55
0.00
9,775.51
Upah
34,924.60
2,196.87
2,957.33
17,743.95
0.00
0.00
0.00
0.00
57,822.75
0.00
0.00
0.00
0.00
147,186.91
147,186.91
Jumlah Harga
Bahan
12,820.71
3,379.80
8,577.79
52,738.96
77,517.27
AnlsID
ResID
Sat.
AnlsID
1102 Semen PC
1104 Semen Warna
1252 Pasir Pasang
9229 Keramik Lantai 40 x 40 cm Warna/Putih
Jumlah
ResID
1102 Semen PC
1104 Semen Warna
1252 Pasir Pasang
9238 Keramik Dinding 20 x 25 cm
Jumlah
KG
KG
M3
BUAH
Sat.
OH
OH
OH
OH
KG
KG
M3
BUAH
Koef.
Harga Satuan
0.6000
0.0300
0.0300
0.3000
56,330.00
73,229.00
84,495.00
50,697.00
9.8000
1.3000
0.0215
6.9300
1,126.60
2,253.20
204,233.21
10,843.53
Koef.
0.6000
0.0300
0.0450
0.1000
9.3000
1.5000
0.0180
20.0000
Harga Satuan
Jumlah Harga
Bahan
Upah
33,798.00
2,196.87
2,534.85
15,209.10
0.00
0.00
0.00
0.00
53,738.82
11,040.68
2,929.16
4,391.01
75,145.63
93,506.48
Jumlah Harga
Bahan
Upah
-
0.00
0.00
0.00
0.00
-
AnlsID
ResID
1102 Semen PC
1224 Batu Palimanan
1252 Pasir Pasang
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.6000
0.0300
0.0450
0.1000
56,330.00
73,229.00
84,495.00
50,697.00
KG
m2
M3
9.3000
1.0500
0.0180
1,126.60
96,275.43
204,233.21
Jumlah
AnlsID
ResID
Sat.
Koef.
Upah
Jumlah Harga
Bahan
33,798.00
2,196.87
3,802.28
5,069.70
0.00
0.00
0.00
44,866.85
10,477.38
101,089.20
3,676.20
115,242.78
Harga Satuan
Jumlah Harga
Upah
Bahan
Pengecetan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Dengan sistem 1 Lapis Cat Mutakhir, Tebal 200 UM
679
201 Pekerja
OH
0.4000
56,330.00
22,532.00
679
206 Mandor
OH
0.2000
73,229.00
14,645.80
679
213 Kepala Tukang Cat
OH
0.2000
84,495.00
16,899.00
679
248 Tukang Cat
OH
0.7000
50,697.00
35,487.90
679
KG
0.3000 Err:509
0.00
89,564.70
Jumlah
AnlsID
ResID
Sat.
OH
Koef.
0.5000
Harga Satuan
56,330.00
Jumlah Harga
Upah
28,165.00
Err:509
Err:509
Bahan
-
680
680
680
680
680
680
680
206 Mandor
216 Kepala Tukang Listrik
255 Tukang Listrik
3043 Pipa PVC 5/8 (6M)
9322 Kabel NYA 2.5 MM
9348 Stop Kontak
9350 T Dos PVC
Jumlah
OH
OH
OH
0.0500
0.0500
0.5000
73,229.00
84,495.00
56,330.00
3,661.45
4,224.75
28,165.00
LJR
M'
BH
BH
0.6500
15.0000
1.0000
1.0000
9,040.97
2,230.10
24,109.24
783.55
0.00
0.00
0.00
0.00
64,216.20
5,876.63
33,451.57
24,109.24
783.55
64,220.99
AnlsID
ResID
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.5000
0.0500
0.0500
0.5000
56,330.00
73,229.00
84,495.00
56,330.00
28,165.00
3,661.45
4,224.75
28,165.00
LJR
BH
M'
M'
BH
BH
BH
BH
1.0000
1.0000
15.0000
20.0000
1.0000
6.0000
1.0000
2.0000
9,040.97
9,040.97
602.73
2,230.10
33,150.21
421.91
30,136.55
783.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64,216.20
Jumlah
AnlsID
ResID
Jumlah Harga
Upah
Sat.
Koef.
Harga Satuan
OH
OH
OH
OH
0.5000
0.0500
0.0500
0.5000
56,330.00
73,229.00
84,495.00
56,330.00
LJR
BH
M'
1.0000
1.0000
15.0000
9,040.97
9,040.97
602.73
Jumlah Harga
Upah
28,165.00
3,661.45
4,224.75
28,165.00
0.00
0.00
0.00
Bahan
9,040.97
9,040.97
9,040.97
44,602.09
33,150.21
2,531.47
30,136.55
1,567.10
139,110.31
Bahan
9,040.97
9,040.97
9,040.97
689
689
689
689
689
M'
BH
BH
BH
BH
Jumlah
20.0000
1.0000
6.0000
1.0000
2.0000
2,230.10
248,415.30
421.91
30,136.55
783.55
0.00
0.00
0.00
0.00
0.00
64,216.20
44,602.09
248,415.30
2,531.47
30,136.55
1,567.10
354,375.41
AnlsID
ResID
AnlsID
ResID
Pengecatan
669
669
669
669
669
669
669
Sat.
0.9500
0.0095
0.0095
0.0950
LJR
M'
Unit
2.0000
8.0000
1.0000 Err:509
Sat.
Kg
Lbr
Kg
Jumlah
Harga Satuan
OH
OH
OH
OH
Koef.
Koef.
56,330.00
73,229.00
84,495.00
56,330.00
9,040.97
6,630.04
Harga Satuan
Jumlah Harga
Upah
Bahan
53,513.50
695.68
802.70
5,351.35
0.00
0.00
0.00
60,363.23
Jumlah Harga
Upah
0.0200
0.0025
0.0063
0.0630
56,330.00
73,229.00
84,495.00
50,697.00
1,126.60
183.07
532.32
3,193.91
0.1000
0.2600
0.1000
54,877.95
48,168.35
14,103.91
0.00
0.00
0.00
5,035.90
18,081.93
53,040.33
71,122.26
Bahan
5,487.79
12,523.77
1,410.39
19,421.96
AnlsID
ResID
Sat.
Koef.
Harga Satuan
Jumlah Harga
Upah
OH
OH
OH
OH
0.5000
0.0500
0.0500
0.5000
56,330.00
73,229.00
84,495.00
56,330.00
28,165.00
3,661.45
4,224.75
28,165.00
LJR
BH
M'
M'
BH
BH
BH
BH
1.0000
1.0000
15.0000
20.0000
1.0000
6.0000
1.0000
2.0000
9,040.97
9,040.97
602.73
2,230.10
27,122.90
421.91
30,136.55
783.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64,216.20
Bahan
9,040.97
9,040.97
9,040.97
44,602.09
27,122.90
2,531.47
30,136.55
1,567.10
133,083.00
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
16,899.00
1,464.58
1,689.90
10,139.40
0.00
0.00
0.00
45,935.33
0.00
76,128.21
0.00
0.00
46,515.21
46,515.21
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
1,876.77
107,243.93
107,243.93
191,196.88
140,383.75
547,945.25
Jumlah Harga
JUMLAH
Alat
0.00
0.00
48,218.48
0.00
0.00
0.00
48218.48
Jumlah Harga
91,046.13
782.24
48,218.48
Err:509
Err:509
JUMLAH
Alat
0.00
0.00
68,284.60
3,492.13
4942.39
4942.39
4,942.39
76,719.13
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
81,941.52
6,285.84
88,227.36
Jumlah Harga
JUMLAH
Alat
0.00
0.00
22,761.53
1,159.39
4942.39
4942.39
4,942.39
28,863.32
Jumlah Harga
JUMLAH
Alat
0.00
0.00
27,313.84
1,396.85
0.00
348,257.97
4942.39
4942.39
4,942.39
381,911.06
Jumlah Harga
JUMLAH
Alat
0.00
27,313.84
0.00
1,396.85
0.00
116,330.40
34476.21
34476.21
34,476.21
179,517.31
Jumlah Harga
JUMLAH
Alat
0.00
0.00
22,761.53
3,492.13
0.00
0.00
280,727.03
306,980.69
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
71,015.98
5,447.73
4,815.40
41,825.13
0.00
0.00
0.00
276,915.36
125,372.87
525,392.47
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
136,569.20
10,476.40
9,260.39
80,432.95
0.00
0.00
227,573.20
276,915.36
0.00
0.00
99,053.11
840,280.60
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
27,313.84
2,095.28
1,234.72
10,724.39
0.00
0.00
0.00
0.00
16,189.24
59,146.50
8,169.33
124,873.30
Jumlah Harga
JUMLAH
Alat
2008-10)
0.00
0.00
0.00
0.00
16,899.00
1,098.44
844.95
5,069.70
0.00
0.00
0.00
0.00
10,905.49
59,146.50
9,190.49
103,154.57
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
16,899.00
1,098.44
1,267.43
7,604.55
0.00
0.00
0.00
8,760.44
4,697.36
40,327.22
Jumlah Harga
JUMLAH
Alat
Jumlah Harga
0.00
0.00
0.00
0.00
16,899.00
1,098.44
1,267.43
7,604.55
0.00
0.00
0.00
5,840.29
5,310.06
38,019.77
JUMLAH
JUMLAH
Alat
0.00
0.00
0.00
0.00
11,266.00
732.29
844.95
5,069.70
0.00
0.00
3,661.45
21,574.39
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
112,660.00
73,229.00
2,957.33
17,743.95
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
828,351.75
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
298,549.00
22,137.69
19,405.69
13,941.68
53,231.85
65,906.10
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
1,975,865.13
34,451.50
45,808.57
0.00
0.00
82,815.24
82,815.24
280,523.40
1,205.46
82,815.24
3,515,602.78
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
318,264.50
27,291.89
20,723.81
13,941.68
70,975.80
79,087.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
2,634,486.84
45,935.33
61,078.09
378,706.59
1,808.19
82,815.24
82,815.24
Jumlah Harga
82,815.24
4,356,876.75
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
397,126.50
34,051.49
25,849.84
13,941.68
106,463.70
83,650.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
4,781,246.40
91,870.67
91,617.13
514,503.60
713,560.28
561,046.80
389,381.13
6,027.31
82,815.24
82815.24
82,815.24
8,514,913.28
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
357,695.50
28,136.84
23,286.82
13,941.68
70,975.80
83,650.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378,537.60
183,380.30
59,843.58
2,634,486.84
73,496.54
61,078.09
263,354.02
665,989.59
448,837.44
311,504.90
4,821.85
82,815.24
82,815.24
Jumlah Harga
82,815.24
5,745,832.66
JUMLAH
Alat
0.00
1,126.60
0.00
0.00
0.00
6,246.05
0.00
0.00
6,246.05
0.00
0.00
1,520.91
6,246.05
12,696.92
663.00
22,253.49
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
6,246.05
0.00
0.00
6,246.05
Jumlah Harga
6,246.05
12,696.92
663.00
22,253.49
JUMLAH
Alat
Jumlah Harga
1,126.60
0.00
0.00
1,520.91
0.00
0.00
0.00
0.00
394,310.00
25,630.15
177,439.50
1,064,637.00
0.00
0.00
0.00
0.00
5,527,500.00
28,709.58
40,868.78
7,259,095.01
JUMLAH
JUMLAH
Alat
0.00
0.00
0.00
0.00
56,330.00
3,661.45
25,348.50
152,091.00
0.00
0.00
0.00
311,009.20
20,434.39
568,874.54
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
56,330.00
3,661.45
25,348.50
152,091.00
0.00
0.00
0.00
311,009.20
20,434.39
568,874.54
Jumlah Harga
JUMLAH
Alat
Jumlah Harga
Alat
0.00
0.00
0.00
0.00
37,741.10
24,531.72
16,899.00
101,394.00
0.00
0.00
0.00
3,445.15
466,513.79
650,524.76
JUMLAH
0.00
0.00
0.00
0.00
5,633.00
3,661.45
844.95
5,069.70
0.00
0.00
0.00
1,378.06
38,719.44
55,306.60
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
8,449.50
585.83
422.48
2,534.85
0.00
0.00
22,179.94
34,172.59
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
5,633.00
732.29
844.95
50,697.00
0.00
0.00
0.00
617.20
106,767.88
165,292.32
Jumlah Harga
JUMLAH
Alat
0.00
0.00
5,633.00
732.29
0.00
0.00
844.95
50,697.00
0.00
0.00
0.00
617.20
103,151.50
161,675.93
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah Harga
56,330.00
11,716.64
126,742.50
76,045.50
6,759.60
2,042.33
150,682.75
430,319.32
JUMLAH
Alat
0.00
0.00
0.00
0.00
67,596.00
7,322.90
126,742.50
73,510.65
0.00
0.00
0.00
0.00
6,759.60
2,042.33
452,048.25
736,022.23
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
563.30
366.15
844.95
5,069.70
0.00
0.00
30,136.55
36,980.65
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
337,980.00
21,968.70
25,348.50
152,091.00
0.00
0.00
0.00
0.00
0.00
0.00
135,192.00
13,519.20
337.98
61,269.96
225,421.39
973,128.74
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
21,405.40
1,391.35
1,605.41
9,632.43
0.00
0.00
0.00
0.00
0.00
0.00
10,443.58
188,212.61
11,212.40
18,022.35
198,901.23
460,826.76
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
121,672.80
7,908.73
60,836.40
36,501.84
128,432.40
141,064.40
7,471.05
13,298.57
37,578.91
47,563.66
602,328.77
Jumlah Harga
JUMLAH
Alat
2,027.88
131.81
506.97
3,041.82
0.00
0.00
Jumlah Harga
56,417.14
62,125.62
JUMLAH
Alat
0.00
0.00
Jumlah Harga
3,041.82
197.72
760.46
4,562.73
56,417.14
64,979.87
JUMLAH
Alat
0.00
0.00
0.00
0.00
563.30
366.15
844.95
5,069.70
0.00
0.00
-
Jumlah Harga
783.55
42,191.17
49,818.82
JUMLAH
Alat
0.00
0.00
0.00
0.00
844.95
58.58
1,267.43
7,604.55
0.00
-
109,336.53
119,112.04
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
-
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
36,614.50
2,343.33
5,492.18
32,953.05
0.00
-
299,900.92
377,303.97
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
59,146.50
380.79
8,871.98
53,231.85
0.00
-
753,413.75
875,044.87
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
563.30
325.00
844.95
25,348.50
0.00
0.00
114,518.89
141,600.64
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
-
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah Harga
844.95
58.58
1,267.43
7,604.55
30,136.55
39,912.06
JUMLAH
Alat
0.00
0.00
0.00
0.00
563.30
36.61
844.95
5,069.70
0.00
0.00
24,109.24
30,623.80
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
844.95
58.58
1,267.43
7,604.55
0.00
21,095.59
0.00
30,871.09
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
563.30
36.61
844.95
5,069.70
0.00
0.00
12,054.62
18,569.18
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
1,126.60
732.29
1,689.90
10,139.40
0.00
-
12,054.62
25,742.81
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
3,379.80
219.69
5,069.70
30,418.20
0.00
-
Jumlah Harga
150,682.75
189,770.14
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah Harga
844.95
58.58
1,267.43
7,604.55
147,186.91
156,962.42
JUMLAH
Alat
0.00
0.00
0.00
0.00
34,924.60
2,196.87
2,957.33
17,743.95
0.00
0.00
0.00
0.00
0.00
12,820.71
3,379.80
8,577.79
52,738.96
135,340.01
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
33,798.00
2,196.87
2,534.85
15,209.10
0.00
0.00
0.00
0.00
-
11,040.68
2,929.16
4,391.01
75,145.63
147,245.30
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
Jumlah Harga
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
33,798.00
2,196.87
3,802.28
5,069.70
10,477.38
101,089.20
3,676.20
160,109.62
JUMLAH
Alat
22,532.00
14,645.80
16,899.00
35,487.90
Err:509
Err:509
JUMLAH
Alat
0.00
28,165.00
0.00
0.00
0.00
3,661.45
4,224.75
28,165.00
0.00
0.00
0.00
0.00
-
5,876.63
33,451.57
24,109.24
783.55
128,437.19
JUMLAH
Alat
0.00
0.00
0.00
0.00
28,165.00
3,661.45
4,224.75
28,165.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
9,040.97
9,040.97
9,040.97
44,602.09
33,150.21
2,531.47
30,136.55
1,567.10
203,326.51
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,165.00
3,661.45
4,224.75
28,165.00
9,040.97
9,040.97
9,040.97
0.00
0.00
0.00
0.00
0.00
-
44,602.09
248,415.30
2,531.47
30,136.55
1,567.10
418,591.61
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
53,513.50
695.68
802.70
5,351.35
18,081.93
53,040.33
131,485.49
JUMLAH
Alat
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1,126.60
183.07
532.32
3,193.91
5,487.79
12,523.77
1,410.39
24,457.86
JUMLAH
Alat
0.00
0.00
0.00
0.00
28,165.00
3,661.45
4,224.75
28,165.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
9,040.97
9,040.97
9,040.97
44,602.09
27,122.90
2,531.47
30,136.55
1,567.10
197,299.20
RESID
1255
1260
2000
2004
2005
2100
2106
2200
2201
2205
2303
2316
3000
3043
3054
4000
4006
6000
6011
6020
6021
6022
6030
6031
6032
6033
6059
6089
7000
7022
7100
7113
7115
7120
7121
7126
7127
7128
7147
7153
7160
8000
8324
8404
8405
9000
9015
9018
9025
9028
9100
9102
9103
9105
9106
9107
9109
9110
9111
9116
9127
9130
9141
9150
9200
9228
9229
9232
9233
9234
9238
9239
9242
9243
9300
9313
9318
9322
9323
9334
9337
9338
9339
9335
9343
9344
9345
9348
9350
9429
NAMA RESOURCE
pasir Urug
Sirtu
BESI
Besi Beton
Besi Beton Polos
BAJA
Baja Profil (WF/C)
PAKU-KAWAT-BAUT-MUR-ANGKUR
Paku
Paku uk. 6-7 cm
Kawat Beton
Kawat Las
PIPA
Pipa PVC 5/8 ( 6 m)
Pipa PVC Tipe AW dia. 3 (6 m)
BETON
Buis Beton dia. 0,80 m
KAYU
Dolken Kayu dia. 8 cm
Kayu Balok Kelas I
Kayu Balok Kelas II
Kayu Balok Kelas III
Kayu Kelas III
Kayu Papan Kelas I
Kayu Papan Kelas II
Kayu Papan Kelas III
Plywood (T= 9 mm)
Papan (2x20) cm (Borneo)
PELUMAS-PEREKAT-BAHAN BAKAR
Minyak Bekisting
CAT PLASTIK
Cat Dasar Tembok
Cat Kayu
Cat Meni Kayu
Cat Tembok
Dempul
Dempul Jadi
Dempul Kayu
Lem Kayu
Plamur
Sabun
ATAP
Bubung Atap Seng Galvalum
Atap Seng Galvalum
Aluminium Foil/Sesalation
PLUMBING
Kloset Jongkok Porselin Kw. A
Kran Air 3/4
Tempat Sabun Keramik
Wastafel Komplit (Kran + Sipon) Kw. A
PINTU, JENDELA, KACA
Kunci Tanam
Kunci Pintu Kamar Mandi
Engsel Pintu
Engsel Jendela
Hak Angin
Kait Angin
Grendel Pintu
Grendel Jendela
Rel Pintu Dorong
Kaca Cermin Tebal 5 mm
Kaca Rayben Tebal 3 mm
Pintu Besi Baja
Pintu Fiber KM
LANTAI
Keramik Lantai 40 x 40 cm Putih
Keramik Lantai 40 x 40 cm Warna/Putih
Keramik Lantai 20 x 20 cm Putih
Keramik Lantai 20 x 20 cm Warna/Motif
Keramik Lantai KM 20 x 20 cm
Dinding Keramik 20 x 25 cm
Dinding Keramik 20 x 20 cm
Porselin 10 x 20 cm Warna
Porselin 20 x 20 cm Warna
LISTRIK
Fitting Plafond
Isolator
Kabel NYA 2,5 mm
Kabel NYA 4,0 mm
Lampu XL 18 Watt
Lampu XL 8 Watt
Las Doof
Panel Listrik
Lampu XL 80 Watt
Saklar Broco
Saklar Ganda
Saklar Tunggal
Stop Kontak
T Dos PVC
MCB 40 Amp / 10 KA
N TAHUN 2014
ALAT
SATUAN
HARGA
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
50,000.00
75,000.00
65,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
50,000.00
KG
KG
ZAK
ZAK
1,000.00
2,000.00
61,702.62
86,000.00
M3
M3
M3
BUAH
M3
M2
M3
M3
M3
M3
M3
SATUAN
M3
M3
HARGA
200,954.58
200,954.58
96,942.00
750.00
204,831.17
85,456.62
167,508.50
229,282.81
98,368.05
222,132.00
181,282.81
56,330.00
84,495.00
73,229.00
84,495.00
84,495.00
84,495.00
84,495.00
84,495.00
84,495.00
50,697.00
50,697.00
50,697.00
50,697.00
50,697.00
56,330.00
1,126.60
2,253.20
69,514.17
96,887.60
226,395.43
226,395.43
109,214.86
844.95
230,762.80
96,275.43
188,715.08
258,310.01
110,821.45
250,253.91
204,233.21
HARGA
257,602.50
207,650.62
290,214.98
233,939.19
-
KG
KG
11,135.43
8,704.90
14,610.00
5,025,000.00
4,222,500.00
968,000.00
1,245,000.00
6,901,500.00
6,741,000.00
2,066,000.00
98,750.00
3,905,500.00
12,545.18
9,806.94
12,092.30
22,967.67
15,429.91
20,359.36
30,136.55
9,040.97
188,057.14
180,819.30
16,459.63
5,661,165.00
4,757,068.50
1,090,548.80
1,402,617.00
7,775,229.90
7,594,410.60
2,327,555.60
111,251.75
4,399,936.30
KG
10,733.45
KG
KG
KG
KG
20,386.71
13,696.00
18,071.51
26,750.00
2,675.00
3,013.66
48,711.12
68,711.12
50,097.40
42,755.50
34,845.62
34,845.62
34,845.62
36,276.21
12,519.00
27,820.00
54,877.95
77,409.95
56,439.73
48,168.35
39,257.08
39,257.08
39,257.08
40,868.78
14,103.91
31,342.01
LAJUR
LAJUR
8,025.00
166,924.50
BUAH
160,500.00
BATANG
M3
M3
M3
M3
M3
M3
M3
LEMBAR
M3
LITER
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
76,300.00
78,975.00
18,750.00
85,959.58
88,973.24
21,123.75
UNIT
BUAH
BUAH
UNIT
133,750.00
37,450.00
26,750.00
401,250.00
150,682.75
42,191.17
30,136.55
452,048.25
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
M2
M2
M2
M2
101,650.00
77,575.00
26,750.00
21,400.00
35,631.00
8,025.00
18,725.00
10,700.00
133,750.00
97,050.00
118,770.00
242,000.00
668,750.00
114,518.89
87,396.00
30,136.55
24,109.24
40,141.88
9,040.97
21,095.59
12,054.62
150,682.75
109,336.53
133,806.28
272,637.20
753,413.75
11,770.00
9,625.00
1,444.50
1,605.00
1,272.50
3,745.00
2,675.00
909.50
1,872.50
13,260.08
10,843.53
1,627.37
1,808.19
1,433.60
4,219.12
3,013.66
1,024.64
2,109.56
8,025.00
535.00
1,979.50
5,885.00
29,425.00
24,075.00
9,040.97
602.73
2,230.10
6,630.04
33,150.21
27,122.90
M2
M2
M2
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
M'
M'
M'
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
BUAH
374.50
55,739,510.00
220,500.00
26,750.00
89,559.00
56,710.00
21,400.00
695.50
308,666.89
421.91
62,796,131.97
248,415.30
30,136.55
100,897.17
63,889.49
24,109.24
783.55
347,744.12
602.41
1.1266
LOKASI
SATUAN KERJA
TAHUN ANGGARAN
:
:
:
FASILITAS BANGUNAN
PEMBUATAN BENGKEL KERJA (WORKSHOP) 200 M2
BANDAR UDARA H. AROEPPALA SELAYAR
BANDAR UDARA H. AROEPPALA SELAYAR
2014
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet & Gudang
2 Pengukuran dan Pas. Bowplank
3 P3K dan Keselamatan Kerja
4 Quality Control, Foto, dan Administrasi
5 Papan Nama Proyek
6 Gambar Kerja dan As Build Drawing
7 Air Kerja
8 Mobilisasi/Demobilisasi Alat dan Tenaga
9 Pembuatan Pas Pekerja
JUMLAH I
II
III
PEKERJAAN BETON
1 Pekerjaan Rabat Beton Lantai
2 Pekerjaan Sloef
3 Pekerjaan Kolom
4 Pekerjaan Poer
5 Pekerjaan Balok Latai
6 Pekerjaan Ring Balk
7 Pekerjaan Kolom Praktis
JUMLAH III
IV
PEKERJAAN DINDING/TEMBOK
1 Pas. Dinding Trasram 1 : 3
2 Pas. Dinding 1 : 5
3 Plesteran Trasram 1 : 3
4 Plesteran Dinding 1 : 5
5 Pekerjaan Acian
JUMLAH IV
NO.
URAIAN PEKERJAAN
PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40 x 40
2 Pas. Lantai KM/WC Keramik 20 x 20
3 Pas. Dinding KM/WC Keramik 20 x 20
JUMLAH V
VI
VII
JUMLAH VIII
NO.
URAIAN PEKERJAAN
IX
PEKERJAAN LISTRIK
1 Pas. Lampu XL 80 Watt
2 Pas. Lampu XL 18 Watt
3 Pas. Lampu XL 8 Watt
4 Pas. Grounding/Pengaman
5 Saklar Tunggal
6 Saklar Ganda
7 Stop Kontak
8 Box MCB/Panel
JUMLAH IX
PEKERJAAN SANITAIR
1 Pasang Closet Jongkok
2 Pasang Wastafel
3 Pasang Kran Air 3/4"
4 Pasang Floordrain
5 Galian Septictank
6 Pas. Gorong-gorong 80 cm
7 Pas. Penutup Septictank
8 Pas. Penutup Lubang Kontrol
10 Pas. Pipa Hawa 3/4"
11 Galian Pipa
12 Pas. Pipa Distribusi 3/4"
14 Pas. Pipa Air Kotor 3/4"
15 Pas. Pipa Air Kotor 3"
16 Pas. Stopkran 3/4"
17 Sambungan Elbow 3/4"
18 Sambungan TEE 3/4"
19 Sambungan Sokhet 3/4"
27 Tempat Sabun Keramik
28 Pasang Bak Mandi Batu Bata
JUMLAH X
XI
PEKERJAAN PENGECETAN
1 Pengecetan Tembok
2 Pengecetan Kusen dan Daun Jendela
3 Pengecetan daun Pintu
4 Pengecetan Residu Untuk Kusen
5 Pengecetan Listplank
6 Pengecetan Pintu Baja
JUMLAH XI
:
:
:
:
FASILITAS BANGUNAN
PEMBUATAN BENGKEL KERJA (WORKSHOP) 200 M2
BANDAR UDARA H. AROEPPALA SELAYAR
BANDAR UDARA H. AROEPPALA SELAYAR
2014
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
III
PEKERJAAN BETON
IV
PEKERJAAN DINDING/TEMBOK
PEKERJAAN LANTAI
VI
VII
PEKERJAAN SANITAIR
XI
PEKERJAAN PENGECETAN
TERBILANG :
HARGA SATUAN
(Rp)
4
VOLUME
3
16.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
M2
Ls
Ls
Ls
Bh
Ls
Ls
Ls
Ls
1,000,000.00
3,000,000.00
3,750,000.00
2,500,000.00
547,945.25
5,000,000.00
750,000.00
10,000,000.00
1,500,000.00
JUMLAH HARGA
(Rp)
5
16,000,000.00
3,000,000.00
3,750,000.00
2,500,000.00
547,945.25
5,000,000.00
750,000.00
10,000,000.00
1,500,000.00
43,047,945.25
149.15
37.29
170.33
15.12
17.59
12.00
42.00
M3
M3
M3
M3
M3
M3
M3
76,719.13
28,863.32
179,517.31
306,980.69
381,911.06
525,392.47
840,280.60
11,442,657.89
1,076,313.05
30,577,182.83
4,641,548.07
6,715,905.98
6,304,709.65
35,291,785.13
96,050,102.60
39.34
3.24
8.15
5.36
2.40
1.80
5.36
M3
M3
M3
M2
M3
M3
M3
828,351.75
4,356,876.75
8,514,913.28
3,515,602.78
3,515,602.78
5,745,832.66
8,514,913.28
32,587,357.98
14,116,280.68
69,353,968.66
18,829,568.49
8,437,446.67
10,342,498.79
45,673,994.83
199,341,116.11
32.40
421.04
117.30
831.95
961.84
M3
M3
M3
M3
M3
124,873.30
103,154.57
40,327.22
38,019.77
21,574.39
4,045,894.98
43,432,457.04
4,730,382.38
31,630,641.00
20,751,165.21
7.87
M3
160,109.62
1,260,463.00
105,851,003.61
HARGA SATUAN
(Rp)
4
VOLUME
3
75.28
6.85
18.60
M2
M2
M2
147,245.30
135,340.01
135,340.01
JUMLAH HARGA
(Rp)
5
11,085,141.72
926,402.37
2,517,324.19
14,528,868.29
1.67
4.96
13.92
1.70
38.40
2.00
2.93
M2
M2
M2
M2
M2
Bh
M2
7,259,095.01
568,874.54
568,874.54
875,044.87
377,303.97
189,770.14
650,524.76
12,105,448.32
2,819,342.20
7,917,026.90
1,487,576.27
14,488,472.56
379,540.27
1,904,736.49
41,102,143.02
1,105.44
4,657.80
155.26
4.88
28.94
310.52
Kg
Kg
M2
M2
M2
M2
22,253.49
22,253.49
165,292.32
161,675.93
55,306.60
34,172.59
24,599,894.94
103,652,292.88
25,663,285.38
788,913.88
1,600,794.22
10,611,274.04
166,916,455.34
5.00
4.54
1.50
10.00
94.00
5.00
29.00
94.00
Bh
M2
M2
Bh
Bh
Bh
Bh
Bh
141,600.64
156,962.42
119,112.04
39,912.06
30,623.80
30,871.09
18,569.18
25,742.81
708,003.20
712,075.71
178,668.06
399,120.58
2,878,637.62
154,355.47
538,506.35
2,419,824.14
7,989,191.13
VOLUME
3
6.00
6.00
2.00
1.00
3.00
4.00
9.00
1.00
Bh
Bh
Bh
Unit
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
4
418,591.61
203,326.51
197,299.20
250,000.00
63,889.49
100,897.17
24,109.24
347,744.12
JUMLAH HARGA
(Rp)
5
2,511,549.66
1,219,959.09
394,598.41
250,000.00
191,668.46
403,588.68
216,983.16
347,744.12
5,536,091.57
1.00
2.00
3.00
2.00
1.51
3.00
1.00
1.00
1.78
0.48
18.90
7.00
5.10
3.00
8.00
5.00
3.00
2.00
1.00
Bh
Bh
Bh
Bh
M3
M'
Bh
Bh
M'
M3
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
430,319.32
736,022.23
49,818.82
71,400.00
76,719.13
460,826.76
195,995.00
55,000.00
62,125.62
76,719.13
62,125.62
62,125.62
64,979.87
49,818.82
4,000.00
3,500.00
4,000.00
36,980.65
973,128.74
430,319.32
1,472,044.46
149,456.45
142,800.00
115,631.07
1,382,480.29
195,995.00
55,000.00
110,583.61
36,710.10
1,174,174.31
434,879.37
331,397.32
149,456.45
32,000.00
17,500.00
12,000.00
73,961.29
973,128.74
7,289,517.78
945.00
43.02
9.91
15.19
21.22
76.80
M2
M2
M2
M2
M2
M2
24,457.86
30,305.00
30,305.00
16,500.00
30,305.00
72,235.00
23,112,675.20
1,303,766.56
300,383.16
250,593.75
642,950.88
5,547,648.00
31,158,017.55
ANGGARAN BIAYA
JUMLAH HARGA
AAN
(Rp)
43,047,945.25
96,050,102.60
199,341,116.11
105,851,003.61
14,528,868.29
41,102,143.02
166,916,455.34
7,989,191.13
5,536,091.57
7,289,517.78
31,158,017.55
Jumlah
718,810,452.2
PPN 10 %
Total
Pembulatan
71,881,045.22
790,691,497.5
790,000,000.0
Selayar,
2014
KEPALA BANDAR UDARA
H. AROEPPALA - SELAYAR
LOKASI
SATUAN KERJA
TAHUN ANGGARAN
:
:
:
FASILITAS BANGUNAN
PEMBUATAN BENGKEL KERJA (WORKSHOP) 200 M2
BANDAR UDARA H. AROEPPALA SELAYAR
BANDAR UDARA H. AROEPPALA SELAYAR
2014
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet & Gudang
2 Pengukuran dan Pas. Bowplank
3 P3K dan Keselamatan Kerja
4 Quality Control, Foto, dan Administrasi
5 Papan Nama Proyek
6 Gambar Kerja dan As Build Drawing
7 Air Kerja
8 Mobilisasi/Demobilisasi Alat dan Tenaga
9 Pembuatan Pas Pekerja
JUMLAH I
II
III
PEKERJAAN BETON
1 Pekerjaan Rabat Beton Lantai
2 Pekerjaan Sloef
3 Pekerjaan Kolom
4 Pekerjaan Poer
5 Pekerjaan Balok Latai
6 Pekerjaan Ring Balk
7 Pekerjaan Kolom Praktis
JUMLAH III
IV
PEKERJAAN DINDING/TEMBOK
1 Pas. Dinding Trasram 1 : 3
2 Pas. Dinding 1 : 5
3 Plesteran Trasram 1 : 3
4 Plesteran Dinding 1 : 5
5 Pekerjaan Acian
JUMLAH IV
NO.
URAIAN PEKERJAAN
PEKERJAAN LANTAI
1 Pas. Lantai Keramik 40 x 40
2 Pas. Lantai KM/WC Keramik 20 x 20
3 Pas. Dinding KM/WC Keramik 20 x 20
JUMLAH V
VI
VII
JUMLAH VIII
NO.
URAIAN PEKERJAAN
IX
PEKERJAAN LISTRIK
1 Pas. Lampu XL 80 Watt
2 Pas. Lampu XL 18 Watt
3 Pas. Lampu XL 8 Watt
4 Pas. Grounding/Pengaman
5 Saklar Tunggal
6 Saklar Ganda
7 Stop Kontak
8 Box MCB/Panel
JUMLAH IX
PEKERJAAN SANITAIR
1 Pasang Closet Jongkok
2 Pasang Wastafel
3 Pasang Kran Air 3/4"
4 Pasang Floordrain
5 Galian Septictank
6 Pas. Gorong-gorong 80 cm
7 Pas. Penutup Septictank
8 Pas. Penutup Lubang Kontrol
10 Pas. Pipa Hawa 3/4"
11 Galian Pipa
12 Pas. Pipa Distribusi 3/4"
14 Pas. Pipa Air Kotor 3/4"
15 Pas. Pipa Air Kotor 3"
16 Pas. Stopkran 3/4"
17 Sambungan Elbow 3/4"
18 Sambungan TEE 3/4"
19 Sambungan Sokhet 3/4"
27 Tempat Sabun Keramik
28 Pasang Bak Mandi Batu Bata
JUMLAH X
XI
PEKERJAAN PENGECETAN
1 Pengecetan Tembok
2 Pengecetan Kusen dan Daun Jendela
3 Pengecetan daun Pintu
4 Pengecetan Residu Untuk Kusen
5 Pengecetan Listplank
6 Pengecetan Pintu Baja
JUMLAH XI
:
:
:
:
FASILITAS BANGUNAN
PEMBUATAN BENGKEL KERJA (WORKSHOP) 200 M2
BANDAR UDARA H. AROEPPALA SELAYAR
BANDAR UDARA H. AROEPPALA SELAYAR
2014
NO.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
II
III
PEKERJAAN BETON
IV
PEKERJAAN DINDING/TEMBOK
PEKERJAAN LANTAI
VI
VII
PEKERJAAN SANITAIR
XI
PEKERJAAN PENGECETAN
TERBILANG :
UANTITY ( BOQ )
HARGA SATUAN
(Rp)
4
VOLUME
3
16.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
M2
Ls
Ls
Ls
Bh
Ls
Ls
Ls
Ls
149.15
37.29
170.33
15.12
17.59
12.00
42.00
M3
M3
M3
M3
M3
M3
M3
39.34
3.24
8.15
5.36
2.40
1.80
5.36
M3
M3
M3
M2
M3
M3
M3
32.40
421.04
117.30
831.95
961.84
M3
M3
M3
M3
M3
JUMLAH HARGA
(Rp)
5
7.87
M3
HARGA SATUAN
(Rp)
4
VOLUME
3
75.28
6.85
18.60
M2
M2
M2
1.67
4.96
13.92
1.70
38.40
2.00
2.93
M2
M2
M2
M2
M2
Bh
M2
1,105.44
4,657.80
155.26
4.88
28.94
310.52
Kg
Kg
M2
M2
M2
M2
5.00
4.54
1.50
10.00
94.00
5.00
29.00
94.00
Bh
M2
M2
Bh
Bh
Bh
Bh
Bh
JUMLAH HARGA
(Rp)
5
VOLUME
3
6.00
6.00
2.00
1.00
3.00
4.00
9.00
1.00
Bh
Bh
Bh
Unit
Bh
Bh
Bh
Bh
1.00
2.00
3.00
2.00
1.51
3.00
1.00
1.00
1.78
0.48
18.90
7.00
5.10
3.00
8.00
5.00
3.00
2.00
1.00
Bh
Bh
Bh
Bh
M3
M'
Bh
Bh
M'
M3
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
945.00
43.02
9.91
15.19
21.22
76.80
M2
M2
M2
M2
M2
M2
HARGA SATUAN
(Rp)
4
JUMLAH HARGA
(Rp)
5
LL OF QUANTITY ( BOQ )
JUMLAH HARGA
AAN
(Rp)
Jumlah
PPN 10 %
Total
Pembulatan
Selayar,
2014
KEPALA BANDAR UDARA
H. AROEPPALA - SELAYAR