Professional Documents
Culture Documents
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
117 MATERIALS
117.20 CONCRETE MATERIAL PROPERTIES
ID
Label
f'c
Unit Weight
Type
Ec
1
2
M350
M400
N/mm2
22.000
25.000
kg/m3
2400.00
2400.00
Normal
Normal
N/mm2
23574
32500
Creep
coefficient
Label
SD490
fy
N/mm2
490.000
fvy
N/mm2
490.000
Es
N/mm2
200000
Label
Gr270
fpu
N/mm2
1860.000
fpy
N/mm2
1700.000
Eps
N/mm2
200000
2.00
2.00
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
ACI 2005/IBC 2005 strength reduction factors used:
For bending
= 0.90
For shear one-way
= 0.75
142.30 COVER TO REINFORCEMENT
Two-way Slabs
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom
One-way Slabs
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom
Beams
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom
= 40 mm
= 40 mm
= 15 mm
= 15 mm
= 40 mm
= 40 mm
= 15 mm
= 15 mm
= 40 mm
= 40 mm
= 35 mm
= 35 mm
= 0.17
= 300 mm
= 300 mm
= 0.17
= 300 mm
= 300 mm
= 0.17
= 300 mm
= 300 mm
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
= 0.50
= 0.50
= 0.25
= 0.25
= 0.50
= 0.50
= 0.45
= 0.60
= 0.60
= 0.50
= 0.50
= 0.25
= 0.25
= 0.50
= 0.50
= 0.45
= 0.60
= 0.60
143.30 BEAMS
Sustain load stresses
Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
= 0.50
= 0.50
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
Extreme fiber
= 0.45
= 0.25
= 0.25
= 0.50
= 0.50
= 0.60
= 0.60
400
400
S1000
S1000
400x900
S1000
S1000
S1000
S1000
S1000
300
300
500x600
S1000
400
S1000
300
400
400
S1000
400
400
S1000
300
300
300
400
500x600
S1000
200
400
300
400
S1000
400
300
400x900
S1000
1000x600
400
300
1000x600
S1000
S1000
500x600
S1000
S1000
S1000
1000x600
1000x600
S1000
300
400
S1000
1000x600
1000x600
1000x600
1000x600
S1000
500x600
400
REPORT_Plan Geometry
02/24/10
18:33:51
06-22F.adm
VNCC
Calc. by NMT
160
45
160
160
40
100
100
85
45
160
40
45
40
45
45
160
160
45
40
45
S=15100
500
160
100
40
45
160
800
45
45
45
45
S=16100 500
160
160
85
100
160
160
500 100
40
85
500
100
160
100
45
40
100
160
100
800
100
45
160
160
85
45
45
160
40
500 500
40
100 500
160
S=40
40
40
45
160
160
45
40
S=25500 500
S=20100500
40
40
40
S=16100 500
160
160
45
45
40
160
160
160
S=16100 500
500 500
45
160
45
S=16100 500
45
45
S=25
S=40100 500
500 500
S=15100
500
160
40
160
40
160
45
500 100
160
40
160
40
160
45
500
100
500 500
500 100
S=15
S=25
S=20
500 500
500100
500 100
REPORT_Tendon Plan
02/24/10
18:33:55
06-22F.adm
VNCC
Calc. by NMT
VNCC
Calc. by NMT
Fz=3.00e+1
Fz=3.00e+1
Fz=3.00e+1
Fz=3.00e+1
Fz=2.50
Fz=2.50
Fz=2.50
Fz=1.70
Fz=3.50
Fz=3.00e+1
Fz=3.00e+1
Fz=3.00e+1
Fz=3.00e+1
Fz=2.50
VNCC
Calc. by NMT
Fz=3.00
Fz=3.50
VNCC
Calc. by NMT
Support Line 14
Support Line 1
Support Line 9
Support Line 10
Support Line 8
Support Line 15
VNCC
Calc. by NMT
Support Line 13
Support Line 7
Support Line 6
Support Line 5
Support Line 11
Support Line 12
Calc. by NMT
06-22F.adm
Support Line 4
VNCC
Support Line 3
Support Line 2
Support Line 14
Support Line 1
Support Line 9
Support Line 10
Support Line 8
Support Line 15
VNCC
Calc. by NMT
Support Line 13
Support Line 7
Support Line 6
Support Line 5
Support Line 11
Support Line 12
Calc. by NMT
06-22F.adm
Support Line 4
VNCC
Support Line 3
Support Line 2
Support Line 14
Support Line 1
Support Line 9
Support Line 10
Support Line 8
Support Line 15
VNCC
Calc. by NMT
Support Line 13
Support Line 7
Support Line 6
Support Line 5
Support Line 11
Support Line 12
Calc. by NMT
06-22F.adm
Support Line 4
VNCC
Support Line 3
Support Line 2
REPORT_Mesh
02/24/10
18:34:33
06-22F.adm
VNCC
Calc. by NMT
3-10mmx4000mm(B)
3-10mmx4000mm(B)
3-10mmx4000mm(B)
3-10mmx4000mm(B)
REPORT_Rebar
02/24/10
18:34:38
06-22F.adm
VNCC
Calc. by NMT
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
DESIGN LEGEND
This legend is provided as an aid for the interpretation of the results that follow.
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 1
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
1
1
0
Stress [N/mm]
Stress [N/mm]
-1
-2
-1
-2
-3
-3
-4
-4
Span 1
Span 2
Span 3
Span 1
Span 2
Span 3
Moment [kNm]
-100
-50
0
50
100
150
Span 1
Span 2
Span 3
1.00
0.75
Rebar [mm]
0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1
Span 2
Span 3
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 2
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
-0.5
Allowable Stresses
-1.0
Stress [N/mm]
Stress [N/mm]
-1
-1.5
-2.0
-2.5
-2
-3
-3.0
-4
-3.5
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-100
-50
0
50
100
150
200
250
Span 1
Span 2
Span 3
Span 4
Span 5
400
300
Rebar [mm]
200
100
-100
-200
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 3
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
0.0
Allowable Stresses
-0.5
-0.5
-1.0
-1.0
Stress [N/mm]
Stress [N/mm]
-1.5
-1.5
-2.0
-2.5
-2.0
-2.5
-3.0
-3.5
-3.0
-4.0
-3.5
-4.5
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-200
-100
100
200
300
Span 1
Span 2
Span 3
Span 4
Span 5
1.00
0.75
Rebar [mm]
0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 4
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
0
-1
Stress [N/mm]
Stress [N/mm]
Allowable Stresses
-2
-3
-1
-2
-3
-4
-4
-5
-5
-6
Span 1
Span 2
Span 1
Span 2
Moment [kNm]
-100
-50
0
50
100
150
200
Span 1
Span 2
300
Rebar [mm]
250
200
150
100
50
0
Span 1
Span 2
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 5
Stress Diagrams
Stress Diagrams
Bottom
-0
-1
Stress [N/mm]
Stress [N/mm]
Top
-1
-2
Allowable Stresses
-2
-3
-4
-3
-5
-4
-6
Span 1
Span 2
Span 1
Span 2
Moment [kNm]
-100
-50
0
50
100
150
200
Span 1
Span 2
300
Rebar [mm]
250
200
150
100
50
0
Span 1
Span 2
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 6
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
0.0
Allowable Stresses
-0.5
-0.5
-1.0
Stress [N/mm]
Stress [N/mm]
-1.0
-1.5
-2.0
-1.5
-2.0
-2.5
-3.0
-2.5
-3.5
-3.0
-4.0
-3.5
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-200
-100
100
200
300
Span 1
Span 2
Span 3
Span 4
Span 5
1.00
0.75
Rebar [mm]
0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1
Span 2
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 7
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
Allowable Stresses
-0.5
0
Stress [N/mm]
Stress [N/mm]
-1.0
-1.5
-2.0
-2.5
-1
-2
-3
-3.0
-4
-3.5
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-100
-50
0
50
100
150
200
250
Span 1
Span 2
Span 3
Span 4
Span 5
300
Rebar [mm]
200
100
-100
-200
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 8
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
1
2
0
1
Stress [N/mm]
Stress [N/mm]
-1
0
-1
-2
-3
-2
-4
-3
-5
-4
Span 1
Span 2
Span 3
Span 1
Span 2
Span 3
Moment [kNm]
-100
-50
0
50
100
150
Span 1
Span 2
Span 3
1.00
0.75
Rebar [mm]
0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1
Span 2
Span 3
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 9
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
1
2
0
Stress [N/mm]
Stress [N/mm]
1
0
-1
-1
-2
-3
-2
-4
-3
-5
-4
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-100
-50
0
50
100
150
Span 1
Span 2
Span 3
Span 4
Span 5
200
100
Rebar [mm]
0
-100
-200
-300
-400
-500
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 10
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
1
1
0
Stress [N/mm]
Stress [N/mm]
-1
-2
-1
-2
-3
-3
-4
-4
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-100
-50
0
50
100
150
Span 1
Span 2
Span 3
Span 4
Span 5
200
100
Rebar [mm]
0
-100
-200
-300
-400
-500
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 11
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
2
0
1
Stress [N/mm]
Stress [N/mm]
-1
0
-1
-2
-3
-2
-4
-3
-5
Span 1
Span 2
Span 3
Span 4
Span 5
Span 1
Span 2
Span 3
Span 4
Span 5
Moment [kNm]
-100
-50
0
50
100
150
200
250
Span 1
Span 2
Span 3
Span 4
Span 5
80
70
Rebar [mm]
60
50
40
30
20
10
0
Span 1
Span 2
Span 3
Span 4
Span 5
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 12
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
-1
Stress [N/mm]
Stress [N/mm]
-0
-1
-2
-3
-2
-3
-4
-5
-4
-6
Span 1
Span 2
Span 3
Span 1
Span 2
Span 3
Moment [kNm]
-100
-50
0
50
100
150
200
Span 1
Span 2
Span 3
300
Rebar [mm]
250
200
150
100
50
0
Span 1
Span 2
Span 3
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 13
Stress Diagrams
Stress Diagrams
Allowable Stresses
Bottom
Allowable Stresses
0
1
-1
Stress [N/mm]
Stress [N/mm]
-1
-2
-3
-2
-3
-4
-5
-4
-6
Span 1
Span 2
Span 3
Span 1
Span 2
Span 3
Moment [kNm]
-100
-50
0
50
100
150
200
Span 1
Span 2
Span 3
300
Rebar [mm]
250
200
150
100
50
0
Span 1
Span 2
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 14
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
Allowable Stresses
1
-0.5
0
Stress [N/mm]
Stress [N/mm]
-1.0
-1.5
-2.0
-2.5
-1
-2
-3
-4
-3.0
-5
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8
Span 1 Span 2
Span 3
Span 4
Span 5
Span 6
Span 7 Span 8
-400
-300
Moment [kNm]
-200
-100
0
100
200
300
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8
0
-250
Rebar [mm]
-500
-750
-1000
-1250
-1500
-1750
-2000
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8
Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
SUPPORT LINE 15
Stress Diagrams
Stress Diagrams
0.0
Allowable Stresses
Bottom
Allowable Stresses
1
-0.5
-0
Stress [N/mm]
Stress [N/mm]
-1.0
-1.5
-2.0
-1
-2
-3
-2.5
-4
-3.0
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8
Span 1 Span 2
Span 3
Span 4
Span 5
Span 6
Span 7 Span 8
Moment [kNm]
-200
-100
0
100
200
300
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8
0
-250
Rebar [mm]
-500
-750
-1000
-1250
-1500
-1750
-2000
Span 1Span 2
Span 3
Span 4
Span 5
Span 6
Span 7Span 8