You are on page 1of 36

Hanoi MIPEC Tower

6-22th Floor Post-tensioned Slabs

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

101 LIST OF CONTENTS


(Organized according to the numerical ID of each report)

110 STRUCTURAL COMPONENTS


110.01.02 PLAN GEOMETRY
110.14.02 TENDON PLAN
110.20 MESH
110.50 REBAR
117 MATERIALS
117.20 CONCRETE MATERIAL PROPERTIES
117.40 REINFORCEMENT (NONPRESTRESSED) MATERIAL PROPERTIES
117.60 PRESTRESSING MATERIAL PROPERTIES
120 LOAD CASES PLAN
120.20 DEAD LOAD PLAN
120.30 LIVE LOAD PLAN
142 CODES AND ASSUMPTIONS
142.10 DESIGN CODE SPECIFIED
142.20 MATERIAL AND STRENGTH REDUCTION FACTORS
142.30 COVER TO REINFORCEMENT
142.40 MINIMUM BAR LENGTH
143 DESIGN CRITERIA
143.10 ONE-WAY SLABS
143.20 TWO-WAY SLABS
143.30 BEAMS
151 SUPPORT LINES PLAN
151.10 SUPPORT LINES X-DIRECTION
151.15 SUPPORT LINES Y-DIRECTION
151.20 DESIGN STRIPS X-DIRECTION
151.25 DESIGN STRIPS Y-DIRECTION
180 STRESS CHECK PLAN
180.22 STRESS CHECK IN X-DIRECTION
180.24 STRESS CHECK IN Y-DIRECTION
210 DESIGN SECTION LEGEND
220 DESIGN SECTION CODE CHECK
1500 GRAPHICAL REPOTS

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

146 LOAD CASES AND COMBINATIONS


146.20 LOAD CASES
Dead load
Live load
Selfweight
Prestressing
Hyperstatic
Lateral_1
146.40 LOAD COMBINATIONS
Name: Service(Total Load)
Evaluation: SERVICE TOTAL LOAD
Combination detail: 1.00 x Selfweight +
Prestressing
Name: Service(Sustained Load)
Evaluation: SERVICE SUSTAINED LOAD
Combination detail: 1.00 x Selfweight +
Prestressing
Name: Strength(Dead Load Only)
Evaluation: STRENGTH
Combination detail: 1.40 x Selfweight +
Name: Strength(Dead and Live)
Evaluation: STRENGTH
Combination detail: 1.20 x Selfweight +
Hyperstatic
Name: Initial
Evaluation: INITIAL
Combination detail: 1.00 x Selfweight +
Name: Immediate(Live load)
Evaluation: SERVICE TOTAL LOAD
Combination detail: 1.00 x Live load
Name: Long-term(Sustained load)
Evaluation: CRACKED DEFLECTION
Combination detail: 1.00 x Selfweight +
Prestressing

1.00 x Dead load + 1.00 x Live load + 1.00 x

1.00 x Dead load + 0.30 x Live load + 1.00 x

1.40 x Dead load + 1.00 x Hyperstatic

1.20 x Dead load + 1.60 x Live load + 1.00 x

1.00 x Dead load + 1.15 x Prestressing

1.00 x Dead load + 0.30 x Live load + 1.00 x

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

117 MATERIALS
117.20 CONCRETE MATERIAL PROPERTIES
ID

Label

f'c

Unit Weight

Type

Ec

1
2

M350
M400

N/mm2
22.000
25.000

kg/m3
2400.00
2400.00

Normal
Normal

N/mm2
23574
32500

Creep
coefficient

f'c = strength at 28 days


Ec = modulus of elasticity at 28 days

117.40 REINFORCEMENT (NONPRESTRESSED) MATERIAL


PROPERTIES
ID

Label

SD490

fy
N/mm2
490.000

fvy
N/mm2
490.000

Es
N/mm2
200000

fy = yield stress of longitudinal reinforcement


fvy = yield stress of one-way shear reinforcement
Es = modulus of elasticity

117.60 PRESTRESSING MATERIAL PROPERTIES


ID

Label

Gr270

fpu
N/mm2
1860.000

fpy
N/mm2
1700.000

Eps
N/mm2
200000

fpu = ultimate stress


fpy = yield stress
Eps = modulus of elasticity

142 CODES AND ASSUMPTIONS


142.10 DESIGN CODE SPECIFIED: ACI 2005/IBC 2005
142.20 MATERIAL AND STRENGTH REDUCTION FACTORS
Two-way Slabs
ACI 2005/IBC 2005 strength reduction factors used:
For bending
= 0.90
For shear two-way
= 0.75
One-way Slabs
ACI 2005/IBC 2005 strength reduction factors used:
For bending
= 0.90
For shear one-way
= 0.75
Beams
email: Support@Adaptsoft.com website: http://www.Adaptsoft.com
1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

2.00
2.00

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
ACI 2005/IBC 2005 strength reduction factors used:
For bending
= 0.90
For shear one-way
= 0.75
142.30 COVER TO REINFORCEMENT
Two-way Slabs
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom
One-way Slabs
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom
Beams
Prestressing Tendons (CGS)
At top
At bottom
Nonprestressing reinforcement (cover)
At top
At bottom

= 40 mm
= 40 mm
= 15 mm
= 15 mm

= 40 mm
= 40 mm
= 15 mm
= 15 mm

= 40 mm
= 40 mm
= 35 mm
= 35 mm

142.40 MINIMUM BAR LENGTH


Two-way systems
Cut off length of minimum steel over support (length/span)
Cut off length of minimum steel in span (length/span)
= 0.33
Extension of rebar beyond where required for strength:
Top bars
Bottom bars
One-way slabs
Cut off length of minimum steel over support (length/span)
Cut off length of minimum steel in span (length/span)
= 0.33
Extension of rebar beyond where required for strength:
Top bars
Bottom bars
Beams
Cut off length of minimum steel over support (length/span)
Cut off length of minimum steel in span (length/span)
= 0.33
Extension of rebar beyond where required for strength:
Top bars
Bottom bars

= 0.17

= 300 mm
= 300 mm

= 0.17

= 300 mm
= 300 mm

= 0.17

= 300 mm
= 300 mm

143 DESIGN CRITERIA


email: Support@Adaptsoft.com website: http://www.Adaptsoft.com
1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
2

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

143.10 ONE-WAY SLABS


Sustain load stresses
Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.50
= 0.50

Initial load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.25
= 0.25

Total load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.50
= 0.50

= 0.45

= 0.60

= 0.60

143.20 TWO-WAY SLABS


Sustain load stresses
Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.50
= 0.50

Initial load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.25
= 0.25

Total load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.50
= 0.50

= 0.45

= 0.60

= 0.60

143.30 BEAMS
Sustain load stresses
Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c

= 0.50
= 0.50

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
3

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0
Extreme fiber

= 0.45

Initial load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.25
= 0.25

Total load stresses


Tension stress as multiple of (f'c)^1/2
At top fibers
At bottom fibers
Compression stress as multiple of f'c
Extreme fiber

= 0.50
= 0.50

= 0.60

= 0.60

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
4

400

400

S1000

S1000

400x900

S1000

S1000

S1000

S1000

S1000

300

300

500x600

S1000

400

S1000

300
400

400

S1000

400

400

S1000

300

300

300

400

500x600
S1000

200

400

300 300 300

300

400

S1000

400

300

400x900

S1000

1000x600

400

300

1000x600

S1000

S1000
500x600

300 300 300 300 300 300 300 300 300

S1000

S1000

300 300 300 300 300 300 300 300 300

S1000

1000x600

1000x600

S1000

300
400

S1000

1000x600

1000x600

1000x600

1000x600

S1000
500x600

400

REPORT_Plan Geometry
02/24/10
18:33:51
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

160

45

160

160

40

100

100

85

45

160

40

500 100 S=16

500 100 S=16

45

40

45

45

160

160

45

40

45

S=15100
500

160

100

40

45

160

800

45

45

45

45

S=16100 500

160

160

85

100

160

160

500 100

40

85

500
100

160

100

45

40

100

160

100

800

100

45

160

160

85

45

45

160

40

500 500

40

100 500

160

S=40

40

40

45

160

160

45

40

S=25500 500

S=20100500

40

40

40
S=16100 500

160

160

45

45

40

160

160

160

S=16100 500

500 500

45

160

45

S=16100 500
45

45

S=25

S=40100 500

500 500
S=15100
500

160

40

160

40

160

45

500 100

160

40

160

40

160

45

500
100
500 500

500 100

S=15

S=25

S=20

500 500

500100

500 500 S=25

500 100

500 500 S=15

REPORT_Tendon Plan
02/24/10
18:33:55
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Support Line Plan Y-Direction


02/25/10
08:24:18

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Fz=3.00e+1

Fz=3.00e+1

Fz=3.00e+1

Fz=3.00e+1

Fz=2.50

Fz=2.50

Fz=2.50

Fz=1.70

Fz=3.50

Fz=3.00e+1

Fz=3.00e+1

Fz=3.00e+1

Fz=3.00e+1

Fz=2.50

REPORT_Dead Load Plan


02/24/10
18:34:00
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Fz=3.00
Fz=3.50

REPORT_Live Load Plan


02/24/10
18:34:05
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Support Line 14

Support Line 1

Support Line 9

Support Line 10

Support Line 8

Support Line 15

REPORT_Support Lines X-direction


02/24/10
18:34:08
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Support Line 13

Support Line 7

Support Line 6

Support Line 5

Support Line 11

Support Line 12

Calc. by NMT
06-22F.adm

Support Line 4

VNCC

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs
02/24/10
18:34:13

Support Line 3

Support Line 2

REPORT_Support Lines Y-direction

Support Line 14

Support Line 1

Support Line 9

Support Line 10

Support Line 8

Support Line 15

REPORT_Design Strips X-direction


02/24/10
18:34:16
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Support Line 13

Support Line 7

Support Line 6

Support Line 5

Support Line 11

Support Line 12

Calc. by NMT
06-22F.adm

Support Line 4

VNCC

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs
02/24/10
18:34:21

Support Line 3

Support Line 2

REPORT_Design Strips Y-direction

Support Line 14

Support Line 1

Support Line 9

Support Line 10

Support Line 8

Support Line 15

REPORT_Stress Check in X-direction


02/24/10
18:34:24
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Support Line 13

Support Line 7

Support Line 6

Support Line 5

Support Line 11

Support Line 12

Calc. by NMT
06-22F.adm

Support Line 4

VNCC

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs
02/24/10
18:34:29

Support Line 3

Support Line 2

REPORT_Stress Check in Y-direction

REPORT_Mesh
02/24/10
18:34:33
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

3-10mmx4000mm(B)

3-10mmx4000mm(B)

3-10mmx4000mm(B)

3-10mmx4000mm(B)

REPORT_Rebar
02/24/10
18:34:38
06-22F.adm

Hanoi MIPEC Tower


6-22th Floor Post-tensioned Slabs

VNCC
Calc. by NMT

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

DESIGN LEGEND
This legend is provided as an aid for the interpretation of the results that follow.

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 1
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
1
0

Stress [N/mm]

Stress [N/mm]

-1

-2

-1

-2

-3
-3
-4
-4
Span 1

Span 2

Span 3

Span 1

(a) Max tension 1.7 N/mm2, Allowable 2.3 N/mm2


Max compression -3.7 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

(b) Max tension 1.2 N/mm2, Allowable 2.3 N/mm2


Max compression -4.2 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
Span 1

Span 2

Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

1.00
0.75

Rebar [mm]

0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1

Span 2

Span 3

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
1

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 2
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

-0.5

Allowable Stresses

-1.0
Stress [N/mm]

Stress [N/mm]

-1
-1.5
-2.0
-2.5

-2

-3

-3.0
-4
-3.5
Span 1

Span 2

Span 3

Span 4

Span 5

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -3.5 N/mm2, Allowable 9.9 N/mm2

Span 1

Span 2

Span 3

Span 4

Span 5

(b) Max tension 0.8 N/mm2, Allowable 2.3 N/mm2


Max compression -4.4 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
250
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

400

300

Rebar [mm]

200

100

-100

-200
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
2

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 3
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

0.0

Allowable Stresses

-0.5

-0.5

-1.0
-1.0
Stress [N/mm]

Stress [N/mm]

-1.5
-1.5
-2.0
-2.5

-2.0
-2.5
-3.0
-3.5

-3.0

-4.0
-3.5
-4.5
Span 1

Span 2

Span 3

Span 4

Span 5

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -3.3 N/mm2, Allowable 9.9 N/mm2

Span 1

Span 2

Span 3

Span 4

Span 5

(b) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -4.1 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-300

Moment [kNm]

-200

-100

100

200

300
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

1.00
0.75

Rebar [mm]

0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
3

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 4
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

0
-1

Stress [N/mm]

Stress [N/mm]

Allowable Stresses

-2
-3

-1
-2
-3
-4

-4
-5
-5

-6
Span 1

Span 2

Span 1

(a) Max tension 1.4 N/mm2, Allowable 2.3 N/mm2


Max compression -5.1 N/mm2, Allowable 9.9 N/mm2

Span 2

(b) Max tension 1.6 N/mm2, Allowable 2.3 N/mm2


Max compression -5.9 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
Span 1

Span 2

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

300

Rebar [mm]

250

200

150

100

50

0
Span 1

Span 2

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
4

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 5
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Allowable Stresses

Bottom

-0

-1
Stress [N/mm]

Stress [N/mm]

Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

-1

-2

Allowable Stresses

-2
-3
-4

-3
-5
-4

-6
Span 1

Span 2

Span 1

(a) Max tension 1.6 N/mm2, Allowable 2.3 N/mm2


Max compression -4.2 N/mm2, Allowable 9.9 N/mm2

Span 2

(b) Max tension 0.8 N/mm2, Allowable 2.3 N/mm2


Max compression -6.0 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
Span 1

Span 2

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

300

Rebar [mm]

250

200

150

100

50

0
Span 1

Span 2

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
5

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 6
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

0.0

Allowable Stresses

-0.5

-0.5

-1.0

Stress [N/mm]

Stress [N/mm]

-1.0
-1.5
-2.0

-1.5
-2.0
-2.5
-3.0

-2.5

-3.5
-3.0
-4.0
-3.5
Span 1

Span 2

Span 3

Span 4

Span 5

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -3.2 N/mm2, Allowable 9.9 N/mm2

Span 1

Span 2

Span 3

Span 4

Span 5

(b) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -4.0 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-300

Moment [kNm]

-200

-100

100

200

300
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

1.00
0.75

Rebar [mm]

0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1

Span 2

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
6

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 7
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

-0.5
0

Stress [N/mm]

Stress [N/mm]

-1.0
-1.5
-2.0
-2.5

-1

-2

-3
-3.0
-4

-3.5

Span 1

Span 2

Span 3

Span 4

Span 5

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -3.5 N/mm2, Allowable 9.9 N/mm2

Span 1

Span 2

Span 3

Span 4

Span 5

(b) Max tension 0.9 N/mm2, Allowable 2.3 N/mm2


Max compression -4.3 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
250
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

300

Rebar [mm]

200

100

-100

-200

Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
7

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 8
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
2
0
1
Stress [N/mm]

Stress [N/mm]

-1
0

-1

-2

-3

-2
-4
-3
-5
-4
Span 1

Span 2

Span 3

Span 1

(a) Max tension 2.4 N/mm2, Allowable 2.3 N/mm2


Max compression -3.7 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

(b) Max tension 1.1 N/mm2, Allowable 2.3 N/mm2


Max compression -5.0 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
Span 1

Span 2

Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

1.00
0.75

Rebar [mm]

0.50
0.25
-0.00
-0.25
-0.50
-0.75
-1.00
Span 1

Span 2

Span 3

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
8

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 9
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
2
0

Stress [N/mm]

Stress [N/mm]

1
0
-1

-1
-2
-3

-2
-4
-3
-5
-4
Span 1

Span 2

Span 3

Span 4

Span 5

Span 1

(a) Max tension 2.5 N/mm2, Allowable 2.3 N/mm2


Max compression -3.8 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

Span 4

Span 5

(b) Max tension 1.3 N/mm2, Allowable 2.3 N/mm2


Max compression -5.1 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

200
100

Rebar [mm]

0
-100
-200
-300
-400
-500
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
9

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 10
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
1
0

Stress [N/mm]

Stress [N/mm]

-1

-2

-1

-2

-3
-3
-4
-4
Span 1

Span 2

Span 3

Span 4

Span 5

Span 1

(a) Max tension 1.7 N/mm2, Allowable 2.3 N/mm2


Max compression -3.6 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

Span 4

Span 5

(b) Max tension 1.1 N/mm2, Allowable 2.3 N/mm2


Max compression -4.3 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

200
100

Rebar [mm]

0
-100
-200
-300
-400
-500
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
10

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 11
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

2
0
1

Stress [N/mm]

Stress [N/mm]

-1
0

-1

-2

-3

-2
-4
-3
-5
Span 1

Span 2

Span 3

Span 4

Span 5

(a) Max tension 2.1 N/mm2, Allowable 2.3 N/mm2


Max compression -3.5 N/mm2, Allowable 9.9 N/mm2

Span 1

Span 2

Span 3

Span 4

Span 5

(b) Max tension 0.8 N/mm2, Allowable 2.3 N/mm2


Max compression -4.6 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
250
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

80
70

Rebar [mm]

60
50
40
30
20
10
0
Span 1

Span 2

Span 3

Span 4

Span 5

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
11

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 12
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

-1
Stress [N/mm]

Stress [N/mm]

-0

-1

-2

-3

-2
-3
-4
-5

-4

-6
Span 1

Span 2

Span 3

Span 1

(a) Max tension 1.8 N/mm2, Allowable 2.3 N/mm2


Max compression -4.1 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

(b) Max tension 0.7 N/mm2, Allowable 2.3 N/mm2


Max compression -5.8 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
Span 1

Span 2

Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

300

Rebar [mm]

250

200

150

100

50

0
Span 1

Span 2

Span 3

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
12

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 13
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

0
1
-1

Stress [N/mm]

Stress [N/mm]

-1

-2

-3

-2

-3

-4

-5

-4

-6
Span 1

Span 2

Span 3

Span 1

(a) Max tension 1.6 N/mm2, Allowable 2.3 N/mm2


Max compression -3.9 N/mm2, Allowable 9.9 N/mm2

Span 2

Span 3

(b) Max tension 0.5 N/mm2, Allowable 2.3 N/mm2


Max compression -5.7 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-250
-200
-150

Moment [kNm]

-100
-50
0
50
100
150
200
Span 1

Span 2

Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

300

Rebar [mm]

250

200

150

100

50

0
Span 1

Span 2

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
13

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 14
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
-0.5
0

Stress [N/mm]

Stress [N/mm]

-1.0

-1.5

-2.0

-2.5

-1

-2

-3

-4

-3.0

-5
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -2.9 N/mm2, Allowable 9.9 N/mm2

Span 1 Span 2

Span 3

Span 4

Span 5

Span 6

Span 7 Span 8

(b) Max tension 1.2 N/mm2, Allowable 2.3 N/mm2


Max compression -4.8 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side

-400
-300

Moment [kNm]

-200
-100
0
100
200
300
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

0
-250

Rebar [mm]

-500
-750
-1000
-1250
-1500
-1750
-2000
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
14

Project Name: Hanoi MIPEC Tower Specific Data: 6-22th Floor Post-tensioned Slabs
Date of execution: February 24, 2010
File Name: 06-22F.adm FLOOR-PRO Ex 3.20.0

SUPPORT LINE 15
Stress Diagrams

Stress Diagrams

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive
Top

0.0

Project: Hanoi MIPEC Tower / Load Case: Service(Sustained Load)


1.00 x Selfweight + 1.00 x Dead load + 0.30 x Live load + 1.00 x Prestressing
Tensile Stress Positive

Allowable Stresses

Bottom

Allowable Stresses

1
-0.5
-0

Stress [N/mm]

Stress [N/mm]

-1.0

-1.5

-2.0

-1

-2

-3
-2.5
-4
-3.0
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

(a) Max tension 0.0 N/mm2, Allowable 2.3 N/mm2


Max compression -2.9 N/mm2, Allowable 9.9 N/mm2

Span 1 Span 2

Span 3

Span 4

Span 5

Span 6

Span 7 Span 8

(b) Max tension 1.2 N/mm2, Allowable 2.3 N/mm2


Max compression -4.4 N/mm2, Allowable 9.9 N/mm2

DESIGN STRIP SERVICE COMBINATION STRESSES


(Tension stress positive)
Moment Diagrams
Project: Hanoi MIPEC Tower / Load Case: Strength(Dead Load Only)
1.40 x Selfweight + 1.40 x Dead load + 1.00 x Hyperstatic
Moment Drawn on Tension Side
-400
-300

Moment [kNm]

-200
-100
0
100
200
300
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

DESIGN STRIP "DESIGN MOMENT (Mu)"


(Moment is drawn on the tension side)
Rebar Diagrams
Project: Hanoi MIPEC Tower / Load Case: Envelope

Rebar Required Top

Rebar Required Bottom

Rebar Provided Top

Rebar Provided Bottom

0
-250

Rebar [mm]

-500
-750
-1000
-1250
-1500
-1750
-2000
Span 1Span 2

Span 3

Span 4

Span 5

Span 6

Span 7Span 8

DESIGN STRIP REINFORCEMENT


REQUIRED AND PROVIDED

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 306-2401
15