1-1-1
1-1-2
1-1-3
11
11
12
12
2-1-1
2-1-2(RADIANT SECTIONS)
2-1-3(CONVECTION SECTIONS)
2-1-4(TUBES)
2-1-5(HEADERS AND
FITTINGS)
2-1-6
(CROSSOVERSMANIFOLDS AND
TERMINALS)
2-1-7(TUBE SUPPORTS)
2-1-8(HEADER BOXES)
2-1-9(REFRACTORIES AND
INSULATION)
2-1-10 (BURNERS)
2-1-11 (STACKDUCT AND
DAMPER)
21
21
22
23
23
24
24-5
25
27
27
27
28
2-2-1(SOOTBLOWERS) 210
2-2-2(CENTRIFUGAL FANS)
211
2-2-3(AIR PREHEATERS)
211
2-2-4
212
2-2-5
213
2-2-6(FLUE GAS SAMPLING)
213
2-2-7(THERMOWELLS) 213
2-2-8(SNUFFING OR PURGING 213
STEAM)
2-2-9(VENTS AND DRAINS) 214
2-2-10 (TUBE-SKIN
214
THERMOCOUPLES)
2-2-11
214
3-1-1
3-1-2
3-1-3
3-1-4
3-1-5
3-1-6
31
31
31
32
32
33
34
3-1-7(BRICK CONSTRUCTION)
3-1-8(CASTABLE
CONSTRUCTION)
3-1-9(BLOCK INSULATION)
34
36
(SELLER RESPONSIBILITY)
37
(SELLER DOCUMENTATION)
3-4-1(PROPOSAL
DOCUMENTATION)
3-4-2(DETAILED DOCUMENTATION)
37
39
39
34
35
35-6
37
38
41
4-1-1
41
4-1-2(COILS) 41
4-1-3(STEELS) 41
4-1-4(RERACTORY) 42
(INSTALLATION)
42
(CLEANING) 43
(PAINTING) 43
5-1-1
5-1-2
5-1-3(CAST TUBE SUPPORTS)
5-1-4
5-1-5
5-1-6
51
51
51
52
52
52
52
6-1-1
6-1-2
61
61
61
7-1-1
7-1-2
7-1-3
71
71
71-2
72
7-2-1
7-2-2
7-2-3
7-2-4
7-2-5
7-2-6
7-2-7
7-2-8
7-2-9
7-2-10
7-2-11
7-2-12
7-2-13
7-2-14
73
73
74
74
75
75
76
76
76
76
76
77
77
77-9
710
711-26
(A)
(B)
(C)
(D)
(E)
A1-7
B1-21
C1-53
D1
E1
1-1-1
Comply with all applicable federal, state
and local codes including:
AISC American Institute for Steel
Construction Manual of Steel
Construction
AMCA Air Moving and Conditioning
Association Publication 201
ANSI American National Standards Institute
B16.5 Steel pipe flanges, flanged
Valves and Fittings
B31.3 Chemical Plant and Petroleum
Refinery Piping Power Piping
ASCE American Society of Civil Engineering
7.88
Building Code Requirements for
Minimum Design Loads in
Building and other Structures
ASME American Society of Mechanical
Engineers
Boiler and Pressure Vessel Code
Section I Power Boilers
Section II Material Specifications
Section IX Welding and Brazing
Qualifications
B1,20.1
Pipe Threads, General
Purpose
ASTM American Society of Testing Materials
AWS
American Welding Society
....
KNOW-HOW KNOWHOW
2-1-1
(1) API RP 532
NORMAL16 50
(2)
20
15
25
20
(2)
a. 1.5
b. 2.0
a.0.5
b.1
(3)
(4)
(5)
(6)
760
(7)
(9)
124kw/M3
(5) 2M
(6) 2
(7) 2
SHIELD TUBE
KW/M2
BTU/H-FT
31.54
10,000
34.69
11,000
47.31
15,000
52.04
16,500
(9)
100mm
300mm
(10)
100mm
(11)
600mm X 600mm
(12)
450mm X 450mm
(13)
450mm X 600mm
(14)
(2)
(3)
(4)
13mm
(5) 25mm
25mm
(6)
STIFFENERS
100MM
(7) 6
100MM
(8) COBELS
0.5 13mm
(9) 55
(10) 0.9
(11)
(12)
4 1/2
3
2000kg/M3
(13) 600mm X
600mm
2-l-4 TUBES
(1)
1.1 25psi 50psi
(2)
15
(3) FL API RP 530
(M)
6
9
12
15
18
FL
1.0
1.1
1.21
1.33
1.46
(3)
a.
b.
c.PLUG HEADER
(4) TERMINAL
(5)
28
(6)
(7)
Y 180
(8) 16mm
2-l-6 CROSSOVERMANIFOLES
TERMINALS
(1)
a.ANSI B31.3
b.ANSI B31.1
(2)
(3)
(4)
10
(5)
(6)
(7)
Tube
Od
Fx
Fy
in
(mm)
lb
(Kgf)
lb
(Kgf)
lb
(Kgf)
2.375
3.500
4.500
5.563
6.625
8.625
10.75
12.75
(60.3)
(88.9)
(114.3)
(141.3)
(168.3)
(219.0)
(273.0)
(323.8)
100
150
200
225
250
300
350
400
(45.4)
(68.1)
(90.8)
(102.2)
(113.5)
(136.2)
(158.9)
(181.6)
200
300
400
450
500
600
650
700
(90.8)
(136.2)
(181.6)
(204.3)
(227.0)
(272.4)
(295.1)
(317.8)
200
300
400
450
500
600
650
700
(90.8)
(136.2)
(181.6)
(204.3)
(227.0)
(272.4)
(295.1)
(317.8)
Tube
Od
in
(mm)
lb-ft
2.375
3.500
4.500
5.563
6.625
8.625
10.75
12.75
(60.3)
(88.9)
(114.3)
(141.3)
(168.3)
(219.0)
(273.0)
(323.8)
350
450
600
660
730
860
930
1000
Mx
(KgfM)
(48.3)
(62.1)
(82.8)
(91.1)
(100.8)
(118.7)
(128.4)
(138.0)
Fz
My
lb-ft
250
350
450
500
550
650
700
750
(KgfM)
(34.5)
(48.3)
(62.1)
(69.0)
(75.9)
(89.7)
(96.6)
(103.5)
Mz
lb-ft
(Kgf-M)
250
350
450
500
550
650
700
750
(34.5)
(48.3)
(62.1)
(69.0)
(75.9)
(89.7)
(96.6)
(103.5)
2-1-7
(1)
35 6M
(2) 4.5M
9M
4.5M
(3)
55
(4)
110 982
(5)
(6)
a.
(a-1) 1/3 ULTIMATE TENSILE
STRENGTH
(a-2) 2/3 YIELD STRENGTH0.2
OFFSET
(a-3) 10,000 1CREEP
50
(a-4) 10,000 RUPTURE
50
b.
(b-1) 1/3
(b-2) 2/3 0.2 OFFSET
(b-3) 10,000 1CREEP
100
(b-4) 10,000 RUPTURE
100
(7) 0.8
(8)
(8)
a. AISC
b. 0.3
c.
(10)
(11)
(12) 5
(13)
220
(14)
(15)
a.
b.
2-1-8
(1)
75MM
(2) 1.8M
(3)
(4)
1.8M
Tadpole
200MM
2-1-9
(1) BREECHING
66
107
(2)
167
982
(3)
(4) 63MM
(5)
2-1-10
(1)
(2)
(3)
4.4MW
100
(4)
(5)
(6)
1650
(7)
(8)
VACUUM OR
ATMOSPHERIC REDUCED CRUDES
(9) NAPHTHA
(10)
40
(11)
125
5
67
120
115
(12) 0.6MW
(13)
(14) 8 OSHA
2-1-11
DAMPERS
(1) 12M
(2)
2-1-12
(1) AISC---
(2)
(3)
55
(4)
(5)
(6)
(7) 6mm
6.0mm 6mm
(8)
(9)
(10)
(11)
50mm
(12)
2-1-13
(1)
a.
b.---
c.---
d.
e.
f. EPA
(2) 3M
3M
(2)
a.---0.9M
b.---1.2M
c.---0.8M
(4) 6mm 25mm X 5mm
(5) 6M
2-2-1 SOOTBLOWERS
(1)
(2)
a. 982
b. 100ppm 649
(3)
(4)
a. --
0.9M 3
b. --
1.2M 4
c.
(5) OD OD
230mm
155mm
(6)
a.4550KgHr
b.1030 Kpa gauge
(7)
()
426
TP443
705
982
(8)
(9)
(10)
(11)
(12)
a.
b.
c.
d.
e.
f.
(13)
(14)
(3)
(4)
(5)
4.6M
(6)
(7) 74
(8)
a. 115 55
b. 132
(9)
a. 115 14
b. 132
(10)
(2)
(3)
(4)
(5)
(6)
a. Ljungstrom
b. 2
c.
d.
e.
(7)
2-2-4
(1)
a.
9 2
b. 0.6
9 2
c.
9 2
d.
e.
(2) 1 1/2 Class 300 NPT
TP304 SCH80
2-2-5
(1)
a. 0.6 2
b.
c. 2
d. 2 9
e. 2
9
f.
g.
h.
i.
(2) (5-4)(2)
2-2-6 FLUE GAS SAMPLING
(1)
a. 2
2
9M
b.
c.
CA-201
(2) 3 150 TP304 SCH80
40MM 200MM
2-2-7 THERMowELLS
(1)
(2) 1 1/2
32Kg/hr
(2)
32Kg/hr
(3)
(4)
(5) (5-4)(2)
2-2-9 VENTS AND DRAINS
(1) 1
1/2Class 3000NPT
(2)
4 NPT
(3)
(4)
(5) 1Class 6,000
2-2-10
TUBE-SKIN THERMOCOUPLES
(1) 60
TP3l0
2-2-11
(1)
(2)
2.1
(3) 3
(4)
0.8
0.9
3-1-1
(1) FINS
STUDS
a.
1.3mm
25mm
197 /m
2.5mm
19mm
118 /m
13mm
25mm
13mm
25mm
b.
(2)
()
454
510
538
593
11-13Cr
593
649
18Cr-8Ni
816
816
5Cr-1/2Mo
3-1-2
(1)
API RP 530 DESIGN LIFE
100,000
(2) EROSION
ALLOWANCES
a.2.25Cr-1Mo 2.5mm
b. 1.3mm
(3)
3-1-3
(1)
(2)
(3)
(5) ASTM
Carbon steel
C-1/2 Mo
1-1/7 Cr-1/2 Mo
2-1/4 Cr-1 Mo
3 Cr-1 Mo
5 Cr-1/2 Mo
7 Cr-1/2 Mo
9 Cr-1 Mo
18 Cr-8 Ni (304)
(304H)
18 Cr-10 Ni-Ti (321)
(321H)
18 Cr-10 Ni Cb (347)
(347H)
16 Cr-12 Ni-2 Mo
(316)
(316H)
Alloy 800
(Min Grain #5)
25 Cr-20 Ni
A105,A181 Class
60 or 70
A182 GR F1
A182 GR F11
A182 GR F22
A182 GR F21
A182 GR F5
A182 GR F7
A182 GR F9
A182 F304
A182 F304H
A182 F321
A182 F321H
A182 F347
A182 F347H
A182 F316
A182 F316H
B407
Alloy
800H
A812 F310
A234 GR WPB
A216 GR WCB
A234 GR WP1
A234 GR WP11
A234 GR WP22
A217 GR WC1
A217 GR WC6
A217 GR WC9
A234 GR WP5
A234 GR WP7
A234 GR WP9
A403 WP304
A403 WP304H
A403 WP321
A403 WP304H
A403 WP347
A403 WP347H
A403 WP316
A403 WP316H
B407 Alloy 800H
A217 GR C5
A403 WP310
A608 GR HK40
A217 GR C12
A351 GR CF8
A351 GR CF81
A351 GR CF8C
A351 GR CF8C
A351 GR CF8 M
3-1-4
(1) CROSSOVERS
b. 417
c. 75mm
125mm
CASTABLE REFRACTORY
TP 304
980
d. TP 304
13mm
e.
(5) ASTM
()
427
Carbon Steel
A216 Grade WCB
A283 Gr C
621
5 Cr 1/2 Mo
A217 Grade C5
A387 Gr 5
A319 Class III Type C
649
Alloy Cast
816
Iron
A351 Grade CF8
A240, TP
982
18 Cr 8 Ni
A447 Type II
304
1093 25 Cr 12 Ni A297 Grade HK40
A240, TP
25 Cr 20 Ni
309S
A240, TP
310S
(6) 649
100PPM 50 Cr50Ni
50mm
2082Kg/M3
3-1-6
(1) ASTM A36
5mm 50mm
11 BWG 50mm X
50mm
3-1-7 BRICK CONSTRUCTION
(1) INSULATING FIREBRICKS
FIRECLAY BRICKS ASTM C155
C64 ASTM
C64
(2)
SHELIES
TIEMEMBERS Ni-Cr
260
10
(3)
Ni-Cr
(4)
7.3M
8
51
3-1-8 CASTABLE CONSTRUCTION
(1) INSULATING CASTABLE
REFRACTORIES ASTM C401 Class
N,O,P Q
(2) 1 1.5
LIME 15
(3) Lumnite--Haydite--Vermiculite124
982
(4) 75mm
(5) 230mm
(6) Y
(7) V 5mm
90
(8) 70
19mm
(9)
mm
300
200
230
155
(10)
(816
)
Stainless
Steel
TP304
927
Stainless
Steel
1010
TP309
1149
Stainless
Steel
TP310
Inconel 601
(11)
STUD
3-1-10
CERAMIC FIBER
(1) NEEDLED FIBER TYPE
4552 4653
(2)
(3) 25mm
128Kg/M3 1260
(4) STACKEDEDGE-GRAINED
1260
(5)
75mm 50mm
(6)
in ( mm
)
12 ( 300
)
24 ( 600
)
36 ( 900
WALLS
in
( mm )
6x12
9x12
10x12
) 10.5x12
48 (1200
)
ARCHES
In
( mm )
(155 x
300)x
(230
6x12
(155 x 230)
9x9
(230 x 230)
300)x
(250
300)x
(265
10x9
(250 x 230)
300)
(7)
(816
)
Stainless
Steel
TP304
927
Stainless
Steel
1010
TP309
1149
Stainless
Steel
over 1149
TP310
Inconel 601
Ceramic
TP304 NO.2
(8)
(9) 100PPM
(10)
(1)
a.
b.
c.
d.ASME I /BFW
(2)
SELLER RESPONSIBILITY
(1)
(2)
(3)
(4)
(5)
SELLER DOCUMENTATION
3-4-1 PROPOSAL DOCUMENTATION
(1)
a.
b.
c.
d.
e.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(3)
a.
b.
c.
d.
f.
g.
h.Explosion DOORS
i.
j.
(4)
a.
b.
c.
d.
(5)
(6)
a.
b.
Ladle Analysis
c.
d.
e.
f.
g.
(1)
(2)
(3)
(4)
305mm
(5)
(6)
(7)
13mm 4mm 4
(8)
(9)
(10)
(11) 18
(12)
(13)
(14)
12
18
(2)
(3)
4-1-l
(1)
(2)
4-1-2 COILS
(1) ANSI B31.3
(2) ASME
Div8 Section I
(3) BACKING RING
(4)
(5)
(6)
(7)
(8) 9 Cr1 Mo
(9)
(10) STUDS
(11)
4-1-3 STEELS
(1) ASIC---
(7) 6mm
(8)
(9) 19mm
(10) 13mm
1.4m2 13mm
(11)
(12)
25 Cr--12 Ni
4-1-4 REFRACTORY
(1)
1032
(2)
(3)
90
(4)
(5)
(6)
INSTALLATION
(1)
(2)
50mm
Rod
TurnbuckleCrevice
Creat
(3)
3mm
1,800kg
(4) 1,800kg
1.5
(5)
5
(6)
a.
b.
c.
d.
CLEANING
(1)
(2)
(3)
(4)
(5)
(6)
PAINTING
(1)
(2)
(3) 0.1mm
5-1-1
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9) 7
(10)
(11)
(12)
15
60mm 2.5M
(13)
5-1-2
(1)
ANSI
B31.3
(2)
a. TIG 10
b. -- TIG 10
c.-- GIRTH
100
d.GIRTH 10
e.
f. 100
(3)
ASME
Siction I
(4)
(5)
ANSI B31.3 ASTM E446
3
5-1-3 CAST TUBE SUPPORTS
(1)
ASTM
E446 3
5-1-4
(1) AWS D1.1
5-1-5
(1)
6mm
13mm 3mm
50
5-1-6
(1)
ANSI B31.3 Section 337.4.1
(2)
ASME PG--99 Section
I
(3)
(4)
16 15
(5)
30ppm
(6)
60psi 15
15
(7)
(8)
0.5KG
a. 600mm
b. 900mm
(9)
(10) 12
API RP 531M RP532
6-1-1
(1)
6-1-2
(1)
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
ABC
7-1-1
(1)
(2)
(3)
(5) 1
75
(6) 0.05KG/CM2G
5
(7) 10
(8)
(9) ANSI
7-1-2
(1)
(2)
110
(3) 7.1.3
(4) 15KG/CM2G16KG/CM2G
(5) a. 290 320
b.350
(6)
a. 2
b. 5
c.CO2 13
(7) 1
(8) C-CLASS
2
(9) 2
(10) a.020ON-OFF
b.20100
(11)
15mBAR
(12) 25ML.G
(13)
(14) 20KG/CM2G
(15)
a.
b.
c.
d. 1 N2
e. (a)500
(b)600
f. 6
1
(16)
(17)
(18)
(19)
a. 10
b.
(20) 1 N2
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29) 110
(30) C02 13
(31)
7.1.3
Characteristics
Units
TOTAL
K2120
15
Density
Kg/L
0.870
1.004
0.87
1.066
0.859
40
Viscosity
mm2/s
(cSt)
50
30
21
29.6
185
177
193
124
210
Fire Point
205
194
135
Auto Ignition
Point
385
615
Pour Point
-32
-26.1
-7
-9
()
5~10
Distillation
90~95
340
395
339
353
374
446
257
Conradson
Residue
wt.
NIL
NIL
0.03
Limiting Temp.
in Mass
300~310
316
Limiting Temp.
of Oil Film
340
330
(1) 339
353 95
MOSANTO THERM66
(2) -20330
(3) VCM
300 280
(4)
(5) 7.2.14
(6)
7.2.1
(1)
a.
b.
(2) 316L
(3) OD48.3mmt2.6mm
(4)
a.
b.200
c.
170190
200
(5)
10
(6)
(7)
(8)
(9)
(10)
(11) 1 DEW POINT
(12)
(13)
(14)
(15)
7.2.2
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
7.2.3
(1) 100
(2)
(3) 100
(4) RPM
(5)
(6) 85dBA
(8)
(9)
(10)
(11)
7.2.4
(1) AMCA
(2)
(3)
(4) 74
(5)
a. 115 55
b. 132
(6) 7.2.3 (6)(7)
7.2.5
(1) NOX
(2) C-CLASS
(3) 9750KCAL/KG
(4) NOX 250PPM FUEL
(5)
(6)
a. 020
b. 20100
(7)
(8) NOX
(9) 100
(10)
(11)
(12)
(13)
(14) 0.37
(15) O2 6 NOX
(16)
(17)
(18)
(19)
(20)
7.2.6
(1)
(2)
(3)
(4)
(5) 350
7.2.7
(1)
(2)
(3)
(4)
7.2.8
(1)
(2) 1.5
(3) 1000
(4) 1000
1.3
7.2.9
(1)
(2) 320
7.2.10
1000
(1)
(2)
7.2.11
(1)
(2)
(3)
(4)
(5)
(6)
(7)
7.2.12
(1)
(2)
(3)
(4)
O2COCO2SO2NOX
6
RS 232 300
3.5
(5)
7.2.13
(1)
(2)
(3)
a.
b.
c.
d.
e.200500
f.10 4
20mA
g.
h. 4
20mA
(4)
(5)
(6)
(7) NOX
a. AB
b.F.O AB
c. AB
d. AB
e.F.O
f.AB
g.
(8)
NEMA 1
NEMA 4X
(9)
(10)
(11)
(12) 4
(13)
a.
b.
c.
d.
e.
(14)
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
(15)
(16)
(17)
a.
b.
c.
d.
e.
f. P.I.D
(18)
a.
b.
c.
d.
e.
f.
g.
h.
7-2-14
P7-11-P7-26
Specification
Yes
1. SITE CONDITION
1).DEGREE OF LONGITUTDE
:E
2).DEGREE OF LATITUDE
:N
3).PLANT LOCATION
2. OPERATING CONDITION
1).CLIMATE CONDITION
a.MEAN MAXIMUM CONDITION FOR SUMMERRH
b.MEAN MINIMUM CONDITION FOR WINTERRH
c.ELEVATION ABOVE SEA LEVELM
2).POWER SUPPLY
a.FOR MOTOR OVER 200HPPHHZ
b.FOR MOTOR UP TO 200HPPHHZ
c.FOR INSTRUMENTSACHZPH
3).STEAM SUPPLYKG/cm2G
4).INSTRUMENT AIR SUPPLYNOR.KG/cm2GMAX.KG/cm2G
5).SERVICE CONDITION
HEAVY DUTY CONTINUOUS OPERATING 24HRS/DAY WITHOUT
INTERRUPTION, EXCEPT FOR REGULAR MAINTENANCE
6).INSTALLING LOCATIONOUTDOORS
3. DESIGN CONDITIONS AND REQUIREMENTS
1).ALL THE HEAT EXCHANGER SHALL BE DESIGNED BY THE VENDOR
FOR
MAX. REQUIRED DUTY WITH SUITABLE FOULING FACTOR.
2).THE DRAINAGE, VENTING CONNECTIONS SHALL BE CONSIDERED IN
EACH EQUIPMENT AND PIPING, ALL THE CONNECTION SHALL BE
EQUIPPED WITH DOUBLE SHUT-OFF VALVES.
3).ALL THE EQUIPMENTS AND STRUCTURE STEEL SHALL BE DESIGNED
FOR FIELD BOLT ASSEMBLY TYPE. EACH MODULE ARE SHOP
PREFABRICATED TO THE MAX EXTENT PERMITTED BY TRANSPORT
LIMITATIONS. PREASSEMBLY THE WHOLE UNIT BEFORE SHIPPING
IS REQUIRED TO BE SURE ALL THE MODULES CAN BE FITTED
PROPERLY.
4).THE EXTERNAL SURFACE OF STEEL PARTS SHALL BE SANDBLASTED
No
1 OF 13
Explanation if No
BASED
ON
PITCH
0.05
KG/cm2G
AND
TEMPERATURE
VERSUS
HEAT
ABSORBED
CURVE
FOR
EACH
HOT
OIL
HEATER,
AIR-
PREHEATER
(BASED ON PITCH 5) ARE PROVIDED BY VENDOR.
7).THE SURFACE TEMPERATURE OF EQUIPMENT AFTER INSULATION
SHALL NOT BE MORE THAN 10 ABOVE AMBIENT TEMPERATURE.
Specification
Yes
TRANSFER
MEDIUM .(REFER
TO
PARAGRAPH
7.1.3)
4).OPERATING PRESSURE15KG/cm2G16KG/cm2G (AT HEATER
INLET)
5).OPERATING TEMPERATURENOR. 290 (INLET), 320 (OUTLET)
MAX. 350 AT HEATER OUTLET
6).THERMAL EFFICIENCY OF THE HEATER(OFFERED BY VENDOR)
(BASED ON RADIATION LOSS2AMBIENT TEMPERATURE5
CO2 VOLUME DRY13)
7).CALCULATION FORMULA OF THERMAL EFFICIENCY SPECIFIED AS
SHOWN ON THE ATACHMENT (1)
8).HEATING MEDIUMC-CLASS FUEL HEAVY OIL SPECIFIED AS SHOW
ON THE ATTACHMENT (2)
9).ACCURACY OF OUTLET TEMPERATURE CONTROL2
10).RANGE OF ADJUSTMENT 020 ON-OFF CONTROL
20100 CONTINUOUS
11).DRAFT
LOSS
BETWEEN
COMBUSTION
CHAMBER
AND
FLUE
GAS
OUTLET
LESS THAN 15mBAR.
12).HYDRAULIC PRESSURE DROP OF COILLESS THAN 25 M L.G
13).MATERIAL OF COIL TUBES SEAMLESS STEEL TUBES (BOILER
TUBES)
No
2 OF 13
Explanation if No
OPENING
ON
THE
BOTTOM
SIDE
OF
HOT
OIL
HEATER
FOR INNER CASINGNO LESS THAN 500
FOR OUTTER CASINGNO LESS THAN 600
Specification
4.
f.SIX
Yes
REMOVFABLE
SECTION
COVER
PLATES
FOR
COIL
CLEANING
EACH COVER PLATE WITH TWO NOZZLES 1 WITH CAPONE IS
FOR CLEANING THE SPACE BETWEEN INNER AND OUTER COIL,
THE OTHER IS FOR CLEANING THE SPACE BETWEEN OUTER
COIL
AND SHELL.
16).EQUIPPED WITH UPPER CONICAL HEAD COILS ON THE TOP SIDE
OF COMBUSTION CHAMBER
17).EQUIPPED WITH LOWER CONICAL HEAD COILS ON THE BOTTOM
SIDE OF COMBUSTION CHAMBER
18).DESIGNED CAPACITY(KCAL/HR)(OFFERED BY VENDOR)
19).INSULATION REQUIREMENT
a.THE SURFACE TEMPERATURE OF HOT OIL HEATER AFTER
INSULATION SHALL NOT BE MORE THAN 10 ABOVE AMBIENT
TEMPERATURE
b.THE OUTLINE OF REFRACTORY STRUCTURE ON THE TOP SIDE
OF
HOT OIL
HEATER IS
FOR VENDORS
REFERENCE ONLY
AS
SHOWN
ON THE ATTACHED DRAWING. (DWG. NO.Q00ZMA21111) FOR
THE PURPOSE OF EASY MAINTENANCE.
20).THE 25A TUBES WITH CONNECTION FLANGE ON THE TOP SIDE OF
HEATER TO CONNECT N2 GAS SUPPLY TO THE FURANCE OF THE
HEATER
SHOULD
BE
TAKEN
INTO
CONSIDERATION
FOR
THE
PURPOSE
OF EXTINGUISHING ABNORMAL FIRE IN THE FURNACE OF HEATER
21).OTHERSSEE THE ATTACHED DRAWING (DWG. NO.Q00ZMA21111)
22).DIAMETER AND HEIGHT OF COIL(mmI/D*mmH)
(OFFERED BY VENDOR)
23).HEATING SURFACEM2 (OFFERED BY VENDOR)
24).MAXIMUM DIAMETER LENGTH OF FLAME(mm*mmL)
(OFFERED BY VENDOR)
No
3 OF 13
Explanation if No
OF
COIL
BY
VENDOR)
29).CODES STANDARDS(OFFERED BY VENDOR)
30).FLUE
GAS
CAPACITY
AT
110
LOAD(NM3/HR)(OFFERED
VENDOR)
31).DESIGNED CO2 VOLUME DRY(K VALUE)MAX. 13
32).SUPPLIED WITH METAL FASTENING FOR INSULATION.
33).
34).
35).
BY
Specification
5
Yes
No
4 OF 13
Explanation if No
EXPANSION TANK.
2).THE PLANT CAN BE OPERATED AS AN OPEN-CIRCUIT
SYSTEM AT A TEMPERATURE OF 320 WITHOUT
REQUIRING THE USE OF AN INERT GAS.
Specification
9
Yes
BACKWARD INCLINED
No
5 OF 13
Explanation if No
Specification
Yes
SURFACE
TEMPERATURE
OF
AIR
PREHEATER
AFTER
INSULATION
SHALL NOT BE MORE THAN 10 ABOVE AMBIENT TEMPERATURE.
6).FLUE GAS INLET TEMPERATURE()(OFFERED BY VENDOR)
7).FLUE GAS OUTLET TEMPERATURE()(OFFERED BY VENDOR)
8).AIR INLET TEMPERATURE()(OFFERED BY VENDOR)
9).AIR OUTLET TEMPERATURE()(OFFERED BY VENDOR)
10).HEATING SURFACE(M2)(OFFERED BY VENDOR)
11).THEORETICAL DEW POINT OF FLUE GAS BASED ON 1 SULFUR
IN THE FUEL(OFFERED BY VENDOR)
12).THE TEMPERATURE() OF COMBUSTION AIR BEFORE MEETING
THE
OUTLET TUBE BUNDLE OF FLUE GAS(OFFERED BY VENDOR)
13).MINIMUM
TEMPERATURE()
AT
TUBE
WALL (OFFERED
VENDOR)
14).EQUIPPED WITH CONNECTION NOZZLE WITH FLANGE FOR SONIC
SOOT BLOWER ACCORDING TO BUYERS DRAWING.
15).SUPPLID WITH METAL FASTENING FOR INSULATION.
13 SPECIFICATION FOR STEAM HEATED AIR PREHEATER
BY
No
6 OF 13
Explanation if No
1).CAPACITY(KW)(OFFERED BY VENDOR)
2).AIR INLET TEMPERATURE() ON DESIGN BASIS
3).AIR OUTLET TEMPERATURE() ON DESIGN BASIS
(OFFERED BY VENDOR)
4).AIR VOLUME(NM3/HR)(OFFERED BY VENDOR)
5).STEAM PRESSURE(KG/cm2G)(OFFERED BY VENDOR)
6).STEAM CONSUMPTION(KG/HR)(OFFERED BY VENDOR)
Specification
Yes
PRESSURE(mBAR)
AT
100
LOAD (OFFERED
BY
VENDOR)
4).NO. OF REVOLUTIONS(RPM)(OFFERED BY VENDOR)
5).POWER CONSUMPTION (KW)(OFFERED BY VENDOR)
6).NOISE LEVEL OF SILENECER(dBA)(OFFERED BY VENDOR)
7).BALANCE QUALITY OF IMPELLERS(IN ACCORDANCE WITH VDI 2060
OR ISO 1940)G(MM/SEC)(OFFERED BY VENDOR)
8).ALLOWABLE MAXIMUM VIBERATION AMPLITUDE(M) ON THE TOP
SIDE OF BEARING HOUSING(OFFERED BY VENDOR)
9).MATERIAL OF IMPELLERS(OFFERED BY VENDOR)
10).MATERIAL OF CASING(OFFERED BY VENDOR)
11).SUPPLIED WITH AIR DAMPERSTS
SPECIFICATIONS FOR BURNERS
13 1).TYPE OF BURNERLOW-NOX BURNER WITH DOWNWARD FIRING
ATOMIZED OIL BURNER INDUSTRIAL QPPARATUS
2).OPERATING FUELC-CLASS FUEL HEAVY OIL
3).HEATING VALUE OF FUEL9750 (KCAL/KG)
4).NOX EMISSION STANDARDBELOW 250PPM
5).FULLY AUTOMATIC OPERATION WITH ELECTRIC IGNITION.
6).TEMPERATURE INDEPENDENT CONTROL (020 ON-OFF,
20100 CONTINUOUS)(OFFERED BY VENDOR)
7).SAFETY DEVICE INTERLOCKED(OFFERED BY VENDOR)
8).LOAD VERSUS FUEL HEAVY OIL CONSUMPTION CURVE FOR EACH
LOW
NOX BURNER SHALL BE PROVIDED BY VENDOR
9).FUEL CONSUMPTIONS AT 100
No
7 OF 13
Explanation if No
VENDOR)
10).FUEL OIL PRESSURE(KG/cm2G) BEFORE BURNER
(OFFERED BY VENDOR)
11).ATOMIZING STEAM/COMPRESSED AIR PRESSURE(KG/cm2G)
(OFFERED BY VENDOR)
Specification
Yes
WITH
INTEGRATED
THERMO-PRINTER.(OFFERED
BY
VENDOR)
3).EQUIPPED WITH 6 CHANEL RECORDER.(OFFERED BY VENDOR)
4).EQUIPPED
WITH
RS232
COMPUTER
INTERFACE
WITH
300
MEASURING
DATA MEMORY, INCLUDING DATA TRANSMISSION SOFTWARE (3.5
FLOPPY DISK).(OFFERED BY VENDOR)
5).EQUIPPED
WITH
AUTOTEST
AND
SELF-GUARDING
OF
ALL
FUNCTIONS
(OFFERED BY VENDOR)
6).
17 SPECIFICATIONS FOR CONTROL PANEL
1).BOTH THE ELECTRICAL AND INSTRUMENT WIRING AND EQUIPMENT
SHALL
BE
INSTALLATION,
SUITABLE
FOR
HEAVY
DUTY
INDUSTRIAL
No
8 OF 13
Explanation if No
Specification
17
Yes
LEVEL
DETECTION
OF
10M3
FUEL
OIL
TANK
(SIGNAL
SHALL
BE 420mA)
g.RUNNING STATUS OF FUEL OIL TRANSFER PUMP (ON-OFF)
h.OPERATION CURRENT OF HOT OIL CIRCULATING PUMP (SIGNAL
SHALL BE 420mA)
4) ALL MAIN CONTROL PANEL SHALL BE INSTALLED IN A CONTROL
CENTER ROOMCONTROL BUTTON IN LOCAL FOR OPERATION SHALL
BE EQUIPPED.
5) LOCAL CONTROL BOX FOR ALL EQUIPMENT SHALL BE GAS-TIGHT
TYPE.
6) ALL THE MOTOR FOR HIGH PRESSURE PUMP AND COMBUSTION AIR
FAN SHALL BE SAFETY EXPLOSION PROOF (eG3) TYPE.
7) THE
FOLLOWING
ACCESSORIES
SHALL
BE
INCLUDED
IN
THE
LOCAL
OPERATING BOX OF LOW NOX BURNER.
a.RUNNING LIGHT FOR AIR FAN A/B.
b.RUNNING LIGHT FOR F.O. PUMP A/B.
c.RUNNING LIGHT FOR CIRCULATING PUMP A/B.
d.RUNNING LIGHT FOR PILOT BURNER A/B.
e.RUNNING LIGHT FOR F.O. BURNER
f.1 BUTTION FOR BURNER START/STOP. A/B.
g.SELECT SWITCH FOR OFF-LOCAL-REMOTE OPERATING.
8) ANY
ABNORMAL
OF
RUNNING
INCLUDING
SAFETY
SHUT
DOWN
CUTOUT
SHALL BE DISPLAYED ON PANEL BOARD AND BUZZER ON THE
MAIN
AND LOCAL PANEL. THE MAIN PANEL SHALL BE NEMA1 AND NEMA
4X
FOR LOCAL.
9) ALL VITAL PRESSURE AND TEMPERATURE GAUGES WHICH ARE TO
BE
No
9 OF 13
Explanation if No
BOARD
SHALL
BE
COMPLETED
WITH
SUPPORTS
AS
REQUIRED
FOR INSTALLATION.
10). TESTING PUSH BUTTON SHALL BE PROVIDED FOR ALL THE
INDICATING LAMP.
11). THE PURCHASER RESERVE THE RIGHT TO DISCUSS AND REVISE
VENDORS INTERLOCK DRAWING AFTER ORDER.
12). PRESSURE GAUGES SHALL BE LIQUID FILLED TYPE, STAINLESS
CASE AND 4 DIAL DIAMETER.
13). THE CONSTRUCTION OF CONTROL PANEL SHALL BE SPECIFIED
AS
FOLLOWS.
a.PLATE STEEL PANEL.
b.DUST TIGHT AND WATER PROOF.
c.COMPLETE WIRING VENTILATION.
d.INSIDE AND OUTSIDE GROUNDED.
e.WITH PRIMER INSTALLED OUTSIDE.
14). AUXILIARY DEVICES INSTALLED IN THE CONTROL PANEL ARE
AS
FOLLOW.
a.1 MAIN SWITCH.
b.SAFETY DEVICES FOR THE FANS.
c.SAFETY DEVICES FOR FUEL OIL PUMP.
Specification
17
Yes
FOLLOWING
a.ALL
ELECTRICAL
CABLE
CONNECTOR
FOR
ELECTRICAL
EQUIPMENT
SHALL BE ENDED WITH NPTTHREAD.
b.ALL CABLE FROM CONTROL PANEL TO BURNER SHALL BE
CONNECTED FROM TERMINAL BLOCK IN CONTOL BOX.
c.THE WIRING FROM LOCAL CONTROL BOX TO BURNER SHALL BE
COMPLETED BY MAKER, THE HEAT RESISTANT CABLE SHALL
BE
USED FOR THIS WIRING.
d.THE
DOWTHERM
TUBES
FOR
INSTRUMENT
SHALL
BE
SURROUNDED
WITH HEAT TRACE.
f.ALL
INSTUMENTS,
ELECTRICAL
DSHALL
BE SUPPLIED BY VENDOR.
EQUIPMENTS
IN
P I
No
10 OF 13
Explanation if No
CONTROL
CENTER
(MCC)
ONE
LINE
CONTROL
CIRCUIT
DIAGRAM.
d.INSTRUMENT LOCATION DRAWING AND LAYOUT DRAWING.
e.CONTROL
CIRCUIT
DIAGRAM
OF
LOCAL
CONTROL
BOX
(PANEL).
f.TERMINAL CONNECTION DIAGRAM.
g.INSTRUMENT LIST AND DATA SHEET.
h.MOTOR LIST AND TECHNICAL DATA.
18. SCOPE OF SUPPLY
LIST OF SCOPES OF SUPPLY WILL BE DESIGNATED IN V B
TWO
PORTIONS AS FOLLOWS
THE ITEMS WHICH ARE DESIGNATED IN V PORTION SHALL BE
SUPPLIED BY VENDOR. THE ITEMS WHICH IN B PORTION SHALL BE
SUPPLIED BY BUYER.
Specification
ITEM
Yes
DESCRIPTION
QUANTITY
PORTION
REQUIRED
OCCU-
STAND-
PIED
BY
_SPARE
PILOT BURNER
_SPARE
FLAME SENSOR
_SPARE
BURNER CONTROL)
10
WITH MOTORS
11
(WEATHERPROFF)
13
INSTRUMENTS CONTROLLERS
14
CONTINUOUS EMISSION
MONITORING SYSTEM
15
TYPE,
OUTPUT
No
11 OF 13
Explanation if No
16 BAR)
16
VALVE
18
(STEAM HEATED)
19
Specification
20
Yes
RETURN LINE)
21
STEAM HEATED
AIR-PREHEATERS
22
BOILER TUBE
48.3mmO/D*2.6mmT
23
AIR-PREHEATER
24
FUEL
OIL
PREHEATER,
PREHEA
STEAM
HEATED
AIR
-TER
( )
PREHEATER
25
PROGRAMMER.
30
TEMPERATURE CONTROL
EQUIPMENT FOR INLET AIR
No
12 OF 13
Explanation if No
HEATER
31
FOUNDATION WORKING
32
33
DAMPER
FOR
COBUSTION
AIR
FAN
36
Specification
Yes
No
13 OF 13
Explanation if No
YEAR
GUARANTEE
ON
ALL
THE
EQUIPMENTS
WHICH
IN
PORTION
(SINCE PRODUCIBLE RUNNING)
NOTE
1.
OUTLINE
DRAWING
MENTIONED
WITH
MAIN
DIMENSION
AND
MATERIALS
SHALL
BE
SUPPLIED
WITH
QUOTATION.
2.
ALL DRAWING AND DATA SHALL BE PRINTED IN ENGLISH AND BE SUBMITTED BY AIR MAIL OR BY DHL,
TNT OR ANY OTHER COURIER SERVICE. ALL DRAWING AND DATA SHEET MUST BE APPROVED BY THE
PURCHASER
BEFORE STARTING FABRICATION.
3.
THE PROCESS FLOW DIAGRAM (PFD) AND PIPING INSTRUMENT DIAGRAM (P ID) TO SHOW PRESSURE,
TEMPERATURE, FLOW RATE, LINE SIZE.....ETC. ALL ITEMS OF EQUIPMENT SHALL BE INDIVIDUALLY
NUMBERED
ON
SCHEMATA
AND
DESCRIBED
IN
SUFFICIENT
DETAIL
AS
TO
MAKER,
SIZE,
TYPE
MATERIAL...
ETC.
4.
5.
PLEASE CHECK EACH ITEM CAREFULLY. EXPLANATION IS REQUIRED IF ANY EXCEPTIONS TO THIS
SPECIFICATION.
6.
EACH SHUT-OFF VALVE ON HOT OIL PIPING SHOULD BE BELLOW SEAL TYPE ON STEM.
7.
8.
CALCULATION FORMULA OF GUARANTED THERMAL EFFICIENCY AND PENALTY TERMS (IN CASE VENDOR FAIL
TO
ACHIEVE THE GUARANTED EFFICIENCY) WILL BE SPECIFIED AS SHOW ON VENDORS QUOTATION.
9.
THE GENERAL FLOW SHEET IS FOR VENDORS REFERENCE ONLY AS THE ATTACHMED DWG. DWG NO.
10. SPARE PARTS AND CONTINUOUS EMISSION MONITORING SYSTEM SHALL BE QUOTED SEPARATELY.
11. ALL THE GASKETS FOR THE FLANGES OF STEAM VALVE AND PIPING SHALL BE METAL SPIRAL WOUND
TYPE.
12. THREE PIECES OF THE ORIGINAL INSPECTION TEST RECORDS/REPORTS AND CALCULATION SHEET OF
HEATING
SURFACE OF HOT OIL HEATER SHALL BE SUPPLIED BY THE MAKER. THOSE DOCUMENTS SHALL BE
APPROVED AND CERTIFIED BY LOCAL GOVERNMENT.
13. FOR ALL STAND-BY AUXILIARY EQUIPMENT
EQUIPPED WITH STAND-BY PIPINGS AND ELECTRIC CIRCUITS. TO BE OPERATED INDEPENDENTLY.
14. THE VENDOR MUST SUBMIT THE SPARE PARTS LIST WHICH SHALL INCLUDE MAKER, SPECIFICATION, UNIT
PRICE, REPLACING CYCLE WITHIN WARRANTY PERIOD AND EXPIRED WARRANTY PERIOD SEPERATELY.
FURTHERMORE, THE VALID DATE OF PRICE AND INFLATION INDEX FOR THE SPARE PARTS SHALL BE
PRINTED INT THE LIST.
15. THE NAMEPLATE SHALL BE MARKED WITH EQUIPMENT NAME OR EQUIPMENT NO. MANUFACTURE DATE AND
MAKER.
16. ALL THE MATERIALS SHALL BE PACKED SEPERATELY AND DELIVERED IN ACCORDANCE WITH ATTACHED
PACKING LIST.
17. PERFORMANCE TEST SHALL BE EXECUTED WITH THE ATTENDANCE OF WITNESS DISPATCHED BY BUYER, AND
COST FOR PERFORMANCE TEST SHALL BE QUOTED SEPERATELY.
Remarks( by the vendor )
Vendor
Sale Representive
Date
Remarks
1.Please quote your prices per the listed specifications and quality standards, fill out this
form, and send it to us along with the quotations.
2. If the specifications and the quality standards of your produts quoted are the same as those
listed in the form, please mark [] in the YES column if not, please mark [] in the NO
column and state detailed specifications to which your company can make in the EXPLANATION
IF NO
ATTACHMENT (1)
SPECIFICATION FOR CALCULATION FORMULA OF GUARANTEED THERAL
EFFICIENCY AND PENALTY TERMS.
1.CALCULATION FORMULA OF THERMAL EFFICIENCY
EFFICIENCY100RF
WHERE
WHERE
TF TA
F
SA CONSTANT
FROM THE STANDARD SIEGERTS
K
TABLE0.607
TFFLUE GAS TEMPERATURE IN DEG,
TAAMBIENT AIR TEMPERATURE IN DEG,
KMEASURED CO2 VALUE IN (NO MORE THAN 13 )
2. PENALTY TERMS
SHALL THE SYSTEM FAIL TO REACH THE GUARANTEED EFFICIENCY UNDER
NORMAL OPERATING CONDITION. THE SELLER IS ENTITLED TO MODIFY
THE SYSTEM TO SERVE ITS PURPOSE WITHIN 3 MONTHS AFTER THE
FIRST TEST. THE MODIFICATION SHALL NO INTERRUPT THE PRODUCTION
LINE. OTHERWISE, 1 (ONE) OF CONTRACT VALUE FOR EACH 0.3
(LESS OR EQUAL) OF EFFICIENCY DEFICIT HAS TO BE PAID TO THE
BUYER AS THE PENALTY.
ATTACHMENT (2)
SPECIFICATIONS FOR C-CLASS FUEL HEAVY OIL.
ITEM
DESCRIPTION
GRAVITY, MIN
VISCOSITY, MAX
UNIT
SPECIFICATION
TEST METHOD
API AT 15.56
12
ASTM. D287
66
ASTM. D93
CST AT
110
ASTM. D445
WT
1.0
ASTM. D1552
D2622
WT
15
ASTM. D524
15
ASTM. D97
VOL.
0.5
ASTM. D95
VOL.
0.5
ASTM. D1796
(D)
85 01 04 006
2.1.2
(1) (1)
(P.2-2)
3.5
2.1.6
(P.2-6)
(3)
(3) CTCI
650mmX1100mm
450mm X
600mm
860mmX1550mm
(1)
(1)
lbkg
lb-ftkg-m
2.1.7
(P.2-6)
2.1.10
(P.2-9)
5.1.6
(P.5-3)
60 PSI
ANSI B31.3
115
(PIPE)
HEATER-TUBE
(E)
85 09 16 86
7.2.14
(1) (1)
(P.7-10)
(2)
(3)
(4)
P7-10
(D)
(1) (1)