Subcontract No.

NONCONFORMANCE REPORT

12172D-0006001
NCR No.

SEG-J05-NCR-

PROJECT

DATE

ID :
Rev:0

13-JUNE-2016

JAZAN REFINREY & TERMINAL PROJECT (EPC-9)

PLANT No.

J05

DISCIPLINE

SUPPLIER OR SUBCONTRACTOR
ISSUED TO

PIPING

SEG

Group B

DETAILS OF NONCONFORMANCE:
During surveillance it was found that , 36 pipe support [05PR-CWS0906-002. PS1] have
hammered. It can cause to damage to pipe. This is a clear violation against Saudi
Aramco Engineering Standard SAES-L-350(para 8.1)
Note: please find the attached photo.
ISSUED BY:

Signature:

Date:

CONSTRUCTION BY QCM:

Signature:

Date:

ROOT CAUSE:

CORRECTIVE ACTION:

PREVENTIVE ACTION:

Signed by Responsible:
Proposal accepted by:

Signature:
Signature:

Date:
Date:

FINAL DISPOSITION
ACTION TAKEN
VERIFIED BY.
QA/QC Mger.

SEG-QA/QC-Q02

APPROVED
Signature: Date:
Signature: Date:

REJECTED

SEG-QA/QC-Q02