You are on page 1of 5

PROJECT:JALALPUR IRRIGATION PROJECT (JIP)

VILLAGE ROAD BRIDGE

BRIDGE DATA
Clear Roadway Width = 14.0 ft.
Overall Bridge Width

= 16.0 ft.

Clear Transverse Span = 7.5 ft.


Effective Bridge Span = 39.0 ft.

Lead Factor (LF) = 1.3 (D + 1.7 L

1.3 D + 2.21 L

LL intensity for two lanes = 100%


IF for wheel loading =

50
L + 125

< 30%

IF for tracked loading 25% for S < 30 ft.


10% for 30 ft. < S < 150 ft.

T (JIP)

PROJECT:JALALPUR IRRIGATION PROJECT (JIP)

VILLAGE ROAD BRIDGE

1) DECK SLAB
i.

Dead Load Moments


9+3
W = 1 1 0.15 = 0.15
12

0.15 K/ft.
6.00 ft.

MD = 1.3 0.15 7.52/10 @ 1.1 K'


ii.

Live Load Moments


For NLC Loading
50
I=
100 = 38% > 30%
6.5 + 125
P = 22.18 k
ML = 2.21 [0.8 (S + 2) P/25]
ML = 2.21 [0.8 (6.5 + 2) 22.18/25] = 13.33 Kft.
ML + I = 1.3 13.33 @ 17.33 Kft.
* For Military Loading (70 Ton)
P = 78.4 KIPS (35 - Ton) per track
ML = 2.21 [0.8 (1.1 S - 0.5)]
ML = 2.21 [0.8 (1.1 6.5 - 0.5) = 11.78 Kft
ML + I = 1.25 13.70 = 14.725 Kft.
* NLC - Loading Governs
MU = MD + ML + I = 1.10 + 17.33 = 18.4' K
For # 6 bars b = 12", d = 7.125"
Concrete cover = 1.5"
min = 0.005, max = 0.027
dgn = 0.0121
As dsn = 1.034 in2/ft.
(T & B)

As (provide) = 1.056 in 2

Use # 6 @ 5" c/c (T & B)

PROJECT:JALALPUR IRRIGATION PROJECT (JIP)

VILLAGE ROAD BRIDGE

dSn = 0.0015 < min

Use min = 0.005

As prov = 0.44 in2


As (dist) =

220
=
S

220
= 0.89% > 67%
6

Use As (dist) = 0.67 1.056 = 0.71 in2


for # 6 @ 7 in

iv.

As (dist) =0.88in 2

______

Use # 6 @ 7" (T & B)


Check for shear
Vc = 2 fc'. b.d.
= 0.85 2 3000 12 7.125
= 7961 lbs
D.L. Shear = 1.3 150 7.5/2 = 732 lbs.

OK

You might also like