GANAGE GROUP OF INDUSTRIES

UNIT :-

REV. NO. :- 01 / 02.05.2004

DWM-01

INTRODUCTION DATE:

INTRODUCTION DATE:

DATE:-

PROCESS PARAMETERS
DATE
SR.NO.

PARAMETER

SPECIFICATION

SR.NO.

PARAMETER

AUTO SHUT HEIGHT CONTROLLER

CUSHION DISPLAY

CLAMPING TIME

4
5

UNCLAMING TIME
STROKE COUNTER

PARALISM RECORD

630 T

500 T ( I )

500 T ( II )

500 T ( III )

300 T

DWM-01
CHECKED BY :
MAINTENANCE ENGR. :

PRODUCTION ENGR. :

FORM NO. MNT / 09 - A / 01

GANAGE GROUP OF INDUSTRIES


UNIT :-

INTRODUCTION DATE:

REV. NO. :- 01 / 02.05.2004

FRL DAILY CHECKLIST

Date :

Date :

Date :

Shift
Machine

I st

II nd

Shift
III rd

Date :

Machine

I st

I st

II nd

Machine

I st

II nd

III rd

1] DRAIN WATER FROM FILTER & LUBRICATOR

FORM NO. MNT / 09 - B / 01

Machine

I st

II nd

Machine

I st

II nd

III rd

III rd

Date :

Shift

INSTRUCTIONS :2] CLOSE INLET & OUTLET OF FRL UNIT


3] ADD OIL IN THE LUBRICATOR

II nd

Shift
III rd

Date :

II nd

I st

Date :

Shift
I st

Machine

Shift
III rd

Date :

Machine

Shift
III rd

Date :

Shift
Machine

II nd

I st

II nd

Shift
III rd

Machine

III rd

GANAGE GROUP OF INDUSTRIES


UNIT :-

INTRODUCTION DATE:

REV. NO. :- 01 / 02.05.2004

LUBRICATION OIL CONSUMPTION


CUMMULATIVE
OIL IN Ltrs.

40
35
OIL IN Ltrs.

30
25
20
15
10
5
0

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

DAY

DATE

M/C

FORM NO. MNT / 09 - C / 00

REASON

ACTION

DATE

M/C

REASON

ACTION

DATE

M/C

REASON

ACTION

DATE

M/C

REASON

ACTION

GANAGE GROUP OF INDUSTRIES


UNIT :-

INTRODUCTION DATE:

REV. NO. :- 01 / 02.05.2004

DAILY TWO HAND CONTROL CHECK LIST


DATE :SR. NO.

SHIFT :MACHINE

TOTAL NO.
OF TWO-HANDS

TWO HANDS TWO-HAND BY-PASSED


IN USE

PROD. ENGR. SIGN.

MACHINE

OF TWO-HANDS

TWO HANDS TWO-HAND BY-PASSED


IN USE

(REASON)

REMARKS

MACHINE

OF TWO-HANDS

PROD. ENGR. SIGN.


FORM NO. MNT / 09 - D / 01

TWO HANDS TWO-HAND BY-PASSED


IN USE

(REASON)

MAINT. ENGR. SIGN.

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

SR. NO.

SR. NO.

REMARKS

MACHINE

TWO HANDS

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

REMARKS

MACHINE

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

PROD. ENGR. SIGN.

MAINT. ENGR. SIGN.

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

SR. NO.

SHIFT :MACHINE

TOTAL NO.

TWO HANDS

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

SR. NO.

REMARKS

MAINT. ENGR. SIGN.

DATE :REMARKS

REMARKS

MAINT. ENGR. SIGN.

PROD. ENGR. SIGN.

SHIFT :TWO HANDS

MACHINE

TWO HANDS

DATE :-

MAINT. ENGR. SIGN.

TOTAL NO.

SR. NO.

SHIFT :TOTAL NO.

PROD. ENGR. SIGN.

SHIFT :TOTAL NO.

DATE :REMARKS

DATE :-

MAINT. ENGR. SIGN.

PROD. ENGR. SIGN.

SHIFT :TOTAL NO.

MACHINE

TWO HANDS

DATE :-

MAINT. ENGR. SIGN.

DATE :-

SR. NO.

SHIFT :TOTAL NO.

PROD. ENGR. SIGN.

SHIFT :TOTAL NO.

PROD. ENGR. SIGN.

SR. NO.

REMARKS

MAINT. ENGR. SIGN.

DATE :SR. NO.

(REASON)

DATE :-

SHIFT :MACHINE

TOTAL NO.

TWO HANDS

TWO-HAND BY-PASSED

OF TWO-HANDS

IN USE

(REASON)

PROD. ENGR. SIGN.

MAINT. ENGR. SIGN.

REMARKS

UNIT :-

INTRODUCTION DATE:

REV. NO. :- 01 / 02.05.2004

DAILY POWER FACTOR

MONTH :

TARGET LINE

POWER FACTOR

1.01

1.00
0.99
0.98
0.97
0.96
0.95
0.94
0.93
0.92
0.91
0.9

10

11

12

13

14

15

DAY
FORM NO. MNT / 09 - E / 01

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

GANAGE GROUP OF INDUSTRIES


UNIT :-

INTRODUCTION DATE:

REV. NO. :- 01 / 02.05.2004

Daily B/D Record


MONTH:Dept. :- M/c Maintenance

M/c : Date

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Shift
I Shift
II Shift
III Shift
CUMMULATIVE
B/D MIN.

Occurance

Date

FORM NO. MNT / 09 - F / 01

Shift

Phenomena ( Reason )

Action

Repair

Time

Search
Time

Total Time

GANAGE GROUP OF INDUSTRIES


UNIT :-

REV. NO. :- 01 / 02.05.2004

INTRODUCTION DATE:

MONTH :-

ABSENTISM RECORD
SR.NO.

EMPLOYEE NAME

TOTAL PRESENT EMPLOYEES

FORM NO. MNT / 09 - H / 01

10

11

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31