Takt Approach
Cycle time = Average of observed
times
Takt Time =
Manpower Needed =
SAM/SMV/SAH Approach
Standard Allowed Minute (SAM) = (Average Observed
time x Performance Rating factor) + Allowances
Manpower Needed =