Indian Oil Corporation Limited

Measurement Sheet

Haldia Refinery
______________________________________________________________________________________________________________________________
Service Entry Sheet No:
Work order No / Date:
Name of the work:
Name of the contractor:
Date of commencement:
Contractual date of compl.:
Extension granted if any:
RA Bill No/ Final Bill:
No and date of last bill:
Period of work:
Measurement entered by:
Measurement checked by:
% Measurement Checked By

Date of Measurement: 31.03.2016


23184705
24428317 / 20.04.2015
Inspection Services / Manpower Supply during 2015 M&I Shutdown at
Haldia Refinery
10105977 Aarvi Encon Pvt. Ltd.
20.09.2015
31.03.2016
2ND RA BILL
22976603
26.11.2015
20.01.2016 to 20.03.2016
DMIP
SIPM

* Engineer Taking Measurement


* Immediate Superior Officer
* Next Superior Officer
* Departmental Head

Page 1 / 2

Measurement Sheet for SES No:


23184705
Contractor No: 10105977
Work Order No:
24428317
______________________________________________________________________________________________________________________________

Service
No
Service Description
W.O.Item Line No
Outline
Unit
______________________________________________________________________________________________________________________________
Charges for carrying out
10
D
Inspection jobs
______________________________________________________________________________________________________________________________

Particular
Formula
Formula Description
Minus-Ind
Coeff
Number
L
B
H
Quantity
Unit
______________________________________________________________________________________________________________________________
CHARGES FOR CARRYING OUT INSPECTION JOBS
85.000
DAY
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ______________________________________________________________________________________________________________________________
Total Quantity
85.000

Signature of Contractor
with seal and date

Signature of Engineer
taking measurement