Perhitungan Bekisting Kolom Lt.

5 :
-

Kolom
Kolom
Kolom
Kolom

KIB
K2B
K3
BA1

=
=
=
=

40x40
40x40
30x30
30x50

Kebutuhan Bekisting Per meter :


-

KIB
K2B
K3
KBA1

=
=
=
=

(0.4
(0.4
(0.3
(0.3

x
x
x
x

4) x 1
4) x 1
4) x 1
2 + 0.5 x 2) x 1

=
=
=
=

1.6
1.6
1.2
1.6

m2
m2
m2
m2

Total Panjang Kolom :


-

Kolom
Kolom
Kolom
Kolom

KIB
K2B
K3
BA1

=
=
=
=

21 m
75 m
18 m
6m

Total kebutuhan Bekisting kolom :


-

KIB
K2B
K3
KBA1

=
=
=
=

1.6
1.6
1.2
1.6

x
x
x
x

21
75
18
6

=
=
=
=

33.6 m2
120 m2
21.6 m2
9.6 m2

= 184.8 m2

Total

Perhitungan Bekisting Dinding Lift Lt.5 :


Keliling Total

= 2.1 x 4 + 1.8 x 2 + 1.9 x 4 = 19.6 m

Panjang Total

=3m

Total Bekisting Dinding Lift = 19.6 x 3 = 58.8 m 2