DAY 1 Intro/Installation
08.30-09.15
Intro
Introduction & Handouts material.
09.15-09.30
Product intro
Specification sheet.
09.30-10.15
Installation procedure
Enterprise install. (show video)
Insert supplies during installation. (show video)
Navigate menu and print menu/test page etc.
Power off procedure.
10.15-1030
Break
10.30-11.00
11.00-12.30
Feeder adjustment
Show the enterprise feeder.
Setup feeder with DL, C5 and C4.
If necessary REV.10 feeder (customers who has this feeder)
12.30-13.00
Lunch
13.00-14.15
14.15-16.15
16.15-17.00
Parts location
Show training power point.
Conveyer
Show the videos and let the attendees do hands-on repair
conveyer belt tension.
conveyer media detection sensor.
conveyer control belt.
conveyer belt.
conveyer motor.
Feeder
Show the Enterprise feeder and explain to attendees about parts of this feeder
Belt system and principle
Feeder control board with eeprom, and sensor.
Feeder belt and motor.
11.00-11.15
Break
11.15-12.15
12.15-12.45
Lunch
12.45-17.00