You are on page 1of 1

General Notes :

1.
2.
3.

4.

All drawing should be read along with the relevant


Architectural Drawing
Grade of RCC items shall be M25 by design confirming to
IS456:2000 unless otherwise specified
a). All plain and RCC work shall strictly confirm to
IS456:2000
b). M20 with 43grade cement machine mixed concrete can
be 1:2:4 nominal mix with water cement ratio 0.55
Tor 40 steel confirming to IS1786:1985
Grade - Fe 415

5.

Clear cover to steel as follows


- For footing 50mm
- For column 30mm
- For beam 20mm

6.

Removal of form works


For footing 50mm
- Beams spanning up to 6m - 14days
- Beams spanning up to over 6m - 21days

7.

Lap length for all bars shall be 50times the D of the bar
unless specified
Spacer bar to be provided in between two layers of
reinforcement of same diameter @ every 1000 C/C

8.

9. Cantilever props should not be released until the roof is


considered
10. All concrete work shall be machine mixed and vibrated
11. Quality and Quantity of construction is under client risk
12. All reinforcement shall be placed and
maintained in the position shown in the
drawing (cross section) by proving
proper cover blocks, spacers & Sup bars
13. All dimensions are in 'mm'
14. SBC assumed as 250 Kn/m2.

ISSUED FOR APPROVAL


Rev.No

Descriptions

Date

Old Wooden Truss


Structure Title :

BP 10mm Tk + 230mm Dia (Bolt C/C 6")


Note:
After Placing of truss 'U' type
hook clip provided on wooden
beam

PLAN & CROSS SECTION


Architect :

AB & BP with Pedestal

305
[1']

M20 Concrete

Project Name & Client :

2448
[8']

114 Dia 3mm Tk Pipe


Anchor Bolt & Base plate
4Nos M16 + 10mm Bp

Pedestal 450mm Long

230
[9"]

16mm Anchor Bolt 300mm Long

Consultant :

TRADITIONAL STRUCTURES

10mm Baseplate

Structural Engineers & Consultants


34,Anna Nagar, Rathinapuri, Cbe-27
Mobile No: +91 9043999939, 9884404477

164
[6"]

6756.7
C/C<> [22'-2"]

M20 Concrete

Email :- traditionalstructures@gmail.com

Anchor Bolt with Baseplate

Project No :

2016/M/016

Designed :

SPN

Drafting

AM

Checked :

SPN

Signature

P/S/C/2016 - M-001
Scale :

1:100

Date :

26/07/2016