Preparations:-(A) Inspect the boiler prior to starting and particularly check the following.
All foreign material have been removed from pressure parts & from inside
the furnace.
Cold fluidization checks are to be made & recorded and it shall be ensure
that the air nozzles in the distributor plates are clean.
The boiler is filled with treated water up to normal through initial filling
pump.
(C ) It is presumed that crushed fuel (0- 6 mm) is stored in crushed fuel bunker
and available for firing.
Put all automatic control equipment on manual control & see that
control equipmentare ready for service.
All Blow down & Drain Valves & air vent valves specified here
Startup vent valves, vent on the SH header & other vent valves on MS line
-Start the ID fan and maintain draft -1mmWC then start PA fan and take PA
Header pr. Max. Then lightup the burners and start FD fan (all FD dampers
should be closed) then load the FD damper . As charcoal catched fire load 1st
compt. Damper and raise w/b
(E) Taking first and second compartments in line .
-As first compt. temp raise above 900 deg. Increase the FD air flow and coal
feeding (about 5 % in first comt.) and open PA damper of second compt. And
then open first comt. FD damper to 100 % and then open second compt. FD
damper (but w/b of both comp
As first compt. temp raise above 900 deg. Increase the FD air flow and coal
feeding (about 5 % in first comt.) and open PA damper of second compt.
And then open first comt. FD damper to 100 % and then open second
compt. FD damper (but w/b of both comp