BHOPAL (M.P.)
NOUVEAU
101,67 SHAIL VILLA KAVIRAMANPATH
,NAGESHWAR COLONY,BORING ROAD,PATNA800001
PROJECT REPORT ON
Construction Site Mamta Hotel ,NH 31 Zero Mile of NH 31&NH
30,Bakhtiyarpur,Bihar (803212).
(TRAINING PERIOD: 8 July 2016 - 22 July2016)
ACKNOWLEDGEMENT
It is indeed a great pleasure and privilege to present this report on training at Nouveau
I am extremely grateful to our training and placement officer for issuing a Training letter,
which made our training possible at Nouveau, Patna.
We would like to express our gratitude to Ar. Mr.Adarash khare and Er Mr. Sahu (Assistant
Engineer) for his valuable suggestions, motivation ,guidance and support through out the
training.His methodology to start from simple and then deepen through made us to bring out
this project report without anxiety.
Thanks to all other Nouveau officials, operators and all other members of Nouveau, yet
uncounted for their help in completing the project and see the light of success.
We are very thankful to friends, colleagues and all other persons who rendered their assistance
directly or indirectly to complete this project work successfully.
.
DATED:-
INDEX
Nouveau,patna
Page 2
July 2016
S.NO
DESCRIPTION
1.
INTRODUCTION
2.
PROJECT OVERVIEW
3.
SITE LOCATION
4.
FORMWORK
5.
PLANNING
6.
7.
CONCRETE
8.
FOUNDATION
9.
CURING OF CONCRETE
10.
WATER PROOFING
11.
PROJECT MONITERING
12.
QUALITY
13.
BIBLOGRAPHY
14.
CONCLUSION
Nouveau,patna
Page 3
1.INTRODUCTION
ABOUT
The nouveau construction pvt. Ltd is the largest construction company in bihar.Now days
company is executing 12:site in bihar at different location.At present it is constructed mamta hotel, ,NH
31 Zero Mile of NH 31&NH 30,Bakhtiyarpur.The approximate duration of project is 2yr 3month
to exercise universal control over public works in India with best of scientific knowledge with authority
& system.
Nouveau is the most famous company of planning, designing, construction and maintenance in
the field of built environment and infrastructure development. Assets in built environment include
Hospitals, Schools, Colleges, Technical Institutes, Police Buildings, Prisons, Courts etc; assets
in infrastructure development include Roads, Bridges, Flyovers, Footpaths, Subways etc. Nouveau
patnai also sustains and preserves these assets through a well developed system of maintenance
which includes amongst others specialized services like rehabilitation works, roads signage and
aesthetic treatments like interiors, monument lighting, landscaping.
Page 4
3. Effective Maintenance
4. Benchmarking the Standards
5. Capacity Building
6. Public Private Partnership
7. Manpower Planning
8. Transparency in Management
Nouveau,patna
Page 5
2. Engineered Construction
1. Standardization of different building elements including their pre-fabrication, mechanization in
construction, use of innovative materials and technologies adopting clean development mechanism
resulting in conservation of energy and natural resources.
3. Effective Maintenance
1. To preserve and maintain buildings and services in good operating condition.
2. To improve the specifications depending upon the development that is taking place in the built
environment.
5.Capacity Building
Nouveau,patna
Page 6
7.Manpower Planning
1. To provide the manpower of NOUVEAU with professional environment,
excellent working
Nouveau,patna
Page 7
2. PROJECT OVERVIEW
NAME of WORK: Construction of Mamta Hotel
NH 31 Zero Mile of NH 31 & NH 30,Bakhtiyarpur, Bihar (803212)
Nouveau,patna
Page 8
3.SITE LOCATION
Mamta Hotal,NH-31,Zero mile of NH-31&NH-30,Bakhtiyarpur,Bihar,
Nouveau,patna
Page 9
4. FORMWORK
Formwork is a mould or die used to support and shape the concrete until it attains sufficient to
carry its own weight. The formwork holds the concrete until it hardens to required shape and size.
SIGNIFICANCE OF FORMWORK
1) Formwork constitutes 30% of the cost and 60% of the time in concrete construction.
2) Quality of concrete finish and soundness of concrete depends very much on the formwork
system
3) Desired shape of concrete is not possible if formwork not done properly.
4) Formwork should be properly designed, fabricated and erected to receive concrete.
5) Accidents happen because of the faulty formwork and scaffolding or staging.
SAFETY IN USING FORMWORK:1)
2)
3)
4)
TYPES OF FORMWORK
1)
2)
3)
4)
Flex system
Quick deck system
Aluform system
Flex table formwork
Nouveau,patna
Page 10
Cur
ing work and refilling of earth around footing. Workers on a construction site
building.
Nouveau,patna
Page 11
Nouveau,patna
Page 12
Nouveau,patna
Page 13
Nouveau,patna
Page 14
5.PLANNING
Nouveau,patna
Page 15
Nouveau,patna
Page 16
Deposit works
Preparation of estimates.
Register of buildings.
Documentation of accounts.
Publicity of tenders
Sale of documents
Earnest money.
Nouveau,patna
Page 17
Payment to contractors
Insurance
Losses or damages.
Budgeting
Site clearance
Demarcation of site
Excavation
Nouveau,patna
Page 18
Concreting
CONSTRUCTION PROCESS AND MATERIAL USED:SITE CLEARANCEA number of conditions determine the kind of building that may be erected on a plot of ground.
These conditions may determine where on the lot it may be located. There are also covenants that
are legally binding regulations. These may, for example, set the minimum size of a house, prohibit
utility buildings, or ban rooftop television antennas.
Zoning laws regulate the setback and other factors that play into the equation of house location on
a lot. Septic tanks also require special consideration.
A Certificate of Occupancy is an important piece of paper. It is the final piece of paper, the signoff, that says the construction of the building is complete and it is ready to be occupied. Any town
that has adopted the BOCA or UBC building codes requires a CO. In most instances, the bank
making the mortgage loan requires a certificate of occupation as well.
CONCRETE :MAIN COMPONENTS:-Water, cement, fine aggregate or sand, coarse aggregate, surkhi, and fly
ash.
Nouveau,patna
Page 19
COARSE AGGREGATE
General: Aggregate most of which is retained on 4.75 mm IS Sieve and contains only as much fine
material as is permitted in IS 383 for various sizes and grading is known as coarse aggregate.
Coarse aggregate shall be specified as stone aggregate, gravel or brick aggregate and it shall be
obtained from approved/ authorized sources.
SIZE AND GRADING
Stone aggregate and gravel: It shall be either graded or single sized as specified. Nominal size and
grading shall be as under:Nominal sizes of graded stone aggregate or gravel shall be 40, 20, 16, or 12.5 mm as specified. For
any one of the nominal sizes, the proportion of other sizes as determined by the method prescribed
in Appendix A of Chapter 4 shall be in accordance with Table 4.1.
FINE AGGREGATE
Aggregate most of which passes through 4.75 mm IS sieve is known as fine aggregate. Fine
aggregate shall consist of natural sand, crushed stone sand, crushed gravel sand stone dust or
marble dust, fly ash and broken brick (Burnt clay). It shall be hard, durable, chemically inert, clean
Nouveau,patna
Page 20
and free from adherent coatings, organic matter etc. and shall not contain any appreciable amount
of clay balls orpellets and harmful impurities e.g. iron pyrites, alkalies, salts, coal, mica, shale or
similar laminated materials in such form or in such quantities as to cause corrosion of metal or
affect adversely the hardening, the strength, the durability or the appearance of mortar, plaster or
concrete. The sum of the percentages of all deleterious material shall not exceed 5%. Fine
aggregate must be checked for organic impurities such as decayed vegetation humps, coal dust etc.
Cement
The cement used shall be any of the following grade and the type selected should be for the
intended use.
o
o
o
o
o
o
o
o
o
o
o
Nouveau,patna
Page 21
Different types of cement shall not be mixed together. In case more than one type of cement is
used in any work, a record shall be kept showing the location and the types of cement used.
CEMENT CONCRETE
Grades of Cement Concrete: The concrete shall be in grade designated as under:
TESTING OF CONCRETE
Regular mandatory tests on the workability of the fresh concrete shall be done to achieve the
specified compressive strength of concrete. These will be of two types
a. Mandatory Lab, Test
b. Mandatory Field Test
Results of Mandatory Field Test will prevail over mandatory Lab. Test.
Nouveau,patna
Page 22
8. FOUNDATION
Though the foundation supports a building, the earth is the ultimate support. The foundation is a
system comprising foundation wall, footing, and soil. The prime purpose of an efficient structural
foundation system is to transmit the building loads directly to the soil without exceeding the
bearing capacity of the soil. A properly Designed and constructed foundation system transfers the
loads uniformly, minimizes settlement, and anchors the structure against racking forces and uplift.
Because soil type and bearing capacity are the crucial factors in the foundation system, the
Nouveau,patna
Page 23
foundation must be designed and built as a system. Too many residential foundations are designed
and built without any concern for the soil.
Types of Foundations
The many types of foundations can be separated into two broad groups: shallow foundations and
deep foundations. Shallow foundations consist of four types: deep basements (8-foot walls), crawl
spaces, slabs-on-grade, and frost-protected shallow foundations. They include spread footings, mat
or raft footings, long footings, and strap footings.
Deep foundations extend considerably deeper into the earth.
They include drilled caissons or piers, groups of piles driven and cast-in-place concrete piles, and
floating foundations.
A number of different construction systems can be used. Casting- place concrete is the most widely
used material for residential foundations, followed by concrete block. Other methods include
precast foundation walls, cast-in-place concrete sandwich panels, and masonry or concrete piers,
all weather wood foundations (AWWF), which are now called permanent wood foundations
(PWF), or preserved.
9. CURING CONCRETE
Curing is the process of preventing loss of moisture from the concrete. The following methods
shall be employed for effecting curing.
Moist Curing
by ponding or by covering with a layer of sacking, canvas, Hessian or similar materials and kept
constantly wet for at least 7 days from the date of placing concrete in case of ordinary Portland
Nouveau,patna
Page 24
cement and at least 10 days where mineral admixtures or blended cements are used. The period of
curing shall not be less than 10 days for concrete exposed to dry and hot weather conditions. In the
case of concrete where mineral admixtures or blended cements are used, it is recommended that
above minimum periods may be extended to 14 days.
Membrane Curing
: Approved curing compounds may be used in lieu of moist curing with the
permission of the Engineer-in-Charge. Such compound shall be applied to all exposed surfaces of
the concrete as soon as possible after the concrete has set. Impermeable membrane such as
polythene sheet covering the concrete surface may also be used to provide effective barrier against
the evaporation.
Nouveau,patna
Page 25
10
Waterproofing
Any system or material (s), which helps in preventing ingress of water into structures can be
broadly termed as waterproofing
IMPORTANCE OF WATERPROOFING
Rotting of timber structures and finishes such as floor joints, beams, floors, studs, skirting,
architraves and frames.
Corrosion of metals such as steel reinforcement in concrete, steel beams, lintels, metal door
frames etc.
Electrical hazards causing the possible short circuit of lighting and power points.
Rotting carpet.
Nouveau,patna
Page 26
Vegetation growth
Separation gaps between partition wall and beams and the columns.
Causes of leakages
Porous structures
Bituminous Treatment/Systems
This system was developed during the initial stages of flat roof construction with lime
mortar & burnt clay brick aggregate
Nouveau,patna
Page 27
This system involved laying of lightweight mortar on the roof and spreading it to give
gentle slopes for draining away the rainwater immediately. The mortar consisted of
lightweight brick pieces as aggregates and ground brick with lime as binding matrix
Procedure
All existing treatment, coatings on roof slab top is to be removed and surface cleaned by hard
wire brush and washed with water.
The surface should be free from any oil, grease, dust etc. Remedial measured by provided to all
structural cracks.
All non-structural cracks more than 0.5 mm wide and construction joints if any, should be cut
in V shape, cleaned with wire brush and washed, the cracks are then filled by polymer
modified cement or mortar using acrylic polymer, with addition cement slurry mix is spread
upon cleaned SSD roof surface. Over this 15 mm thick cement, sand mortar, 1:4 admixed, with
water proofer is laid.
On the above green mortar, a layer of brick bats, soaked over night in water, is laid, having an
average thickness of about 110 mm, about 70 mm near rain water pipe and 150 mm at ridge.
Limitations :
This system has following limitations
Nouveau,patna
Page 28
Nouveau,patna
Page 29
Nouveau,patna
Page 30
12. QUALITY
The technical audit of works done by NOUVEAU used to be done in-house right from its
inception. The functions of Quality Assurance and Technical Audit of works were shifted to CVC
in the year 1964. On the recommendation of Ranganathan Committee, the Quality Assurance
functions were again shifted to NOUVEAU in the year 1979.
The implementation of Quality Assurance in the field will require close co-operation among the
three agencies, namely (a) field engineers (b) the construction agency, and (c) the Quality
Assurance team at Circle level for strict compliance of Quality Assurance Procedure forming part
of agreement.
Quality Control System Of The Department
Multi level Quality checks have been created in NOUVEAU as detailed below:
Field level
The direct responsibility for ensuring proper quality of work as per approved specifications for
achieving the intended performance and structural, functional and aesthetical parameters, and the
desired life of the building/installation/structure rests with the construction team of Executive
Engineer, Assistant Engineer and Junior Engineer.
Quality Control team at Circle Level
To keep a watch on the effectiveness/adequacy of Quality Assurance measures at site, a Quality
Assurance team with SE of the circle as its head and comprising of one AE.
Nouveau,patna
Page 31
The functions of the Quality Assurance team at Circle level are to check the compliance of Quality
Assurance system by the field units, to locate the lapse/deficiency in the implementation of the
Quality Assurance Plan, and to guide the field engineers in quality related aspects of the work.
Core Wing at Directorate Level
This Core Wing carries out the following main functions to ensure systematic and comprehensive
Assurance of quality in the works:
Nouveau,patna
Page 32
13. BIBLIOGRAPHY
1. AS PER NOUVEAU SPECIFICATION
Nouveau,patna
Page 33
for 2 Weeks.
regarding almost every aspect of site. I was given exposure in almost all the departments at the
site, but I had liked to highlight the areas of safety, quality management, material management and
execution.
I hope this experience will surely help me in my future and also in shaping my career.
Nouveau,patna
Page 34