You are on page 1of 1

BUILDING QUOTATION

(MASONRY & PLASTER WITHOUT DEDUCTION)

XYZ (CONTRACTOR)
Cell No. **********
Sl.No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.

Particulars
Foundation bed Concrete
Foundation Rubble Filling Ground level
U-C-R-S Masonary
C-R-S Masonary
CC Bed Concrete
Brick Masonry 13
Brick Masonry 9
Brick Masonry 4
Masonry Bed Concrete 3fit up
Halu Brick Masonry
Plaster Sponge Double Coat
Plaster Sponge Single coat
Plaster Thapy Finishing
Narrow Plaster
Beam & Column & Racks Chajja & Roof Chajja
Fine Rinding Plaster
Gulta Patti Double
Gulta Patti Single
Ceiling Groove Wall Grove
Pardi Plain
Almari Self Pardi
Window Box Pardi
Flooring Bed concrete
Rough Flooring Shahabad Stone
Basement Cut Painting
Basement Plus Painting
Con-Sense Patti, Rain Patti
Grill Fixing Change
Cement Pillar Readymade Fixing Charge
WC One Fixing Change
Inspection Chamber
SWG Pipe
PVE Pipe
CC Pipe
Glaze Tiles One Sq ft 8x12
Glaze Tiles One Sq. ft 16x16
Red-Oxide
Galli Trap
Nail Trap
Barshan Catta Masonry (Plaster With finishing)
RCC Pardi Plaster
Draf Pardi
Mangalore Tiles
Cornic Patti 3 Step
Granite Stone
Galta POP Same
Column Bending & Beam
Plaster Impremo
Arch 3x5 Width Each One

Square Feet
P.Sft.
100.Cft.
100 Cft.
100 Cft.
1 Sft.
100 Cft.
100 Sft.
100 Sft.
1 Rft.
100 Sft.
100 Sft.
100 Sft.
100 Sft.
100 Sft.
1 Sft.
100 Sft.
1 Rft.
1 Rft.
1 Rft.
1 Sft.
1 Sft.
1 Sft.
100 Sft.
100 Sft.
100 Sft.
100 Sft.
1 Rft.
1 Sft.
1 Sft.
Each
1
1 Rft.
1 Rft.
1 Rft.
1 Sft.
1 Sft.
1 Sft.
1
One
Each
1 Sft.
1 Sft.
1 Sft.
1 Rft.
1 Sft.
1 Rft.
1 Rft.
1 Sft.
1

Rate
10.00
500.00
600.00
800.00
10.00
650.00
700.00
750.00
10.00
650.00
700.00
500.00
450.00
700.00
12.00
700.00
25.00
20.00
15.00
40.00
45.00
45.00
700.00
600.00
700.00
500.00
15.00
20.00
50.00
500.00
500.00
20.00
20.00
20.00
20.00
20.00
15.00
100.00
100.00
3500.00
25.00
55.00
30.00
60.00
35.00
100.00
200.00
20.00
5000.00

Note:
1.
First Floor 30% Extra.
2.
Second Floor 50% Extra.
3.
This Rate is valid for one year only from the date of issue. After one year 10 extra.

Signature
Owner / Engineer

XYZ
Address: **********
(Contractor)

You might also like