1.
2.
3.
4.
Reduction in hardness
Increase of tensile strength
Increase of both strength and ductility
None of the above
10
15
5
20
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
6.
b.
c.
d.
7.
c.
d.
9.
8.
12 to 18 inches
6 to 12 inches
12 to 24 inches
6 to 18 inches
11.
1
2
3
All 4
14.
Fatigue cracks.
Creep cracks.
Stress corrosion cracks.
Hydrogen induced cracks.
13.
MDMT+10F
MDMT+30F
MDMT+ 0C
MDMT+ 0C
12.
16.
b.
c.
d.
Oxygen
Water (i.e., Wet H2S)
Sulphur
a and c above
The leak tightness of the relief valves is tested on the test block
at a pressure equal to:
a.
b.
c.
d.
20.
19.
18.
17.
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
22.
d.
24.
Visual inspection
Hydrotesting of valve body
Radiographic testing
Check set-pressure
23.
Year
0
5
10
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
26.
27.
28.
29.
10 years
12.5 years
5 years
None of above
c.
d.
31.
76.9 inches
15.6 inches
68.4 inches
All of the above
32.
As per API 510, the organization who carry out PRV repair,
testing has to be:
a.
b.
c.
d.
33.
20 years, 10 years
14 years, 5years
28 years, 10 years
None of the above
A vessel which was inspected six years ago and had shell
thickness = 0.870. As on today the thickness as reported by
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
35.
38.
11 Years, 5 Years
10 Years, 5 Years
5 Years, 5 Years
None of the above
37.
10 years
12 years
14 years
None of above
36.
10 mpy
12 mpy
14 mpy
none of above
inch
1/8 inch
1/16 inch
3/16 inch
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
40.
magnetizing
equipment,
the
+5%
+10%
+15%
+20%
On stream inspection.
Internal inspection
External inspection as alternative to internal inspection
Any of above is OK
43.
Prod Spacing
Thickness of item under Inspection
a & b above
None of above
For a vertical column, Int. dia. = 48'' and height (T-T) = 80ft,
The vessel MAWP is 60 psi. Minimum vessel part MAWP for
bottom dished head (2:1 Ellip type) shall be:
a.
b.
94.6 psi
82.8 psi
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
45.
46.
95.5 psi
None of above
P Nos.
F Nos.
S Nos.
A Nos.
47.
48.
Plate welds
Tubular products with outer diameter less than 3.5 inch
Large pipes with outer diameter 200 mm and
above
Heavy castings
d.
49.
50.
10 mm
8 mm
7 mm
9 mm
b.
c.
d.
51.
c.
d.
52.
53.
typically
a.
b.
c.
High temperature
due to
Methane gas formation
Wet H2S formation
Temper embrittlement
hydrogen
attack
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD
is
55.
56.
c.
d.
/var/www/apps/conversion/tmp/scratch_7/340832408.doc
12/22/2016 11:40:21 AM / NCD