Expediting Unit
Factory
Client
GAMESA
Sub-Supplier
KORINDO
Locality
TEST
Other_________________
PES Srl
Inspection bodies
Contract (EGPSuppliers)
Supplier
ANNEX A2
Plant/Project:
Towers of
Vientos del
Altiplano
NIL
Contract
57019851
(Suppliers Sub-suppliers)
Sub-Supplier ref.
CIWANDAN
Nation
INDONESIA
FAT
NOTE
Phase of
ITP/QCP
ITP/QCP ref
EGP Technical
Spec.
/ Procedure
Standard Code
Reference
Suppliers drawings
GD 202956
Rev. 3
GD 202955
Rev. 3
GD 202958
Rev. 3
GD 202961
Rev. 3
Attachments
Test specifications/Procedure
Summary Description
Description
of materials
Contractual
Test date
Actual Test
Date
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
3-5 Nov
2015
14 = Top Section
(183192, 183193, 183194, 183195, 183196, 183197, 183198,
183199, 183200, 183201, 183202, 183203, 183204, 183205)
Page of
Mod. TR rev.00
Factory
Other_________________
All statement from above checklist has been provided with report which already include in MDR
for each section
Visual and random thickness check of paint was performed as per specification
Based on applicable specifications, the outcome of the inspection/test activities specified above is deemed
SUCCESSFUL. The issuing of this document does not relieve the Supplier from liabilities relative to any nonconformity detected on materials at a later date.
Supplier:
(Name and Signature)
_____________________
Page of
Sub-supplier - OPTIONAL:
Inspector on behalf of
ENEL
Green Power S.p.A:
(Name and Signature)
(Name and Signature)
___________________
____________________
DATE
Compilation
____/____/____
Mod. TR rev.00
Other_________________
Torquing photo :
Page of
Mod. TR rev.00