Engineering & Construction

Project Management
Expediting Unit

Test performed from 03 Nov to 05 Nov 2015

Inspection Test Report TR Code 318

Factory

Enel GP Progressive Code


____8400068057.PES.774.496253________________________

Enel Green Power S.p.A.

Client

GAMESA

Sub-Supplier

KORINDO

Locality

TEST

Other_________________
PES Srl

Inspection bodies
Contract (EGPSuppliers)

Supplier

ANNEX A2

Plant/Project:
Towers of
Vientos del
Altiplano

NIL

Contract
57019851
(Suppliers Sub-suppliers)
Sub-Supplier ref.

CIWANDAN

Rudi Hartono (+62-254-600882 Ext.303)

Nation

INDONESIA

Test notification no.


INTERMEDIATE

FAT

NOTE
Phase of
ITP/QCP

ITP/QCP ref
EGP Technical
Spec.
/ Procedure
Standard Code
Reference
Suppliers drawings

GD 202956

Rev. 3

GD 202955

Rev. 3

GD 202958

Rev. 3

GD 202961

Rev. 3

Attachments
Test specifications/Procedure

Summary Description
Description
of materials

Contractual
Test date

Actual Test
Date

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

3-5 Nov
2015

Set of tower ( 56 sections ) consisted ;


14 = Bottom Section
(183150, 183151, 183152, 183153, 183154, 183155,
183156, 183157, 183158, 183159,183160, 183161, 183162,
183163

14 = Lower Middle Section


(183164, 183165, 183166, 183167, 183168, 183169, 183170,
183171, 183172, 183173, 183174, 183175, 183176, 183177)

14 = Upper Middle Section


(183178, 183179, 183180, 183181, 183182, 183183, 183184,
183185, 183186, 183187, 183188, 183189, 183190, 183191)

14 = Top Section
(183192, 183193, 183194, 183195, 183196, 183197, 183198,
183199, 183200, 183201, 183202, 183203, 183204, 183205)

Page of

Mod. TR rev.00

Engineering & Construction


Project Management
Expediting Unit
Test performed from 03 Nov to 05 Nov 2015

Inspection Test Report TR Code 318


Enel GP Progressive Code
____8400068057.PES.774.496253________________________
Order
Pos.

Factory

Other_________________

Type of Test Inspection Activity


Visual Inspection Wind Tower
Visual & Random Check Painting
Visual Check Completeness Installation (As per Manufacturing)
Review MDR Documentation Checklist

All statement from above checklist has been provided with report which already include in MDR
for each section

Review report already performed with satisfactory results

Visual inspection of internal assembly already done as per drawing

Visual and random thickness check of paint was performed as per specification

Actual current condition as described in attachment photos

Visual Inspection was performed such as :


1. Installation of ladder and platform is Ok
2. Electrical installation is Ok
3. Tightenning of all bolts are Ok
4. Identification / Name plates were installed
5. All lightings can be turn on
6. Hatch door can be opened-closed
7. Door installation is Ok
8. There is no damage on the ladder and other parts
9. There is no paint damage on inside section
10. There is no paint damage on outside section
11. Cleanliness of inside section is Ok
12. Cleanliness of outside section is Ok

Based on applicable specifications, the outcome of the inspection/test activities specified above is deemed
SUCCESSFUL. The issuing of this document does not relieve the Supplier from liabilities relative to any nonconformity detected on materials at a later date.
Supplier:
(Name and Signature)
_____________________

Page of

Sub-supplier - OPTIONAL:
Inspector on behalf of
ENEL
Green Power S.p.A:
(Name and Signature)
(Name and Signature)
___________________

____________________

DATE
Compilation
____/____/____

Mod. TR rev.00

Engineering & Construction


Project Management
Expediting Unit
Inspection Test Report TR Code 318
Enel GP Progressive Code
____8400068057.PES.774.496253________________________

Test performed from 03 Nov to 05 Nov 2015


Factory

Other_________________

Paint thickness photo :

Torquing photo :

Page of

Mod. TR rev.00

You might also like