Issue 1 | 2014 SG
CapitaGreen
Page 6
Oasia Downtown
Page 14
scope
Marco Romahn
Managing Director
PERI Asia Pte Ltd
Main Contractor
Dragages Singapore Pte Ltd
Main Contractor Steel
Yongnam Engineering and Construction
Dulan Asia Pacific Pte Ltd
Field Service
PERI Asia Pte Ltd
PERI UP offers a combination of flexibility, cost-efficiency and safety due to its smart design. The main components of the
modular scaffolding, such as standards, ledgers and decks, have uniform length dimensions of 25 cm or 50 cm. The wide
range of ledgers with lengths starting from 25 cm ensures maximum adaptability to suit project-specific geometries.
Flexibility
PERI UP is a modular scaffold that
consists of only a few standard components, which allow a variety of shoring
and scaffolding applications on site.
Cost-efficiency
PERI UP saves investment costs due
to its versatility and high erection and
dismantling productivity.
Safety
PERI UP features reinforced wedges
and gravity locks for safe erection and
dismantling.
Facade Scaffold
PERI UP Rosett allows scaffolding operations with
standard components. The Rosett nodes at spacings of 50 cm also provide connection possibilities
in all directions.
Stair towers
PERI UP also provides solutions for temporary
access to working levels at different heights.
Applications extend from stairs with only a few
steps through to stair towers over 90 m high.
Working Platforms
With PERI UP Rosett working platforms, each
level can be completely decked out. Access is
carried out by means of decks with integrated
ladders from the intermediate levels.
Shoring
Reinforcement Scaffold
Stair towers
Work platform
Approval of the
German Institute of
Buildings technology
0
80 8
80 80
80 80
Applications
Stair Tower
Reinforcement Scaffold
Facade Scaffold
Industrial Scaffold
Shoring
Working Platforms
Cradles
Weather Protection Roofs
Birdcage Scaffold
Suspended Scaffold
Contractor
Soon Loong Engineering
and Construction Pte Ltd
Field Service
PERI Asia Pte Ltd
Simple
Standard connecting parts,
same frame
Huge
Used as slab table for
high clearances and in large
movable units
High load-bearing capacity
As shoring tower for heights
over 20 m and loads more
than 60 kN
High
As stair tower up to 100 m high
Contractor
Takenaka Corporation
Field Service
PERI Asia Pte Ltd
Mr. Hata,
Construction Manager:
PERI have provided us with many
customised solutions to cater
for our construction method.
With their professional technical
solutions and prompt on-site
support, we are able to resolve
any problems encountered on the
jobsite. Overall, Im very pleased
with PERI products and services.
4.80
4.80
4.80
Clean and safe construction at high level with PERI safety screen.
Contractor
Kimly Construction
Pte Ltd
Field Service
PERI Asia Pte Ltd
A 16-storey distribution
center is currently being
built at the junction of Benoi
Road and Joo Koon Circle.
It will house the Joo Koon
bus interchange and will be
part of the Joo Koon Integrated Transport Hub. Due to
its fast assembly and dismantling a large amount of the
ST 100 stacking tower has
been chosen. The individual
components can be easily
fitted together without tools,
and heights can be easily
Contractor
Tiong Seng Contractor Pte Ltd
Field Service
PERI Asia Pte Ltd
10
Contractor
Lum Chang Building
Contractors
Field Service
PERI Asia Pte Ltd
00
3
15
0
0
15
75
75
25
00
cm
High Safety.
75
75
cm
High Productivity.
00
0c
15
cm
50
25
50
cm
30
m
0c
cm
High Flexibility.
11
12
Contractor
McConnel Dowell SEA Pte Ltd
Field Service
PERI Asia Pte Ltd
Concourse Level
SFL 94.43
Platform Level
SFL 88.83
Under Platform Level
SFL 86.73
13
The GRIDFLEX elements are hooked in from below and swivelled upwards means the erection
of the formwork is very safe. After this, the PEP
prop can be positioned.
14
Through the use of hydraulics, the crane-independent RCS system allows the wall formwork and
platform to climb together in one operation.
Contractor
Woh Hub (Private)
Limited
Field Service
PERI Asia Pte Ltd
Use on the
first casting
segment.
Anchoring
The RCS anchoring components with the climbing
shoe which only weighs 20 kg makes easy assembly possible. The quality and high loadbearing
capacity of the PERI climbing anchor is guaranteed
in accordance with official German certification.
Formwork mounting
For assembling and aligning the formwork on
the RCS carriage, SRU steel walers as strongbacks
and SLS spindles as adjustable struts are used.
The adjustment unit serves as levelling device.
Carriage RCS
The formwork is securely mounted on the carriage
and can be retracted by 90 cm without the use of
the crane. Due to the roller bearings, the carriage
is easy to operate as well as being jerk-free.
Concreting
of the standard
cycle.
Rail-guided climbing
with the crane or
self-climbing device.
15
The new four-storey ramp up warehouse will add another 350,000 sqft
to Keppels logistics warehouse capacity in Singapore when completed in
early 2015.
The facilities in the Tampines Logistics
Park will increase Keppels Logistic
operating warehouse capacity by 20%
to beyond 2 million sqft. The air logistic
hub will feature automated storage,
tracking and handling systems, as well
as incorporate environmentally-friendly
building features for enhanced efficiency, productivity and sustainability.
16
Contractor
DHC Construction
Pte Ltd
Field Service
PERI Asia Pte Ltd
Contractor
SH Design & Build
Pte Ltd
Field Service
PERI Asia Pte Ltd
17
VARIO GT 24 column formwork with full concreting platform coverage and access ladder providing
safe working areas.
18
in height adjusting.
Advance planning sessions of
PERI design engineers, together with
the contractor, ensure that pre-fabricated column forms and table forms
are re-usable for the next casting.
Contractor
EEI Corporation
Field Service
PERI Asia Pte Ltd
Technical solution
Logistics
Onsite support
Training