Formwork Scaffolding Engineering

Issue 1 | 2014 SG

Successful construction with PERI

Singapore Sports Hub


Page 2

Downtown line 912


Page 10

CapitaGreen
Page 6

Oasia Downtown
Page 14

scope

Dear valued partners and


prospective customers,
PERI is committed to adapt to the requirements
of our customers, worldwide. We have reorganized
ourselves in order to ensure sustainable growth,
especially in emerging markets. As Bernd Kieslich
has taken over responsibility for the Asia Pacific
region, I would like to take this opportunity to introduce myself as his successor in Singapore.
I am very pleased to present to you the 2014
edition of our PERI scope.
Singapore has a vision. To make it one of the most
liveable cities in the world. To sustain a vibrant
economy and to maintain a good living environment in the future. Singapore is growing while land
is rare and precious.
The projected growth and its derived construction
volume comes along with big challenges. The construction market is facing more and more difficulties in terms of safety, quality and time; in short:
in productivity. A growing number of accidents,
caused primarily by the lack of skilled workers and
outdated construction materials and equipment,
give proof of it. BCA and MOM implemented
several instruments to govern against this trend.
At PERI we believe that sustainable business success requires high productivity. Employees have to
be trained, products have to be further developed,
and new innovative products have to be implemented.
Long lasting partnerships expect more than just
the supply of materials. The provision of innovative,
productive formwork and scaffolding solutions,
accompanied by services such as customized engineering, in-time material delivery, extensive on-site
support and individual customer training are part of
the comprehensive package provided by PERI.
This edition of the scope showcases our dedicated
involvement in the various fields of construction.
It displays the wide range of quality products which
you have utilized to ensure a successful project.
Enjoy reading! We look forward to being of
best service to you.

Marco Romahn
Managing Director
PERI Asia Pte Ltd

Exceptional access solution for retr


PERI UP Rosett Flex
Singapore Sports Hub, Singapore
With a fully retractable domeshaped steel roof, the Singapore
Sports Hub is the first state-ofthe-art multi-purpose facility of
its kind in Asia to cater for world
class sports and entertainment
events. The construction, with
dimensions of 80m in height
and 312 m in diameter, lasted
43 months utilising up to 26
cranes.
To guarantee a safe work
environment for the installation
of the steel roof construction,
PERI provided a comprehensive technical system solution,
introducing PERI UP Rosett Flex
as both an access

tower and suspended hanging


scaffold.
Exceptional: The pre-erection
of PERI UP Rosett Flex on the
ground. The integrated lock
mechanism of non-slip perforated surface decks allows fast
and safe assembly, and automatic locking against uplifts.
Foregone were the days of
detailed planning for each truss
type to guarantee the horizontal alignment of each working
platform after being lifted up in
the air and connected to other
trusses.

36 m high stair tower to reach mega truss


hanging scaffold.

actable dome shaped steel roof

Completed by a flexible logistic


concept during installation,
PERI facilitated a flexible, fast
and safe project execution at all
times.

The flexibility and high loadbearing capacity of PERI UP


Rosett Flex, due to the special
node rigidity and the enormous
load ability of the connection,
convinced all contractors on-site.

Erection of Scaffold on ground:


Truss is secured by supports
Fix Hanging ropes at truss

Fix additional ropes for erection


mount steel waler at additional and Hanging ropes
Erect Hanging Scaffold from ground

Main Contractor
Dragages Singapore Pte Ltd
Main Contractor Steel
Yongnam Engineering and Construction
Dulan Asia Pacific Pte Ltd
Field Service
PERI Asia Pte Ltd

Mr. Abhimandran Harendran,


Project Coordinator, Yongnam
Engineering and Construction;
Mr. Bernward Stube,
Director, Dulan Asia Pacific Pte Ltd:
The PERI UP Rosett Flex has
proven to be a safe, flexible and
productive system which supports
and faciliates the installation of the
structural steel roof for the stadium
of the Singapore Sports Hub.
3

PERI UP Rosett Flex


The modular scaffold for several applications

PERI UP offers a combination of flexibility, cost-efficiency and safety due to its smart design. The main components of the
modular scaffolding, such as standards, ledgers and decks, have uniform length dimensions of 25 cm or 50 cm. The wide
range of ledgers with lengths starting from 25 cm ensures maximum adaptability to suit project-specific geometries.
Flexibility
PERI UP is a modular scaffold that
consists of only a few standard components, which allow a variety of shoring
and scaffolding applications on site.

Cost-efficiency
PERI UP saves investment costs due
to its versatility and high erection and
dismantling productivity.

Safety
PERI UP features reinforced wedges
and gravity locks for safe erection and
dismantling.

Facade Scaffold
PERI UP Rosett allows scaffolding operations with
standard components. The Rosett nodes at spacings of 50 cm also provide connection possibilities
in all directions.

Stair towers
PERI UP also provides solutions for temporary
access to working levels at different heights.
Applications extend from stairs with only a few
steps through to stair towers over 90 m high.

Working Platforms
With PERI UP Rosett working platforms, each
level can be completely decked out. Access is
carried out by means of decks with integrated
ladders from the intermediate levels.

PERI UP comes with a grid of 25 cm


and 50 cm in vertical dimension.
These metric dimensions ensure
optimal adaption in all cases.

PERI UP Rosett: same components different applications

Shoring

Reinforcement Scaffold

Stair towers

Work platform

Approval of the
German Institute of
Buildings technology

The PERI UP nodes provide a maximum


of twelve connection possibilities for:
four ledgers
four ledger diagonal braces
four node braces
The high rigidity of the ledger connection
allows only small deformations on the standards.
This results in high standard loads and it means
that braces are not required in many cases the
ledgers provide sufficient reinforcement.

0
80 8

The shape of the rosett prevents


the standards from rolling away
and makes stacking very easy.

80 80

PERI UP Rosett a strong node connection.


High load-bearing capacity through high rigidity

80 80

Applications
Stair Tower
Reinforcement Scaffold
Facade Scaffold
Industrial Scaffold
Shoring
Working Platforms
Cradles
Weather Protection Roofs
Birdcage Scaffold
Suspended Scaffold

Fast Safe Precise


Formwork and engineering for every project
Fusionopolis Phase 2A Tower C, Singapore
Fusionopolis Phase 2A Tower
C will house dry and wet
laboratories and will feature
Singapores Largest R&D
clean room facility.
The project uses VARIO GT
24 as column formwork, and
in combination with CB 240,
as climbing system for core
wall construction.

Mr. Foo Piow Swoon,


Project Manager:
We choose PERI systems
because they are fast
and safe. Using PERI
systems we managed to
achieve a construction
schedule of 18 days cycle
per floor compared to
30 days using conventional
systems.

ST 100 stacking tower and


PD 8 slab table are used
for shoring decks with floor
heights combination of
7,950 mm, and 2,900 mm
for 1,400 mm and 800 mm
thick waffle slabs respectively.

Contractor
Soon Loong Engineering
and Construction Pte Ltd
Field Service
PERI Asia Pte Ltd

PD 8 slab table, shoring and stair tower


The proven shoring system for large loads
PERI PD 8 stands for the
solution with large units
and high clearances. With
the help of flexibly used
system components, the
application as shoring or
stair tower as well as slab
table is very economical.
Modular system for the erec tion of scaffolding structures
as slab tables, shoring towers
or stair towers
W ith just two frame sizes and
two spindles along with large
spindling lengths, covers all
heights from 1.55 m onwards
A s shoring tower up to
21.30 m high and for loads
up to 62 kN
C an be erected as stair tower
up to 100 m high with units
pre-assembled on the ground
Flexibly adapted using few
system components as slab
tablear

A trolley and winch unit facilitates fast moving


of the PD 8 scaffold constructions.

Simple
Standard connecting parts,
same frame
Huge
Used as slab table for
high clearances and in large
movable units
High load-bearing capacity
As shoring tower for heights
over 20 m and loads more
than 60 kN
High
As stair tower up to 100 m high

Contractor
Takenaka Corporation
Field Service
PERI Asia Pte Ltd

Mr. Hata,
Construction Manager:
PERI have provided us with many
customised solutions to cater
for our construction method.
With their professional technical
solutions and prompt on-site
support, we are able to resolve
any problems encountered on the
jobsite. Overall, Im very pleased
with PERI products and services.

A new landmark designed by Toyo Ito is climbing


in Singapores CBD with PERI systems
CapitaGreen, Singapore

PERI RCS protection screen, supported


by precast ledges, provided a safe
enclosure during work for the steel
structure floor slabs. PERI anchors are
sent to the precast yard for advance
installation. Due to limited precast
ledge capacity for the support of
the protection screen, a customised
design of adapters and propping was
supplied by PERI.

VARIO GT 24 girder wall formwork.

Concrete placing booms are also


incorporated onto PERI core wall formwork to allow for automatic climbing
with the PERI self-climbing mechanism
without the need for any slab opening.

4.80

Designed by Toyo Ito, his aim is to


revive the relationship between greenery, buildings, and people.
Due to be completed in late 2014, it
will have a clear floor height of 4.80 m.

PERI ACS/RCS self-climbing system


with concrete placing boom is adopted
for the 24.00 m x 29.00 m large core
wall construction. Exterior wall formwork of up to 11.00 m x 4.80 m is
supported on one ACS platform. Two
platforms can be climbed concurrently
with one hydraulic pump. Covering
100 sqm of exterior wall formwork on
one ACS platform, the two platforms
climb automatically to the next casting
position with one climbing operation.
The whole climbing process takes only
20 minutes.

4.80

A 40-storey office building is currently


being built in the heart of Singapores
financial and business district.

4.80

Clean and safe construction at high level with PERI safety screen.

The RCS rail climbing system.

Panaromic views of the city from 76 Shenton


Condo at 76 Shenton Way, Singapore

RCS P climbing protection panel


and guardrails
With the RCS P climbing protection
panel, the slab edges on the upper
floors are completely enclosed.
Site personnel is secured against
falling at all times and protected
against strong winds when working
at great heights.

76 Shenton is one of the tallest residential developments at the Central


Business District.

RCS rail climbing system (auto climb)


was used for the core walls due to
the sites spatial constraints, while the
ACS automatic climbing system was
used as a concrete placing boom (CPB)
platform in the core wall for fast and
efficient concreting work. Both systems
have greatly minimised the dependency
on the tower crane. RCS P climbing
protection panel and guardrails (auto
climb) provided a great solution for the
special architectural curved building
edge. Thanks to its flexibility in adapting
to the building line it provided complete
enclosed protection around the building. Site personnel are secured against
falling at all times and protected against
strong winds when working at great
heights.
GRIDFLEX and PERI UP Rosett Flex
were adopted for the slab and beam to
achieve 5-7 days cycle time. This system features a low number of individual
components in a lightweight design.
This contributes to a faster, safer and a
more accurate assembly and dismantling process with a minimum of labor.

Contractor
Kimly Construction
Pte Ltd
Field Service
PERI Asia Pte Ltd

Mr. Yuan Long Sheng,


Project Manager:
PERI has not only provided us
with a safe and fast formwork
system solution, but also with
very good technical on site support.

The RCS rail climbing safety screen


provides perimeter safety.

Productivity ensures completion on time


NTUC Distribution Centre, Singapore

A 16-storey distribution
center is currently being
built at the junction of Benoi
Road and Joo Koon Circle.
It will house the Joo Koon
bus interchange and will be
part of the Joo Koon Integrated Transport Hub. Due to
its fast assembly and dismantling a large amount of the
ST 100 stacking tower has
been chosen. The individual
components can be easily
fitted together without tools,
and heights can be easily

Contractor
Tiong Seng Contractor Pte Ltd
Field Service
PERI Asia Pte Ltd

assembled without requiring


any pre-planning.
Further systems in use
are PERI UP as scaffold,
VARIO GT 24 as wall formwork.
The safety, reliability, and
cost effectiveness of these
systems have all helped
to cut down on construction
time.

The PERI UP Rosett form.


Ms. Ma. Mylene V. Aguinaldo,
Senior Formwork Engineer:
The PERI UP Rosett
shoring system makes
work easier due to its
high flexibility and easy
installation.

The PERI UP Rosett gravity


lock allows easy and safe
assembly.

High Productivity High Flexibility High Safety


PERI UP solution for Bukit Panjang Station
Downtown line 912, Singapore

10

Contractor
Lum Chang Building
Contractors
Field Service
PERI Asia Pte Ltd

Mr. Rao Kolli Sangameshwara,


Project Manager:
We are very satisfied about
the choice of systems used for
our project. PERI offers us an
excellent formwork solution for
our project needs.

The Downtown line is Singapores fifth


Mass Rapid Transit line.

at a depot located at the north end


of Downtown line 2 off Woodlands
Road at Jalan Gali Batu.

It is due to be opened in three stages,


December 2013, 2016 and 2017.
The line will be around 42 km long,
house 34 stations, and serve approximately half-a-million commuters daily,
making it the longest underground
driverless MRT line in Singapore.
Contract 912 is covering the design and
construction at Bukit Panjang station,
including the civil defence shelter and
its associated tunnels.
When completed it will be part of
a 16.6 km long, fully underground rail
transit system with 12 stations connecting the Downtown line 1 station
at Bugis and running along the Bukit
Timah Road corridor before terminating

00

3
15
0

0
15
75

75

25

00

cm

Movable PERI UP table form units are


prefabricated and moved with rollers
onto the next casting position for
re-use without the need for another
fabrication, or even the use of cranes.
Standard rentable walers are used for
forming the chamfer roof, instead of
specially fabricated sales walers, thus
saving cost for our clients.

PERI UP Rosett Flex has a grid system


of 25 cm and 50 cm. The metric grid
dimensions ensure optimal adaptation
in every case.

High Safety.

The lightweight Ledger UH is available


in lengths ranging from 25 cm to 400 cm
with 25 cm or 50 cm increments.
Thereby all required lengths for guardrails
and as decking support are also available.

75

75

The main station, entrances and tunnel


structures are to be constructed by cut
and cover method. Temporary works
consist of secant pile walls, contiguous
bored pile walls and diaphragm walls
depending on the location and supported by reinforced concrete struts/steel
struts and reinforced concrete walers.

cm

High Productivity.
00

0c
15

Using the strengthened Ledger UHV for


spans more than 1.50 m be recommended.
Depending on the load, there is a choice
of two versions.

cm

50

25

50

cm

30

m
0c

cm

High Flexibility.

The UDI industrial decking is available in


lengths from 50 cm to 300 cm, likewise
in increments of 25 cm or 50 cm. The
high degree of flexibility provided by the
decks is a great advantage particularly
regarding fast assembly for complicated
industrial plants.

11

PERI systems for Sixth Avenue Station


Downtown line 917, Singapore

The Sixth Avenue (SAV) is a future


underground MRT station of the new
downtown line in Singapore located between the future King Albert Park (KAP)
and Tah Kah Kee (TKK) stations. The involvement of PERI Asia Pte Ltd includes
the design and supply of formwork for
the slabs, internal walls and skin walls.
This project saw the debut of the
DOMINO panel formwork in Singapore.
Its lightweight wall panels can be
assembled with minimum crane assistance; this is essential for a project of

12

such magnitude. The biggest panel of


2.50 sqm can be easily handled by two
people. With the DOMINO DRS aligment coupler, the forming of the panels
is simple and quick to avoid mistakes
during installation. Also, the tie positions of the DOMINO panel formwork
are fixed, therefore there is no need for
any drilling on site, further reducing the
chance of mistakes.
Due to the nature of the skin walls,
PERI SB brace frames with VARIO GT 24
wall formwork are used for the con-

struction of the skin walls. Using this


combination of SB brace frame and
VARIO GT 24 wall formwork, form ties
are not required. The casting height of
the skin walls were up to 5.30 m high
and in one casting. For the ease of handling on-site in order to avoid obstruction of the king posts and struttings,
guide rollers were installed onto the
SB brace frames to assist the striking
process.

Contractor
McConnel Dowell SEA Pte Ltd
Field Service
PERI Asia Pte Ltd

For the construction of the station


platform, concourse, and roof slab,
ST100 stacking tower is being used.
This heavy-duty shoring system
together with the MULTIPROP slab
props enable the site to cast up to
5.10 m deep beam and 2.00 m thick
slab.
Roof Level
SFL 101.63
Intermediate Level
SFL 100.23

Concourse Level
SFL 94.43

Mr. Barry Mclean, Construction Manager:


PERI has provided a professional service from the
outset. Their VARIO and DOMINO systems are easy
to use, flexible, and cost effective; they also improve
the appearance of the site in terms of organisation
and housekeeping when compared to conventional
formwork. The PERI design support has helped
overcome potential problem areas that have helped
maintain the progress of the project.

Platform Level
SFL 88.83
Under Platform Level
SFL 86.73

Stacking tower ST100


The efficient shoring tower with a minimum of system components
Stacking tower ST 100 has been
designed for fast assembly and dismantling. The individual components are
simply fitted together without tools
and make utilization also at low heights
very cost-effective.

The stacking frame only weighs 7 kg;


it is used for all stacking heights.

The diagonal brace ST 100 has a hook at one


end and the self-locking pivot at the other. This
means assembly can take place very quickly.

The PERI ST 100 stacking tower is simply


slotted together.

13

A business soho with a touch of green architecture


Oasia Downtown, Singapore

PERI GRIDFLEX solution

The GRIDFLEX elements are hooked in from below and swivelled upwards means the erection
of the formwork is very safe. After this, the PEP
prop can be positioned.

14

With the GRIDFLEX, simple labour-saving filler


areas can be realized for any building shape.
The telescopic function provides a flexible
two-dimensional adaptability.

Yellow powder-coated MULTIPROP props offer


a high load-bearing capacity. According to type
calculations,the permissible load-bearing capacity
is up to 90 kN (DIN EN 12812).

Located at the Tanjong Pagar precinct


of the Central Business District in
Singapore, Oasia Downtown is a
27-storey business Soho that blends
the business district with a touch of
green architecture. Each small office
unit is self sufficient for both home
and business. It comes with a kitchenette, private attached bathroom
and dedicated air-conditioning units.
Oasia Downtown makes working and
living in the Central Business District
more convenient and refreshing. PERI
has worked closely with the client
to develop a suitable system for the
requirements given by a highly flexible architectural structure. In order to
cater for the changes of floor height
and structural layout from Soho units
to hotel units, GRIDFLEX and PERI UP
Rosett Flex were adopted to provide
fast, safe and flexible support for slab
and beam.

The climbing system used for this


project is the RCS rail climbing system.
It combines the advantage of different
climbing formworks in one modular
system that makes it easy to adapt to
site specific requirements. Rail guided
climbing is fast and safe in windy
conditions or crane independent with
mobile climbing hydraulics. The RCS
rail climbing system can be used as
formwork scaffolding or as a climbing
protection panel and it is always guided
using the rails which are mounted on
the building. It is also flexible as the
climbing shoe can be attached to the
walls as well as the slab edges.

Through the use of hydraulics, the crane-independent RCS system allows the wall formwork and
platform to climb together in one operation.

Contractor
Woh Hub (Private)
Limited
Field Service
PERI Asia Pte Ltd

Mr. Goh Hock Jin, Site Manager:


PERI has provided us with a
safe and highly efficient formwork
system. With their professional
technical solutions and on-site
support, we are able to achieve
the architectural requirements
and resolve the structural difficulties caused by the different layouts.
Overall, we are confident with
PERIs products and services.

RCS rail climbing system with protection panel.

RCS rail climbing system (standard application)

Use on the
first casting
segment.

Anchoring
The RCS anchoring components with the climbing
shoe which only weighs 20 kg makes easy assembly possible. The quality and high loadbearing
capacity of the PERI climbing anchor is guaranteed
in accordance with official German certification.

Formwork mounting
For assembling and aligning the formwork on
the RCS carriage, SRU steel walers as strongbacks
and SLS spindles as adjustable struts are used.
The adjustment unit serves as levelling device.

Carriage RCS
The formwork is securely mounted on the carriage
and can be retracted by 90 cm without the use of
the crane. Due to the roller bearings, the carriage
is easy to operate as well as being jerk-free.

Concreting
of the standard
cycle.

Rail-guided climbing
with the crane or
self-climbing device.

15

Economical shoring solution for demanding slab heights


Warehouse Greenwich Drive, Singapore

The new four-storey ramp up warehouse will add another 350,000 sqft
to Keppels logistics warehouse capacity in Singapore when completed in
early 2015.
The facilities in the Tampines Logistics
Park will increase Keppels Logistic
operating warehouse capacity by 20%
to beyond 2 million sqft. The air logistic
hub will feature automated storage,
tracking and handling systems, as well
as incorporate environmentally-friendly
building features for enhanced efficiency, productivity and sustainability.

With a floor height of 9.50 m the


maintenance of stability for a tableform
moving on-site is the biggest challenge.
PERI designed a safe solution by choosing and supplying the PD 8 slab table
that guarantees the stability at all times.
To ensure the safe handling on-site;
PERI formwork instructors trained the
customers staff.
In addition, PERI supplied VARIO GT 24
wall formwork, CB 240 climbing system
for the liftcore casting, and VARIO GT 24
column formwork for the column casting.

PD 8 table formwork has been dismantled and moved to another casting.

16

Contractor
DHC Construction
Pte Ltd
Field Service
PERI Asia Pte Ltd

Mr. Yin Xue Gang,


Formwork Supervisor:
We have used PERIs system
formwork as they are both fast and
less labor intensive. They have also
provided us with great technical
solutions.
PD 8 table formwork for clear heights up to 9.50 m.

Self climbing system for Industrial building


A solution for liftcore climbing without crane
Ecotech @ Sunview, Singapore
Ecotech @ Sunview highlights a new
B2 industrial development situated at
Sunview Road. Spanning within the area
of around 303,254 sqft, the 9-storey
development comprises of 424 units
inclusive of a canteen. It is the first time
the RCS rail climbing system has been
utilised on an industrial building the
main reason being the lift core, located
at the furthest end of the building.

could be released for the erection of


the remaining building structure.

By using the crane independent RCS


rail climbing system, crane capacity

With a typical floor height of 6.30 m,


the liftcore is divided into two casts
per floor. The self-climbing liftcore for
the 9-storey building is used 18 times
for a casting height of 3.15 m. Besides
this, slabs of up to 7.20 m high were
cast with the cost effective PD 8 table
system, covering large slab areas.
Height changes were easily adapted
by adding/removing the tables

RCS rail climbing system for the liftcore.

PD 8 table system for casting of slab and beams.

Contractor
SH Design & Build
Pte Ltd
Field Service
PERI Asia Pte Ltd

Mr. Dennis Chan,


Senior Project Manager:
PERI have provided us with a
safe and highly efficient formwork
system. They have provided good
technical support both on-site and
off-site to adapt to urgent changes
and problems.

17

PERI system helps to accelerate the construction progress


and to reduce wastage
PRIMAX @ 22 New Industrial Road, Singapore
Contractor
Interpro Construction
Pte Ltd
Field Service
PERI Asia Pte Ltd

VARIO GT 24 column formwork with full concreting platform coverage and access ladder providing
safe working areas.

PD 8 table formwork system with drop panel for


casting of slabs.

PRIMAX is an industrial property


located at New Industrial Road
in District 19. It is primarily used for
Light Industrial (B1) space.

the CB 240 climbing system for both


casting liftcore and staircase walls.

Construction work started in the


1st quarter of 2014 with the use of
the VARIO GT 24 wall formwork and

18

For concreting the columns of the building, VARIO GT 24 column formwork


was utilised. Slabs with heights varying
from 7.00 m to 3.50 m have been cast
with PD 8 slab table due to its flexibility

Mr. Min Than Win NIR,


Site Engineer:
PERI formwork system is safe
and easy to use. Besides, technical
on-site support is good.

in height adjusting.
Advance planning sessions of
PERI design engineers, together with
the contractor, ensure that pre-fabricated column forms and table forms
are re-usable for the next casting.

PERI slab table for emerging markets in Asia


Festival Mall Expansion, Philippines
with people coming in from as far
south as Cavite, Laguna and beyond.
With the expansion, Festival Mall
is moving into the next phase of its
masterplan.
Developed by the Filinvest group,
the expansion will add eight hectares
of gross floor area to the shopping
complex, bringing its total to almost
30 hectares. It will add another
600 food and retail concepts on top
of the 700 that they have at the
moment.
The Philippines are part of PERIs
engagement in the emerging markets.
Festival Supermall is a 4-storey,
20-hectare shopping complex at the
heart of Filinvest Corporate City (FCC),
Alabang, Muntinlupa city.
It has a mall occupancy of up to 90%
and average traffic of 100,000 a day

Contractor
EEI Corporation
Field Service
PERI Asia Pte Ltd

Mr. Hermie Ander,


Project Manager:
We found PERI easy to use
and it improved our cycle from
12 days to 9-7 days. I recommend
the PD 8 system, especially for
ceiling heights of 4 m and above.

PD 8 slab table was chosen as this


system could be moved as a complete
table form rather than taking the system
apart and moving it as individual items
each time.
The project area is approximately
181,021 sqm and the duration of
the project is 16 months, estimated
to be completed by end of 2015.
19

PERI The service provider


We offer more than just products
The broad range of PERI equipment and systems offer the perfect solution for every requirement.
However, the PERI range of services goes far beyond the likes of production, and system equipment sales and rental.

Technical solution

Logistics

Due to our engineers in-depth understanding of the needs


of our customers, they are able to develop the best projectrelated solutions for them. These services include, if required,
static calculations as well as assembly plans for special
formwork. Although 90% of the formwork project requirements can be covered using standard equipment from the
broad PERI product range, a special construction is, however,
sometimes more cost-effective and it is exactly here that
the engineers apply their expertise with great effect.

PERI has the worlds largest rental equipment pool that


supplies its customers reliably, fast and with a high level
of flexibility. Just in time deliveries and return deliveries
according to the particular construction schedule.

Onsite support

Training

PERI formwork instructors provide an extensive professional


on-site briefing. This means that any improper handling
can be avoided and the risk of accidents are greatly reduced.
Using the systems even more efficiently accelerates the
construction progress.

Our training programme includes both seminars with


specified content and individualised courses. In doing so,
we support our customers by enabling them to find out
about the latest formwork and scaffolding technologies for
more efficiency, and to be able to pass on this knowledge.

The photographs in this brochure feature construction sites in


progress. For this reason especially safety and anchor details
cannot always be considered as conclusive or final. These are
subject to the risk assessment carried out by the contractor.
PERI GmbH

PERI Asia Pte Ltd


Formwork Scaffolding Engineering
No. 1 Sims Lane #04-07
Singapore 387355
Phone +65 6744 2989
Telefax +65 6744 3693
pha@periasia.com
www.periasia.com

SG en 10 | 2014 793592 0.85xp PERI GmbH

For very large material requirements, the local team works


closely with other logistics locations thus ensuring an optimal
delivery service to the construction sites.